<html><body style="word-wrap: break-word; -webkit-nbsp-mode: space; -webkit-line-break: after-white-space; "><div><font class="Apple-style-span" face="Arial">To access the full version of the JLab Weekly Briefs, visit:&nbsp;</font><a href="http://www.jlab.org/news/briefs/index.html"><font class="Apple-style-span" face="Arial">http://www.jlab.org/news/briefs/index.html</font></a></div><div><font class="Apple-style-span" face="Arial"><br></font></div><div><font class="Apple-style-span" face="Arial">July 14 Briefs Excerpts:</font></div><div><font class="Apple-style-span" face="Arial"><br></font></div><div><div><div><font class="Apple-style-span" face="Arial"><b>Antivirus Software Upgrade Scheduled for Monday</b></font></div><div><font class="Apple-style-span" face="Arial">Starting July 19 at 7 a.m., the CNI group will send out a package to all JLab Windows systems to upgrade the antivirus software. The new software is called Symantec Endpoint Protection. This upgrade is necessary to support new Windows 7 and 64-bit operating systems. The upgrade will be automatic, with no user interaction required, but systems must be on and connected to the network for the upgrade to commence. Please turn on all your Windows systems (desktops and laptops) the morning of July 19. If you have any questions about this upgrade, call the IT Helpdesk at x7155.</font></div><div><font class="Apple-style-span" face="Arial"><br></font></div><div><font class="Apple-style-span" face="Arial"><b>New SOTR Training And Certification Process</b></font></div><div><font class="Apple-style-span" face="Arial">JLab's Subcontracting Officer's Technical Representatives (SOTRs) handle a wide range of contract management responsibilities, providing oversight on everything from ensuring that the subcontractor is complying with JLab policies to monitoring work progress. To help prepare SOTRs for their responsibilities, the Procurement Department has instituted a training class and a certification process for all current and new SOTRs. The class, GEN020 SOTR Training, is offered on the last Wednesday of every month, from 8:30 a.m. to noon in ARC 428. Current SOTRs have one year to complete the process, while new SOTRs must do so before assuming their duties. You can sign up for the class online through the Training and Development webpage:&nbsp;<a href="http://www.jlab.org/div_dept/train/">http://www.jlab.org/div_dept/train/</a></font></div><div><font class="Apple-style-span" face="Arial"><br></font></div><div><font class="Apple-style-span" face="Arial"><b>Test Lab Parking Lot Closure</b></font></div><div><font class="Apple-style-span" face="Arial">All parking lots on the west side of the Test Lab, Building 58, have been permanently closed for construction of the Technology and Engineering Development Facility. All Test Lab parking is now on the east side of the Test Lab and in the adjacent EEL, Building 90, expanded parking lot. In addition, the Test Lab may now only be entered through the doors on the east and north sides of the building. The main lobby entrance is closed; a card reader has been installed outside the former lobby Fire Exit door, which is now the lobby entrance (northwest corner of Test Lab).</font></div></div></div><div><font class="Apple-style-span" face="Arial"><br></font></div><div><font class="Apple-style-span" face="Arial">To access the full version of the JLab Weekly Briefs, visit:&nbsp;</font><a href="http://www.jlab.org/news/briefs/index.html"><font class="Apple-style-span" face="Arial">http://www.jlab.org/news/briefs/index.html</font></a></div><div><font class="Apple-style-span" face="Arial"><br></font></div><div><font class="Apple-style-span" face="Arial"><br></font></div><div><br></div></body></html>