[BTeam] status on the TODO list for next tuesday
Yves Roblin
roblin at jlab.org
Wed Oct 20 15:32:47 EDT 2021
Here is what we had on the list:
Run a raytrace in 8E/8S region to study betatron in 8A/8R->9L (ATLIS, dennis) Not done yet. If that is still desirable, we can write an ATLIS and do it. Takes about 30-45 minutes to acquire the data.
Look at raytrace taken in injector proper and develop method to check match into NL. Not done yet. Still have to devise a strategy for this.
Multiwire emittance measurement tests, ARC7 SLM tests.
Today, they did work on the SLMs in the tunnel.
During the Hall A setup, we took data for looking at the multiwire emittance procedure.
Longitudinal optics measurements at exit of injector (bunch length, bunch orientation), Brian has an ATLIS. Upright bunch is the desired orientation (minimum espread at crest) -> 2 hours?
Update on this ? We just need an ATLIS
Need to get in the tunnel to work on ARC7 SLMs + another long RF recovery day to get enough RF capacity to run 980.
Work was done today for RF recovery and on the SLMS.
Write a reconfig plan for scaling the machine at 980 (Yves, Dennis), Apels write/check that they have a plan to setup the halls post rescaling.
We have a draft ot the plan, its currently discussed between a few of us before we post it as an ATLIS for further comments.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/bteam/attachments/20211020/5403a55e/attachment.html>
More information about the BTeam
mailing list