Preparing for the Spring 2015 run, the set of prioritized beam study
campaigns is presented below. Priority is based on preparing for a
12GeV run in the fall, improved CEBAF uptime and IPAC2015.
I've assigned names. If you have been assigned a measurement, please
start developing ATLis's for the measurement in question and submit them
so that these tasks can be scheduled. Most of these measurements
(tasks 1,2,3) can be made with tune-mode beam and should be completed
before we transition to 750MHz separation (the first two weeks of beam
operation).
*All measurements shall be reported with error bars representing the
best estimate for a one sigma error.*
Arne
1 Spring 2015 Beam Studies Campaigns
<2015-02-05 Thu 07:22>
1.1 Beam transverse emittance evolution
Who
Todd, Roblin, Grames, Kazimi, Tief
1. 10.5 GeV setup
Location ε_x ε_y β_x β_y α_x α_y MSL elogs
5Mev Design Must
Grames Measured
End of Injector Design Must
Kazimi Measured
1E or 2E Design Should
Tief Measured
Hall-B 1-pass Design Must
Tief Measured
3E or 4E Design Must
Todd Measured
5E or 6E Design Should
Todd Measured
7E Design Must
Yves Measured
9E Design Must
Todd Measured
Hall-A 5-pass Design Must
Yves Measured
Hall-D Design Must
Todd Measured
1.2 Beam longitudinal evolution
1. Bunch length
1. Phasing Techniques
Who
Poelker, Ahmad, Tief
1. No Compression
All locations are at Must level
Location Who Measured Design technique elogs
σ_l σ_l
kev Poelker Chopper scan
5MeV Ahmad Back phasing into spectrometer
Inj. Chicane Ahmad Inj. SLM
Arc1 Ahmad Arc1 SLM
Arc2 Ahmad Arc2 SLM
2. Optimized Compression
All locations are at Must level
Location Who Measured Design technique elogs
σ_l σ_l
kev Poelker Chopper Scan
5MeV Ahmad Back phasing into spectrometer
Inj. Chicane Ahmad Inj. SLM
Arc1 Ahmad Arc1 SLM
Arc2 Ahmad Arc2 SLM
2. Real Time Interferometer
Who
Ahmad, Gubeli, Krafft, Freyberger
(no term)
Determine if this device is viable or not.
(no term)
High current to BSY dump on first pass.
(no term)
Scan, integrate, try everything.
(no term)
Draw conclusion about why it does or does not work.
2. Energy Spread
Who
Poelker, Grames, Kazimi, Freyberger
Location Who Measured Design Measured Design technique elogs
\frac{dp}{p} \frac{dp}{p} σ_E σ_E
kev Poelker
5MeV Grames 5MeV spec
107MeV Kazimi Inj. Spec.
Inj. Chicane Freyberger INJ SLM
Arc1 Freyberger Arc1 SLM
Arc2 Freyberger Arc2 SLM
Hall-A (5-pass) Freyberger IHA1C12
1.3 Beam based data for model development
Who
Yves, Todd and model team
(no term)
collect LOCO/ray-trace in all the S/Arc/R sections for determination
of body gradients and other model information
Location Data collected Body gradients Comment elogs
Arc1
Arc2
Arc3
Arc4
Arc5
Arc6
Arc7
Arc8
Arc9
ArcA
1C
2C
5C
1.4 Push CW current to ASE limit in Hall-A
Who
Yves, Spata
(no term)
Probe 5-pass setup to its limits.
(no term)
Document limitations
(no term)
Identify corrective actions that need to be applied during the
Summer2015 SAD.
1.5 Reproducible CEBAF
Who
TBD
(no term)
Cycle Mag/RF does beam reproduce? If not, why not?
(no term)
Some of this data will be gather parasitically with unplanned accesses
1.6 Scalable CEBAF
Who
Yves
(no term)
What are the model vs design trends as a function of time and CEBAF
energy for the CEBAF setup.
--
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab
12000 Jefferson Avenue Cell: (757) 876-6289
Postal Suite 19 Email: freyberg at jlab.org
Newport News, VA 23606
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/bteam/attachments/20150205/23ec55c3/attachment-0002.html>
More information about the BTeam
mailing list