Hi All,
this is the status and report of the BONuS experiment (Run Group F), Wednesday, August 12th, 2020.
* OWL + DAY: report from Stephan B. https://logbooks.jlab.org/entry/3825827
* SWING: besides some beam issues due to the electric storm https://logbooks.jlab.org/entry/3825867 the Hall got beam as far the accelerator was able to provide.
* as per Valery K. request, new trigger configuration file was loaded https://logbooks.jlab.org/entry/3825879 and https://logbooks.jlab.org/entry/3825912
* some annoying alarms were identified and solved: https://logbooks.jlab.org/entry/3825983 --> https://logbooks.jlab.org/entry/3825987
* Mohammad notice at the start of his shift that the BlueJeans connection to the screen was off. He will solve the issue.
* no important issues to highlight.
I replaced Stephan B. as RC around 15:00.
We are running at 200nA @ 10.2 GeV
Logbook Shift summaries:
Owl: https://logbooks.jlab.org/entry/3825328
Day: https://logbooks.jlab.org/entry/3825613
Swing: https://logbooks.jlab.org/entry/3825902
We will have our RC Daily meeting at 12 pm.
BlueJeans link:
https://bluejeans.com/7576835804
Cheers
-Carlos
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/bonuslist/attachments/20200813/b6809166/attachment.html>
More information about the Bonuslist
mailing list