[Bteam] Note: Hall B is deferred until Wednesday -- Re: tentative plan
Michael Tiefenback
tiefen at jlab.org
Mon Jul 12 17:40:50 EDT 2010
ADDENDUM: HALL B HAS DEFERRED TAKING BEAM UNTIL WEDNESDAY. We have
another three shifts to utilize for beam studies as this is productive.
But remember, you'll have to provide a summary for the Wednesday
meeting Beam Studies report.
Michael Tiefenback
Jay Benesch wrote:
> Monday
> 0800-0900 Injector entry for RHWP
> 0900-1300 RF recovery NL, SL in parallel with
> injector work injector work Reza, Alicia
> http://opsweb.acc.jlab.org/CSUEApps/atlis/task/10038
> http://opsweb.acc.jlab.org/CSUEApps/atlis/task/10040
> 1300-1700 Spata arc 1
> http://opsweb.acc.jlab.org/CSUEApps/atlis/task/10035
> 1700-2000 Joe Grames injector work - his choice of priority 3
>
Kent Paschke and Mark Dalton have submitted a test for studying
"Helicity Correlated Asymmetries" and its required half-wave plate has
been repaired so the measurements are possible. I have provisionally
re-scheduled this for 20:00-24:00 today, 12 July, displacing the following.
TIME SHIFT.....4 hrs later
> 2000-2130 Autoquad or quad center 0L-0R; elog; don't change in machine
>
> 2130-2230 Set recovered cavities to 3 MV/m, step tuners if needed,
> re-lem, recover Five pass beam to hall B dump
>
>
I believe that the NL recovered cavities have been placed back into
service. This may happen for the SL during "slow times," and so may not
require much dedicated time.
> 2330 parasitic Q measurements in parallel with Autoquad beginning with
> arc 3 BPMs. Through owl shift to 0800. Again, elog but don't change
> the values in the machine.
>
>
The 08:00 slot is to be used for the displacement measurement, rather
than continuing the series of autoquad measurements.
> Tuesday
> 0800 RF separator displacement measurement
> http://opsweb.acc.jlab.org/CSUEApps/atlis/task/10037
>
> 1200-1500 more injector tests, either Ken Law or Joe Grames
>
I have been told that Grames cannot support this time, but I do not now
know about Ken Law. I may divert some of this time to injector
transmission vs. laser pulse length investigations.
> 1500-1700 two pass setup to hall B
>
>