Dear Colleagues,

We will meet today at 11:30 (EST) for the RC meeting.
Location: CH Room 200C and online via ZOOM
ZOOM URL link<https://urldefense.proofpoint.com/v2/url?u=https-3A__jlab-2Dorg.zoomgov.com_j_1605705819-23success&d=DwIGaQ&c=CJqEzB1piLOyyvZjb8YUQw&r=xvIrZb1p8HoRayKD1Sz8zPzqi4-qHfiBCWqgj3oMbOQ&m=lQFuPQb3bNk9z7qad4ycC0y98RWKrsA9S6bE02og1V5AAuBICq87Z0qjdctjv3qp&s=nys8Jfh64OUykC0FrDmOk4UbAkJf64yemIhZWy3ucJw&e= > (including passcode)
ZOOM meeting ID: 160 570 5819


Please find a detailed report for the past 24h data-taking of July 15th: RC summary: https://logbooks.jlab.org/entry/4419181 

  *   MCC took beam-down for the 4th pass RF at around noon 12pm. We requested controlled access. Florian and Sergey went down and replaced BAND TDC inherited from Hall C, work done at 4:30 pm<https://logbooks.jlab.org/entry/4418625 >. MCC took longer than expected<https://logbooks.jlab.org/entry/4418610 > to bring back beam until around 10 pm. After empty the target, we conducted 2H01<https://logbooks.jlab.org/entry/4418720 > , 2C24A harp scan here<https://logbooks.jlab.org/entry/4418733 >, and two additional harp scans by modifying the 2C24 x position (-2.0 -> -1.8mm<https://logbooks.jlab.org/entry/4418754 >) and y position ( 1.3 -> 1.1mm<https://logbooks.jlab.org/entry/4418766 >) by 2mm to study the stability.
  *   After that, we filled target and requested beam back. Resumed physics data taking starting mid-night 23:57pm. RC will be turned over to Florian Hauenstein.


Our plan is to continue the physics run on 4He + 325nA until the MCC maintenance day, Thursday 7 am.

Best,
Zhiwan

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/alert_collaboration/attachments/20250716/6848e17f/attachment-0001.htm>


More information about the Alert_collaboration mailing list