Tomorrow 3/06:


  1.
700am access to NL to go fix 8R09 valve, expected time 2 hours.

During this time:

         1.1) Weekly SCL measurement (15 min) (jlab.org)<https://tasklists.jlab.org/bslist/tasks/111106>  by Joe Grames (around 800am, takes 15 minutes) to PCUP
          1.2) Mike Tiefenback can opportunistically do Q0 measurements from 7 ->9  in South Linac (no beam needed, just power permit)
https://tasklists.jlab.org/bslist/tasks/111038


  1.  at 900 or so (as soon as access is done for the vacuum valve) we launch into the BLM testplan

https://tasklists.jlab.org/bslist/tasks/107920

  expected time 8 hours.

  1.  at 5pm we start recovering beam for physics, expected to deliver beam back to physics by 7pm.




-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/bteam/attachments/20240306/9ad17226/attachment-0001.html>


More information about the BTeam mailing list