[All_jlau] JLab Power Outage Starts at 7a.m. Sat., Aug. 21, 2010

deborah magaldi magaldi at jlab.org
Thu Aug 19 15:24:09 EDT 2010



Beginning at 7 a.m. Saturday, the JLab buildings that have been on 
generator-provided electrical power this week will experience a power 
outage while they are put back on the regular electrical grid. According 
to Facilities Management and Logistics staff, this should be completed 
before the end of the day Saturday.

The buildings to be impacted include:

CEBAF Center, Bldg. 12

EEL, Bldg. 90

Test Lab, Bldg. 58

Buildings 52, 57, 59 and the surrounding trailers

Occupants of those building that will be without electricity on 
Saturday, please see specific guidance below.

Please don't attempt to enter any building while the power is off to 
that building.

If you work in any of the facilities that will experience a power outage 
on Saturday, before leaving on Friday:

-- Completely shut down your computer, turn off your UPS 
(uninterruptable power supply) box and if possible, unplug the box from 
the wall outlet.

-- Turn off and unplug unnecessary electrical equipment, i.e. lamps, 
office lights, office equipment, etc.

-- Leave refrigerators and copy machines and printers on. If a copy 
machine or printer is off-line on Monday morning, please reboot it. Call 
the Copy Center, ext. 7666, if it isn't working after rebooting it.


*JLab Scientific Computing Outage*
Due to the power outage on Saturday, all Scientific Computing servers 
and batch farm systems will be shut down by 7 a.m. Saturday, Aug. 21. 
The systems should be back up by late Saturday evening, or within a few 
hours of the successful return of electrical power. All Computer Center 
users are asked to plan work accordingly.

Jefferson Lab will be open for normal business on Monday. Quark Cafe 
will be open as usual. Throw away food in kitchenette refrigerators that 
has been left unrefrigerated too long. Heed all construction cones, 
tapes, barricades and signage. Don't park in unmarked areas or along roads.


/This message is being sent on behalf of Facilities Management and 
Logistics./


Thank you and regards,
Deb Magaldi
Jefferson Lab
Public Affairs
12000 Jefferson Ave., Suite 15
Newport News, VA 23606
ph. 757-269-5102

-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://mailman.jlab.org/pipermail/all_jlau/attachments/20100819/61dca5b5/attachment-0001.html 


More information about the All_jlau mailing list