<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
  </head>
  <body>
    <title>BTeam-2011-02-16</title>
    <meta http-equiv="Content-Type" content="text/html;
      charset=ISO-8859-1">
    <meta name="generator" content="Org-mode">
    <meta name="generated" content="2011/02/16 10:24:41">
    <meta name="author" content="Todd Satogata">
    <style type="text/css">
  html {
        font-family: Times, serif;
        font-size: 12pt;
  }
  .title { text-align: center; }
  .todo  { color: red; }
  .done { color: green; }
  .timestamp { color: grey }
  .timestamp-kwd { color: CadetBlue }
  .tag { background-color:lightblue; font-weight:normal }
  .target { background-color: lavender; }
  pre {
        border: 1pt solid #AEBDCC;
        background-color: #F3F5F7;
        padding: 5pt;
        font-family: courier, monospace;
  }
  table { border-collapse: collapse; }
  td, th {
        vertical-align: top;
        <!--border: 1pt solid #ADB9CC;-->
  }
</style>BTeam --<br>
    <br>
    Here are the notes from last week and the moderately long agenda for
    this week. As usual, please bring your ideas and priorities to the
    meeting this afternoon, and/or send them to me, and we'll develop
    our plans for BTeam for the remainder of this run. See you there,
    and thanks!<br>
    <br>
    -Todd<br>
    <h1 class="title">BTeam-2011-02-16</h1>
    <div class="outline-2">
      <h2 id="sec-1">1 2011-02-16 Wed 14:00 BTeam Meeting Agenda</h2>
      <div class="outline-3">
        <h3 id="sec-2">1.1 Optics-on-Call Report: Shahid/Geoff =>
          Todd/Jay</h3>
        <p>At last at least a moderately quiet week, though with some
          position
          parity issues to be worked out for Hall C/Qweak. This included
          an
          investigation of injector match through the injector chicane
          into
          NL, which seems to still be questionable.
        </p>
        <div class="outline-4">
          <h4 id="sec-3">1.1.1 <span class="done">DONE</span> Check
            quad ranges/procedure for injector match multiharp</h4>
          <p>Arne questioned last week: Does multiharp have good quad
            ranges
            for match? Need to collect multiharp data and return to
            injector
            match procedure. This includes getting hardware for harps
            back in
            working order. RonL notes that harp repair wants an injector
            access. This was checked and adjusted during below Tue
            2011-02-15
            studies by Jay.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-4">1.1.2 <span class="done">DONE</span> Check
            injector skew quad scaling and setup</h4>
          <p>Yves noted last week that we should check skew quads,
            particularly
            whether they were scaled properly for 6.3 MeV and lemi work.
            This
            was likely done as part of check and measurement to 100 keV
            during
            2011-02-15 Tue beam studies by Yves.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-5">1.2 Beam Studies Report</h3>
        <div class="outline-4">
          <h4 id="sec-6">1.2.1 <span class="done">DONE</span>
            Multiharp, injector optics match into NL: Jay</h4>
          <p>Data and attempt at rematch acquired 2011-02-15 Tue, but
            rematch
            seemed to make conditions worse.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-7">1.2.2 <span class="done">DONE</span> Measure
            injector transport across capture, 1/4: Yves</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/9622">ATLis 9622</a>:
            Some data acquired 2011-02-15 Tue. Do we need more
            data for the downstream section of the injector?
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-8">1.2.3 New injector optics review: Alex</h4>
          <p>Alex will briefly review the high points (including
            dispersion
            through the chicane, and modified optics for diagnostics) of
            the
            injector optics installed 2011-02-03 Thu.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-9">1.2.4 <span class="done">DONE</span> Injector
            model: Arne</h4>
          <p>Elegant baseline should now match machine settings. Jay:
            Are
            these values consistent with those used by matchElengant?
          </p>
          <ul>
            <li><span class="todo">TODO</span> Check consistency. If
              not, make consistent and achieve consensus.<br>
            </li>
          </ul>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-10">1.3 APEL Hall Liason Comments</h3>
      </div>
      <div class="outline-3">
        <h3 id="sec-11">1.4 Beam Studies Planning and Discussion</h3>
        <div class="outline-4">
          <h4 id="sec-12">1.4.1 <span class="todo">TODO</span>
            Raytrace/Multiharp in HallC/Qweak: Jay/Ryan/MikeT</h4>
          <p>Investigate optics/transport of response to modulation
            coils at
            3C08/10 and FFB coils at 3C04/06/07. Requires beam to hall C
            and may disrupt beam to other halls depending on where the
            the measurement is launched.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-13">1.4.2 <span class="todo">TODO</span> Bunch
            length measurement: Alicia/Reza</h4>
          <p>Need to check harp status before measurement. Both 130 kV
            normal
            and backphase bunch length measurements should be performed
            before 6 month SAD. 4D00 spectrometer PS was reinstalled
            2011-02-10 Thu.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-14">1.4.3 <span class="todo">TODO</span> Parity
            quality improvements from injector coupling: Yves</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/8346">ATLis 8346</a>:
            Some concern that parity quality is marginal for
            Qweak. A measurement and retune, such as this ATLis from
            Yves, is
            fairly invasive. Can be checked in ~10min with 30Hz PZT;
            this is
            a backup plan in case PZT/other injector measurements are
            inconclusive.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-15">1.4.4 <span class="todo">TODO</span> LOCO
            Model Calibration Tests: Yves/Ryan/MikeT (~2h)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10700">ATLis
              10700</a>: Measured, but BPM problems in center of arc.
            Have
            some analysis upstream and downstream of affected mux, but
            should
            restore good BPM behavior and remeasure. Being worked on,
            will
            not ask for more time until sorted out. Noisy BPMs were
            vertical?
            Tief investigating, noted horizontal noise.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-16">1.4.5 <span class="todo">TODO</span> RayTrace
            in ARC3: Ryan/MikeT (~30min)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10708">ATLis
              10708</a>: See above, should redo with LOCO model
            remeasurement.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-17">1.5 AOB?</h3>
        <div class="outline-4">
          <h4 id="sec-18">1.5.1 <span class="todo">TODO</span> Injector
            configuration documentation: Reza</h4>
          <p>Document proper operational injector configuration (6.3 MeV
            energy,
            crested within 5 degrees, etc): Reza et al
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-19">1.5.2 <span class="todo">TODO</span> Plan
            1-pass A/C split, B offline (probably) for Feb 25 (Yves/Jay)</h4>
          <p>What resources/beam time do we need to be prepared?
          </p>
          <p>
======================================================================
          </p>
        </div>
      </div>
    </div>
    <div class="outline-2">
      <h2 id="sec-20">2 2011-02-09 Wed 14:00 BTeam Meeting Agenda</h2>
      <div class="outline-3">
        <h3 id="sec-21">2.1 Optics-on-Call Report: Balsa/Alex =>
          Shahid/Geoff</h3>
        <p>Yet another eventful week with a lot of operations diagnosis
          concentrating on the injector. On Friday we fixed the recent
          machine
          woes with a reduction of GSET on the 0L03-2 cavity in the
          injector
          to reduce fluttering PASKR (phase loop effort RMS). We have
          since
          been able to return to stable running conditions for Halls
          B/C, and
          with the addition of Hall A this week, we should be able to
          return
          to beam studies that do not involve immediate firefighting to
          keep
          the operational program on track.
        </p>
        <p>
          Alex: Thursday optics was particularly productive (see below).
          2h into optics work, spots improved/reproduced. Also modified
          model
          for existing 6.3 MeV injector rather than old 5 MeV, and Jay
          prepped
          new GSETs for cavities to include end-field effects. Geoff: Do
          we
          have good procedures? Alex believes we're in good shape there.
        </p>
        <div class="outline-4">
          <h4 id="sec-22">2.1.1 <span class="todo">TODO</span> Arne:
            Does multiharp have good quad ranges for match? Need to</h4>
          <p>collect multiharp data and return to injector match
            procedure.
            This includes getting hardware for harps back in working
            order.
            RonL notes that harp repair wants an injector access.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-23">2.1.2 <span class="todo">TODO</span> Yves:
            notes that we should check skew quads, particularly</h4>
          <p>whether they were scaled properly for 6.3 MeV and lemi
            work.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-24">2.2 Beam Studies Report</h3>
        <div class="outline-4">
          <h4 id="sec-25">2.2.1 <span class="done">DONE</span> Injector
            optics: Bogacz</h4>
          <p>Alex implemented a different injector optics last week,
            which
            also improved injector performance and reduced some trips in
            the middle of the injector chicane where beam sizes had
            previously
            been high. These optics should now be much closer to the
            design
            optics, as we also put these optics into the elegant design
            baseline.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-26">2.2.2 <span class="done">DONE</span> Injector
            model: Freyberger</h4>
          <p>See above: elegant baseline should now match machine
            settings.
            Jay: Are these values consistent with those used by
            matchElengant?
          </p>
          <ul>
            <li><span class="todo">TODO</span> Check consistency. If
              not, achieve consensus.<br>
            </li>
          </ul>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-27">2.3 Beam Studies Planning and Discussion</h3>
        <div class="outline-4">
          <h4 id="sec-28">2.3.1 <span class="todo">TODO</span> Bunch
            length measurement: Hofler/Kazimi</h4>
          <p>Lack of reliable bunch length measurements seemed to be a
            challenge
            during the diagnosis of the 0L03-2 problem. The most recent
            measurements did not seem correct. Perhaps we should make
            sure that this measurement is now reliable and understood.
            There is still a beam tail on the 1A SLM but there is no
            strong drive to change the injector or try to fix this based
            on experiment feedback and Compton/halo backgrounds.
          </p>
          <p>
            Do we expect bunch length measurement to work at 130 kV?
            Reza
            says yes, but this requires desk time and some operations
            time.
            This is a priority to get working before the 6 month SAD
            since
            we also return with the gun at 130kV. Temperature
            stabilization
            may also have helped stabilize this effort, but picture and
            procedure – it was the beam and stability that were bad.
          </p>
          <p>
            Backphase bunch length measurement at 130kV is also a
            priority
            before the 6 month SAD. We have not yet checked the harps
            necessary for this measurement, should check those at first
            opportunity. This at 4D00, requires spectrometer PS back in,
            which should be done 2011-02-10 Thu AM along with change
            back
            to longitudinal polarization for Qweak.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-29">2.3.2 <span class="todo">TODO</span> ? Parity
            quality improvements from injector coupling: Roblin</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/8346">ATLis 8346</a>:
            Some concern that parity quality is marginal for
            Qweak. We should check that the injector skew correctors
            were
            scaled properly for the gun HV/energy changes during our
            optics
            fixes on 2011-02-03, and, if not, perhaps scaling them will
            improve Qweak parity quality with little impact. A
            measurement
            and retune, such as this ATLis from Yves, is fairly
            invasive.
            Can be checked in ~10min with 30Hz PZT, should still work.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-30">2.3.3 <span class="todo">TODO</span> ? LOCO
            Model Calibration Tests: Roblin (~2h)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10700">ATLis
              10700</a>: Measured, but BPM problems in center of arc.
            Yves reported last week. Have some analysis upstream and
            downstream
            of affected mux, but should restore good BPM behavior and
            remeasure.
            Being worked on, will not ask for more time until sorted
            out.
            Noisy BPMs were vertical? Tief investigating, noted
            horizontal noise.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-31">2.3.4 <span class="todo">TODO</span> ?
            RayTrace in ARC3: Bodenstein (~30min)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10708">ATLis
              10708</a>: See above, should redo with LOCO model
            remeasurement.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-32">2.4 AOB?</h3>
        <div class="outline-4">
          <h4 id="sec-33">2.4.1 <span class="todo">TODO</span>:
            Document proper operational injector configuration (6.3 MeV</h4>
          <p>energy, crested within 5 degrees, etc): Reza et al
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-34">2.4.2 Jay: C Compton scintillator adjacent to
            beamline noise spikes,</h4>
          <p>per elog entry. 100s intervals, per elog entry last night.
            Compton photon detector also modified, so comparisons to
            previous
            expectations difficult. Hall C will perform access to switch
            back to old detector electronics.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-35">2.4.3 <span class="todo">TODO</span> Add hall
            liason reports to BTeam agenda (Todd)</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-36">2.4.4 <span class="todo">TODO</span> Add
            MikeS to list (BSY/Recombiner measurements) (Todd)</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-37">2.4.5 <span class="todo">TODO</span> Plan
            1-pass A/C split, B offline (probably) for Feb 25 (Yves/Jay)</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-38">2.4.6 Update on path length (Tief): annual
            thermal cycle, machine bigger</h4>
          <p>in summer, smaller in winter, so doglegs take up slack more
            in
            winter than summer. 12 GeV heat loading will dominate arcs,
            about
            half of total machine length. Concrete has dirt/water
            outside,
            and will have heating resistors on walls. Calculations for
            1C temp
            change is about 3.5 degrees of RF phase. (3.5deg/C)
            Surrogate meas
            was to raise water temperature, saw about 2F~1C temp rise at
            surface
            of concrete; pathlength changed about 6deg cumulative around
            machine.
            After dogleg compensation, they got a number closer to
            5.5deg, all
            from east arc (minus arc 9), or about 1.5deg/C/arc. This
            about half
            of what one would expect from the naive/simple thermal
            argument.
            Questions about whether we saturated the temperature rise;
            also
            only did half the planned temp rise because of caution about
            hoses.
            Measurement was same order of magnitude, hence concrete
            heating
            contribution to pathlength is a plausible mechanism.
            Observation
            of pathlength change is also consistent with similar
            pathlength
            change in all east arcs.
          </p>
          <p>
            Multiyear pathlength drift drives possible need for
            additional
            pathlength compensation. We've exhausted previous
            capabilities,
            which is why we need to take up slack now in arc orbit
            pathlength
            changes.
          </p>
          <p>
            Consensus seems to be that we should increase dogleg
            capability
            by momentum change for 12 GeV plus taking up arc slack –
            nearly.
            The open question is whether the upper bound of the cooling
            water
            heating test is the additional dogleg capability that is
            needed.
          </p>
        </div>
      </div>
    </div>
    <div id="postamble">
      <p class="author"> Author: Todd Satogata
        <a href="mailto:satogata@Todd-Satogatas-MacBook-Pro.local"><satogata@Todd-Satogatas-MacBook-Pro.local></a>
      </p>
      <p class="date"> Date: 2011/02/16 10:24:41</p>
    </div>
  </body>
</html>