Logentry Text:
--
Yesterday:
18:29 Finished Deuterium data with 1-pass and tours out-bending; changed target back to Hydrogen https://logbooks.jlab.org/entry/3820207
22:03 RTPC HV trips; brought back https://logbooks.jlab.org/entry/3820292
Take data on Hydrogen through remainder of Swing and in to Owl
Today:
Onset of Tropical Storm
01:17 Beam starts tripping
02:00 Tornado warning until around 02:05. Shift workers go to shelter during this.
02:30 Call from MCC to inform that machine will be back only after 10 am when the storm is over. Magnets are ON and the gas flow to the detectors is also ON, but all HV are OFF.
05:10 RTPC flow is reduced to 230sccm even if there is no increase in RTPC pressure (RTPC - ambient remained almost constant)
07:20 Call from Eugene to inform that he is de-energizing magnets https://logbooks.jlab.org/entry/3820407
Told Accelerator will be back only after 10 am when the storm Isaias goes away from Newport News https://cebaf.jlab.org/dtm/open-events?event_id=6711
At 08:00 MCC meeting we were given an estimated time range for beam possibly returning somewhere between 22:00 tonight and 08:00 tomorrow morning. After talking with the PDL and Hall B Leader, it seemed prudent to not have day shift expert come in today and for swing expert to check in at 20:00 tonight.
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3820414
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/bonuslist/attachments/20200804/ddc57aea/attachment.html>
More information about the Bonuslist
mailing list