Talk #1: Whitney (30+15 minutes) -------------------------------- Hardware: - Detector (AHDC+ATOF) integration in the cleanroom and final testing - Detector installation in Hall B - Detector cabling - Electronics and power installation - Gas system testing and installation - Target straw testing - Target installation - Survey and alignment - In-situ helium leak checks and monitoring Hardware Testing: - Power-up tests of AHDC and ATOF - Noise-level checks in Hall B - Testing of Petrioc and NALU boards for ATOF - Testing of clock distribution boards - Testing of AHDC readout - Cosmic ray and source testing of detector Slow Controls: - LV and HV systems controls - Detector alarm handling - Monitoring and interlocks (software and hardware) - Channel map status DAQ/Trigger: - Trigger status (DC roads and secondary triggers) Talk #2: Michael (30+15 minutes) -------------------------------- Software: - Development of reconstruction software - Implementation of ALERT into CED - Integration of ALERT into CAOS online reconstruction - Monitoring plots for ALERT (stand-alone or part of mon12) - Decoder updates Calibration: - Development of AHDC and ATOF calibration suite - Calibration challenges to test software algorithms and implementation - Integration of Run Group into CALCOM - Planning for online calibrations Monte Carlo: - Studies of background configuration in CLAS12 in final ALERT configuration - Operating conditions for experiment Talk #3: Raphael (20+10 minutes) -------------------------------- Safety & Documentation: - Preparation of safety paperwork (COO, RSAD, ESAD) - Preparation of ALERT system operations manual - Preparation of ePAS (as necessary) for ALERT - Preparation of hot checkout interface - ERR sign-off - Commissioning plan for ALERT detector - Preliminary run plan for RG-L