https://logbooks.jlab.org/entry/4362360 has the last calculation. Hall D will be moving to production this weekend and will want the waist moved downstream. My suggested beginning is at the top of the elog entry. https://gryphn.phys.uconn.edu/halld/cobrems/harptool_2d.cgi is the tool used.