Dear Elton,
thanks for the update.
We'll check once again that the measurement locations (the two wells
position) are what we wanted (compatible with reasonable rates).
They are probably right, but in case something need to be changed we'll
let you know asap.
We do not if you have the top-flange of the vessel in your hands for
further machining but I guess any actions will happen after the Xmas brake.
Yesterday we discussed our shift plans concluding the following:
- I and/or Mariangela will be on-site from Tue 9 (at least), to (at
least) the 19th to work on the detector: reassemble, checkout and test.
The goal is to have the BDX-Hodo and the DAQ fully operational taking
cosmic data by the end of Jan.
- Mariangela (and if necessary Marzio and probably Andrea) from Jan the
19th to the 26th (or more) to help Tim and Tom with the mechanics: test
the detector handling system
We would keep as baseline dates for tests Feb 20- March 2nd as most
probable weeks (to be sure that the wells are dug, the detector handling
system is done and the machine delivers 10 GeV). It may be possible an
update in mid Jan when the acc will be resumed. I heard rumors that the
tritium run (in Hall-A) that requires low energy will be reporposed till
the end of Jan (since no data were taken in December). This means that
Hall A will get the high energy in Feb. We'll see in January.
Marry Xmas and happy new years to all BDXers!
Marco
Elton Smith wrote:
> Hi BDX,
>
> I had a scheduling conflict with the meeting this morning and the end
> of the physics run. The civil contract to dig the wells is proceeding.
> I added a sketch of the well locations and offset points to this
> morning's agenda at
> https://urldefense.proofpoint.com/v2/url?u=https-3A__wiki.ge.infn.it_hps_index.php_December-5F21-5Fmeeting&d=DwICAw&c=lz9TcOasaINaaC3U7FbMev2lsutwpI4--09aP8Lu18s&r=fi3LZSf8iWcLRaOze3M0UA&m=5eaYfVYnasLR_RxCxxORIJHJD8uvcB9l-XDg58k8cAg&s=mESuHmhJCxZvEI2z_Eym_YpnU1DYIhprNo46Wx2UjVY&e= . Stakes have
> been driven into the ground at corresponding locations. The stakes
> correspond to the locations of the wells and stakes that are 6' and
> 12' offset from the well locations.
>
> Cheers and Happy New Year to all,
>
> Elton.
>
> Elton Smith
> Jefferson Lab MS 12H3
> 12000 Jefferson Ave STE 4
> Newport News, VA 23606
> (757)269-7625
> (757)269-6331 fax
>
> On 12/21/17 8:23 AM, Marco Battaglieri wrote:
>> Dear colleagues,
>> We will have a BDX meeting today Thursday December 21 at 10:30AM(EDT)
>> (7:30AM LAX, *1*6:30 Rome, 15:30 UK).
>>
>> The agenda is posted here:
>> https://urldefense.proofpoint.com/v2/url?u=https-3A__wiki.ge.infn.it_hps_index.php_December-5F21-5Fmeeting&d=DwICAw&c=lz9TcOasaINaaC3U7FbMev2lsutwpI4--09aP8Lu18s&r=fi3LZSf8iWcLRaOze3M0UA&m=5eaYfVYnasLR_RxCxxORIJHJD8uvcB9l-XDg58k8cAg&s=mESuHmhJCxZvEI2z_Eym_YpnU1DYIhprNo46Wx2UjVY&e=
>> feel free to add items or issues you want to discuss
>>
>> For remote connection, follow the link reported below.
>> https://urldefense.proofpoint.com/v2/url?u=https-3A__bluejeans.com_152283684&d=DwICAw&c=lz9TcOasaINaaC3U7FbMev2lsutwpI4--09aP8Lu18s&r=fi3LZSf8iWcLRaOze3M0UA&m=5eaYfVYnasLR_RxCxxORIJHJD8uvcB9l-XDg58k8cAg&s=mBx1QqXQpLVphB5lkJG2H1A2u0xRTDtaXakFKtWAvas&e=
>>
>> Talks to you tomorrow
>> Cheers
>> Marco
>>
>>
>> _______________________________________________
>> BDXlist mailing list
>> BDXlist at jlab.org
>> https://mailman.jlab.org/mailman/listinfo/bdxlist
>
> _______________________________________________
> BDXlist mailing list
> BDXlist at jlab.org
> https://mailman.jlab.org/mailman/listinfo/bdxlist
More information about the BDXlist
mailing list