Hi All, <br>
</div>
<div style="color: black; font-size: 12pt; font-family: Calibri, Arial, Helvetica, sans-serif; background-color: white;">
<br>
</div>
<div style="color: black; font-size: 12pt; font-family: Calibri, Arial, Helvetica, sans-serif; background-color: white;">
this is the status and report of the BONuS experiment (Run Group F), Friday 20th, 2020.</div>
</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0); background-color: rgb(255, 255, 255);">
<ul>
<li>early in the morning the Accelertor Ops finished the calibration of the BPMs</li><li>finished small tasks in the hall</li><ul>
<li>checking of gas leaks and set bubblers levels</li><li>bubbler camera</li><li>RadCon Survey of RTPC 1 and instructions how to translate it to EEL 125</li><li>Final checks from Dan C., Yuri G. and Stepan S. <br>
</li></ul>
<li>We were ready for Hall Sweep at 12:15 (one hour over my estimation). Started at 12:40, finished at 13:10.<br>
</li><li>During the sweep Eugene P. proceed to ramp up the magnets (4T solenoid, 20kG Torus)</li><li>Harp scans at tagger started at 14:50 due to issues with the injector.</li><li>Tagger degaussed ~14:50 and started to fine tuning beam at Faraday cup (2H01 and 2C24), finished ~17:30<br>
</li><ul>
<li>BOM not working (Nathan B. notified) </li><li>Beam position by Halo Counters (2C24): X: 0.1mm Y: -0.4mm<br>
</li></ul>
<li>In the meanwhile target was filled with D2 (Sebastian) and RTPC always flowing with pre-mix gas.</li><ul>
<li>no visible bubbles, but apparently everything in order<br>
</li></ul>
<li>17:35 ready for production. 240 nA, Target 65psig of D2. <br>
</li><li>MCC called for interruption of the beam ~17:50 for one hour, Eugene P. was called for an opportunistic access to the hall and check of the BOM</li><ul>
<li>unsuccessful attempt. Eugene P. instructed to call Ben Raydo starting next week in any opportunistic access to the hall.
<br>
</li></ul>
<li>I was requested to have a short run (~30) with empty target, so we proceed to empty it (emptied ~19:00)<br>
</li><ul>
<li>here starting the issues with the HV control, being unstable the voltage difference bias between the layers<br>
</li></ul>
<li>I access the hall to connect the shunt to GEM3 Out HV</li><ul>
<li>changed set values to the HV (voltages and current for different layers)<br>
</li></ul>
<li>Empty target run finished ~21:00. Beam stopped to fill the target. <br>
</li><ul>
<li>most of the time was trying to solve the HV isssues. </li></ul>
<li>Mohammad took control remotely of the HV problem</li><ul>
<li>mainly was a sudden ramping down of the cathode without apparent reason</li><li>the solution (I guess temporal), is to off-on in expert mode the channel ramping down to make it start ramping up to the set voltage.</li><li>it was set an alarm everytime the RTPC HV starts to ramp down so the shift taker can execute the solution inmediately.<br>
</li></ul>
<li>First production run (240nA @ D2) started at 10:50, finished at 11:55</li></ul>
<div><br>
</div>
<div>The only apparent issues to solve:<br>
<ul>
<li>BOM (under control)</li><li>RTPC HV (more critical)<br>
</li></ul>
</div>
<div>I think that we are not bad in the schedule although the problems we got.<br>
</div>
<div><br>
</div>
<div><br>
</div>
<div>Logbook Shift summaries:<br>
Day: <a href="https://logbooks.jlab.org/entry/3806513" style="" id="LPlnk298107">
https://logbooks.jlab.org/entry/3806513</a><br>
Swing: <a href="https://logbooks.jlab.org/entry/3806686" style="" id="LPlnk830621">
https://logbooks.jlab.org/entry/3806686</a><br>
</div>
<div><br>
</div>
<div><br>
</div>
<div>We will have the Daily Run Group F Coordination Meeting at 10AM via BlueJeans</div>
<div><br>
</div>
<div><a rel="nofollow" href="https://bluejeans.com/7576835804" id="LPlnk153273" style="">https://bluejeans.com/7576835804</a></div>
<div><br>
</div>
<div>Cheers</div>
<div><br>
</div>
<div>-Carlos<br>
</div>