<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
  </head>
  <body>
    <title>BTeam-2011-02-02</title>
    <meta http-equiv="Content-Type" content="text/html;
      charset=ISO-8859-1">
    <meta name="generator" content="Org-mode">
    <meta name="generated" content="2011/02/02 13:03:45">
    <meta name="author" content="Todd Satogata">
    <style type="text/css">
  html {
        font-family: Times, serif;
        font-size: 12pt;
  }
  .title { text-align: center; }
  .todo  { color: red; }
  .done { color: green; }
  .timestamp { color: grey }
  .timestamp-kwd { color: CadetBlue }
  .tag { background-color:lightblue; font-weight:normal }
  .target { background-color: lavender; }
  pre {
        border: 1pt solid #AEBDCC;
        background-color: #F3F5F7;
        padding: 5pt;
        font-family: courier, monospace;
  }
  table { border-collapse: collapse; }
  td, th {
        vertical-align: top;
        <!--border: 1pt solid #ADB9CC;-->
  }
</style>BTeam -<br>
    <br>
    Here is an agenda for this afternoon's BTeam meeting. It will almost
    entirely focus on<br>
    the tactical issue at hand, namely how to diagnose the current
    machine problems and<br>
    restore reliable 150+ uA beam to Hall C with the 130 kV injector gun
    HV setup. Please<br>
    bring your ideas and your open minds so we can come up with some
    recommendations<br>
    for tuning for tomorrow to stabilize for the weekend.<br>
    <br>
    Apologies for the lateness of this email -- it's been one of those
    weeks. Thanks!<br>
    <br>
    -Todd<br>
    <br>
    <h1 class="title">BTeam-2011-02-02</h1>
    <div class="outline-2">
      <h2 id="sec-1">1 2011-02-02 Wed 14:00 BTeam Meeting Agenda</h2>
      <div class="outline-3">
        <h3 id="sec-2">1.1 Optics-on-Call Report: Byung/Yves =>
          Balsa/Alex</h3>
        <p>This has been a very eventful week with serious struggles to
          get high
          current operations back to hall C (1) and parity quality beam
          back to
          hall B (5) yet again. Optics have investigated injector optics
          and
          assisted with an observation of asymmetric quad settings in
          the
          injector chicane. Restoration of injector chicane quad
          symmetry
          helped restore high current beam operations on Mon 1/31 before
          it was again lost during gun HV=>130kV on Tue 2/1.
        </p>
        <p>
          The majority of the BTeam meeting this week will focus on
          ideas for
          diagnosing the Hall C high current problem and restoring high
          current
          operations to Hall C. We are committed to moving forward with
          the
          130 kV injector gun HV.
        </p>
        <p>
          Upon restoration of routine high intensity operations, Hall C
          will
          likely want a spin dance (or mini-spin dance) and Compton
          cleanup,
          but these are second order compared to the first order problem
          of
          restoring reliable high-quality high-intensity beam.
        </p>
      </div>
      <div class="outline-3">
        <h3 id="sec-3">1.2 Beam Studies Report</h3>
        <div class="outline-4">
          <h4 id="sec-4">1.2.1 <span class="done">DONE</span>? 5s
            Motion In Injector From Polling: Suleiman/Higgins (~1h)</h4>
          <p><a href="https://cebaf.jlab.org/atlis/task/10739">ATLis
              10739</a>: Done AM Wed 2011-01-26, confirmed polling/vert
            motion
            correlation. Polling left off after study. Was originally
            observed
            about 1y ago. Seems to be someting within controls, as all
            polled
            items are downstream of first observed BPM 5s motion. Still
            noting
            1s intermittent motion. Vector voltmeters entirely
            disconnected
            on 2011-02-01.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-5">1.3 Beam Studies Planning and Discussion</h3>
        <div class="outline-4">
          <h4 id="sec-6">1.3.1 <span class="todo">TODO</span> Injector
            optics: Bogacz</h4>
          <p>Alex has different injector optics to discuss, and believes
            that the
            injector chicane quadrupole change on Monday is perhaps only
            the
            start of needed injector optics changes.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-7">1.3.2 <span class="todo">TODO</span> Injector
            model: Freyberger</h4>
          <p>The injector model is far from design and not correct right
            now,
            complicating comparisons to "design". How do we establish a
            good
            baseline injector model for the present machine
            configuration?
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-8">1.3.3 <span class="todo">TODO</span> Bunch
            length measurement: Hofler/Kazimi</h4>
          <p>Part of our problem is related to anomalous beam profiles
            as far
            back as Inj and arc 1 SLMs. Inj SLM is round, whereas design
            has
            a 1:3 x:y size ratio. Arc 1 SLM has two low energy tails
            that
            rotate with NL gang and individual cavity phases. NL
            individual
            cavity phasing did not improve this profile. This seems to
            suggest
            a bunch length issue.
          </p>
          <p>
            Joe suggested that we calibrate the Hall C slit and close it
            up
            a bit to improve Hall C beam quality. This may tell us
            something
            about upstream timing/bunch length but may also make us more
            sensitive to upstream changes.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-9">1.4 Bunch length team meeting report:
          Kazimi/Hofler</h3>
        <ul>
          <li><span class="done">DONE</span> : Bunch length group
            meeting (Reza, Alicia, Tief)<br>
            Can we make bunch length phase configurations SW config
            files?
            Done, very informally; discussed need for assembling tools.
            Can measure real-time bunch length with running 1-2 deg off
            crest
            in compensating directions in both linacs, assuming we can
            get
            back to that setup with high energy. Will discuss further.
          </li>
        </ul>
      </div>
      <div class="outline-3">
        <h3 id="sec-10">1.5 12GeV Pathlength Requirements Status:
          Tiefenback</h3>
        <div class="outline-4">
          <h4 id="sec-11">1.5.1 <span class="todo">TODO</span> Need
            conclusions document.</h4>
          <p>In process.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-12">1.6 AOB?</h3>
        <p>
======================================================================
        </p>
      </div>
    </div>
    <div class="outline-2">
      <h2 id="sec-13">2 2011-01-26 Wed 14:00 BTeam Meeting Agenda</h2>
      <div class="outline-3">
        <h3 id="sec-14">2.1 Optics-on-Call Report: Yuhong/Tief =>
          Byung/Yves</h3>
        <p>This has been a very eventful week with serious struggles to
          get high
          current operations back to hall C (1) and parity quality beam
          back to
          hall B (5). Injector loss trips at 0R04 have limited us to
          <100uA at
          hall C often, with hour-timescale drifts away whenever
          retuned.
        </p>
        <p>
          What other options are on the table should today fail?
        </p>
        <ul>
          <li>
            Going to higher gun voltage (130 kV), "A long 8 hours" of
            effort
          </li>
          <li>
            Tief: Double up lasers (but only works until A comes on)
          </li>
          <li>
            If beam restore is successful, plan for collimator scan
            (~4h)
            and mini-spin-dance Thursday to prep for weekend
          </li>
        </ul>
      </div>
      <div class="outline-3">
        <h3 id="sec-15">2.2 Beam Studies Report</h3>
        <div class="outline-4">
          <h4 id="sec-16">2.2.1 <span class="done">DONE</span> 5s
            Motion In Injector From Polling: Suleiman/Higgins (~1h)</h4>
          <p><a href="https://cebaf.jlab.org/atlis/task/10739">ATLis
              10739</a>: Done AM Wed 2011-01-26, confirmed polling/vert
            motion
            correlation. Polling left off after study. Was originally
            observed
            about 1y ago. Seems to be someting within controls, as all
            polled
            items are downstream of first observed BPM 5s motion.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-17">2.2.2 <span class="done">DONE</span>? LOCO
            Model Calibration Tests in ARC3: Roblin (~2h) Tue 2011-01-18</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10700">ATLis
              10700</a>: Measured, but BPM problems in center of arc.
            Yves reported last week. Have some analysis upstream and
            downstream
            of affected mux, but should restore good BPM behavior and
            remeasure.
            Being worked on, will not ask for more time until sorted
            out.
            Noisy BPMs were vertical? Tief investigating, noted
            horizontal noise.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-18">2.2.3 <span class="done">DONE</span>?
            RayTrace in ARC3: Bodenstein (~30min) Tue 2011-01-18</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10708">ATLis
              10708</a>: See above, should redo with LOCO model
            remeasurement.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-19">2.2.4 Double peaks in dispersive hall C BPMs:
            Benesch</h4>
          <p><a
              href="http://opweb.acc.jlab.org/CSUEApps/elog/entry/1562549">elog
              entry</a>: The differential (xdiff and ydiff) plots are
            differences between helicity states. Nothing in ydiff. xdiff
            shows
            something in 3C11 and 3C12 but not 3C14. Strange since
            dispersion
            at 3C11=3C14. ypos (position) shows double peaks at 3P03A
            and
            asymmetry at 3P02A. xpos shows the same. xpos DOESN'T show
            anything at 3C12. From a couple weeks ago, will revisit in
            newer
            logs once we get reliable beam back to Hall C.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-20">2.2.5 Bunch length/energy spread measurements:
            Tief</h4>
          <p>Recommends SLM tail investigation to investigate bunching
            process.
            Hall B/2C20 SLM was showing nasty profiles last week, for
            instance.
            Reza is working on the bunch length measurement at present
            Wed 2011-01-26.
          </p>
          <p>
            Should we have to keep running off crest? We shouldn't have
            to.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-21">2.3 Beam Studies Planning</h3>
        <div class="outline-4">
          <h4 id="sec-22">2.3.1 <span class="todo">TODO</span>
            Backphasing Bunch Length Measurement @100kV: Hofler (2-3h)</h4>
          <p><a href="https://cebaf.jlab.org/atlis/task/10684">ATLis
              10684</a>: Should be measured again before we leave 100 kV
            injector voltage. We do not have a working bunchlength
            measurement
            at 100 kV at present. IHA4D00 harp repaired Tue 2011-01-25 (<a
              href="https://cebaf.jlab.org/atlis/task/10703">ATLis 10703</a>)
            so measurement should be feasible. This may be a higher
            priority
            depending on status of injector reconfiguration Wed
            2011-01-26
            if we shift to 130 kV injector setup on Thu 2011-01-27. Yves
            wants
            to be paged along with Alicia for this measurement.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-23">2.3.2 <span class="todo">TODO</span> Return
            to Arc 1/2 New Optics: Arne (~2-4h)</h4>
          <p><a href="https://cebaf.jlab.org/atlis/task/10652">ATLis
              10652</a>: Attempted earlier in January. Want to put this
            in and
            leave it in after a clean ORFP.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-24">2.3.3 <span class="todo">TODO</span>
            Determine multiharp masking requirements in tune/CW: Benesch</h4>
          <p><a href="https://cebaf.jlab.org/atlis/task/10647">ATLis
              10647</a>: New ATLis, not scheduled yet. Mainly hall C.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-25">2.3.4 <span class="todo">TODO</span> Test
            Hall C Energy Measurement Tool: Keesee/Wang (~1.5h)</h4>
          <p><a href="https://cebaf.jlab.org/atlis/task/7493">ATLis 7493</a>:
            Old ATLis for new Hall C energy measurement tool. Some
            work needed on analysis. Should be done before 6mo SAD.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-26">2.3.5 <span class="todo">TODO</span> Hall B
            PSS BCM Calibration: Mahoney</h4>
          <p><a href="https://cebaf.jlab.org/atlis/task/10533">ATLis
              10533</a>: Needs up to 500 nA CW to Hall B. Deferred due
            to
            present Hall B current limit.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-27">2.4 Bunch length team meeting report:
          Kazimi/Hofler</h3>
        <ul>
          <li><span class="done">DONE</span> : Bunch length group
            meeting (Reza, Alicia, Tief)<br>
            Is this necessary after 2011-01-26 injector reconfiguration?
            Can we make bunch length phase configurations SW config
            files?
            Done, very informally; discussed need for assembling tools.
            Can measure real-time bunch length with running 1-2 deg off
            crest
            in compensating directions in both linacs, assuming we can
            get
            back to that setup with high energy. Will discuss further.
          </li>
        </ul>
      </div>
      <div class="outline-3">
        <h3 id="sec-28">2.5 12GeV Pathlength Requirements Status:
          Tiefenback</h3>
        <div class="outline-4">
          <h4 id="sec-29">2.5.1 <span class="todo">TODO</span> Need
            conclusions document.</h4>
          <p>In process.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-30">2.6 AOB?</h3>
        <div class="outline-4">
          <h4 id="sec-31">2.6.1 <span class="todo">TODO</span>: Qweak
            injector voltage 100 kV ok? Or do we move to 130 kV?</h4>
          <p>Note that we also need good parity quality with high
            current.
          </p>
        </div>
      </div>
    </div>
    <div id="postamble">
      <p class="author"> Author: Todd Satogata
        <a href="mailto:satogata@Todd-Satogatas-MacBook-Pro.local"><satogata@Todd-Satogatas-MacBook-Pro.local></a>
      </p>
      <p class="date"> Date: 2011/02/02 13:03:45</p>
    </div>
  </body>
</html>