<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
  </head>
  <body>
    <title>BTeam-2011-02-23</title>
    <meta http-equiv="Content-Type" content="text/html;
      charset=ISO-8859-1">
    <meta name="generator" content="Org-mode">
    <meta name="generated" content="2011/02/22 18:54:30">
    <meta name="author" content="Todd Satogata">
    <style type="text/css">
  html {
        font-family: Times, serif;
        font-size: 12pt;
  }
  .title { text-align: center; }
  .todo  { color: red; }
  .done { color: green; }
  .timestamp { color: grey }
  .timestamp-kwd { color: CadetBlue }
  .tag { background-color:lightblue; font-weight:normal }
  .target { background-color: lavender; }
  pre {
        border: 1pt solid #AEBDCC;
        background-color: #F3F5F7;
        padding: 5pt;
        font-family: courier, monospace;
  }
  table { border-collapse: collapse; }
  td, th {
        vertical-align: top;
        <!--border: 1pt solid #ADB9CC;-->
  }
</style>BTeam --<br>
    <br>
    Here are the agenda and notes for this week's BTeam meeting. I'll
    keep a countdown until the 6 month SAD at the start of the meeting,
    as we're a little over 10 weeks away and we have quite a few beam
    studies that should be completed before then. Please nag me to put
    your ATlis items on the list if they need to be done before then and
    you do not see them here. I think we have a good plan here for
    Thursday and we should make a good plan for Tuesday so we can defend
    that time. Bring all your good ideas to the meeting, as always --
    cheers!<br>
    <br>
    -Todd<br>
    <br>
    <h1 class="title">BTeam-2011-02-23</h1>
    <div class="outline-2">
      <h2 id="sec-1">1 11.5 weeks remaining before 6-month SAD (run ends
        0800 Fri May 13)</h2>
    </div>
    <div class="outline-2">
      <h2 id="sec-2">2 2011-02-16 Wed 14:00 BTeam Meeting Agenda</h2>
      <div class="outline-3">
        <h3 id="sec-3">2.1 Optics-on-Call Report: Todd/Jay =>
          Alicia/Reza</h3>
        <p>A fairly quiet week for optics on call, dominated by charge
          asymmetry widths, helicity-correlated position differences,
          and
          other HC parity quality issues. Several of these have been or
          are addressed in beam studies below. Those that are not
          include
          dispersion leakage after last HC quad (so horizontal
          correction
          is perhaps needed in 0R/1A/3C, vertical in 1S/2S/2T), and IHWP
          helicity-correlated position difference issues that likely
          require
          UVa time on the laser table.
        </p>
      </div>
      <div class="outline-3">
        <h3 id="sec-4">2.2 Beam Studies Report</h3>
        <div class="outline-4">
          <h4 id="sec-5">2.2.1 <span class="done">DONE</span> Parity
            quality from injector coupling: Yves 2011-02-15 Tue</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/8346">ATLis 8346</a>:
            Yves has measurements that predict some skew corrections
            based on a converging 1/4 cryo skew map fit. The 1/4 cryo –
            not
            capture – seems to dominate coupling.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-6">2.2.2 <span class="done">DONE</span>
            BSY/Recombiner measurements: MikeS (~4h) 2011-02-17 Thu PM</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10810">ATLis
              10810</a>: Multipole measurements in the 6T beamline.
            Found new
            quad centers for 6T beamline, minimized corector strengths
            and
            used MAU6T04 shunt to set beam at Lambertson. First runs in
            both
            (x,x'), (y,y'). Data in support of Mike's thesis work. Want
            to
            follow up and repeat some measurements before HA comes out
            of
            third pass (see below). See <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1568898">e1568898</a>.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-7">2.2.3 <span class="done">DONE</span> Minimum
            beam size possible : Arne (~5h) 2011-02-18 Fri PM</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10825">ATLis
              10825</a>: HPS experiment requires small beam size at
            target;
            how much size comes from beam motion at harps? Required
            2-pass
            beam to HB tagger harp. Demonstrated <30um beam size
            required
            for beam test. See <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1569137">e1569137</a>.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-8">2.2.4 <span class="done">DONE</span> Lower
            charge asymmetry widths for Qweak: Riad 2011-02-22 PM</h4>
          <p>New diagnostics from Qweak, asymmetry lowered from 900+ ppm
            to
            450-500 ppm. See <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1569770">e1569770</a>.
            Later work from Reza improved this
            at 0I05 to 260-270 ppm; see <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1569903">e1569903</a>.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-9">2.3 Beam Studies Planning: Thursday</h3>
        <div class="outline-4">
          <h4 id="sec-10">2.3.1 <span class="todo">TODO</span>
            BSY/Recombiner measurements: MikeS (~2h invasive) 2011-02-24
            Thu</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10810">ATLis
              10810</a>: Multipole measurements in the 6T beamline.
            Complete
            measurements in 6T beamline before HA comes out of third
            pass.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-11">2.3.2 <span class="todo">TODO</span> PZT
            Measurement to HC: Jay/Arne/Yves (1h invasive) 2011-02-24
            Thu</h4>
          <p>Motivated by desire to improve helicity-correlated position
            differences for Qweak. May include coupling corrections from
            Yves for 1/4 cryo coupling if they are ready.<br>
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-12">2.3.3 <span class="todo">TODO</span> HC
            Rematch using 3C05 Harp: Jay (1h HC) 2011-02-24 Thu</h4>
          <p>Motivated by unusual beam size at Compton, a compromise
            position
            for weekend improvements since no significant injector
            optics
            retune is planned before next week.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-13">2.4 Other Beam Studies Planning</h3>
        <div class="outline-4">
          <h4 id="sec-14">2.4.1 <span class="todo">TODO</span>
            Raytrace/Multiharp for Qweak: Jay/Ryan/MikeT (3h
            HC/invasive?)</h4>
          <p>Investigate optics/transport of response to modulation
            coils at
            3C08/10 and FFB coils at 3C04/06/07. May disrupt beam to
            other halls
            depending on where the the measurement is launched.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-15">2.4.2 <span class="todo">TODO</span> LOCO
            Model Calibration Tests: Yves/Ryan/MikeT (~2h invasive)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10700">ATLis
              10700</a>: Measured, but BPM problems in center of arc.
            Have
            some analysis upstream and downstream of affected mux, but
            should
            restore good BPM behavior and remeasure. Being worked on,
            will
            not ask for more time until sorted out. Noisy BPMs were
            vertical?
            Tief investigating, noted horizontal noise. <a
              href="http://cebaf.jlab.org/atlis/task/10746">ATLis 10746</a>
            is in place
            to investigate these BPMs when there is no beam in the east
            arc.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-16">2.4.3 <span class="todo">TODO</span> RayTrace
            in ARC3: Ryan/MikeT (~30min)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10708">ATLis
              10708</a>: See above, should redo with LOCO model
            remeasurement.
            RayTrace analysis also needs to close loop on optics
            correction.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-17">2.4.4 <span class="todo">TODO</span> Injector
            bunch length measurements: Alicia/Reza (invasive inj)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10684">ATLis
              10684</a>: Need to check harp status before measurement.
            Both
            130 kV normal and backphase bunch length measurements should
            be
            performed and procedures checked before 6 month SAD.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-18">2.4.5 <span class="todo">TODO</span> Injector
            transmission vs current: MattP (2-4h) (invasive inj)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10838">ATLis
              10838</a>: Desired before 6 month SAD. Probably workable
            behind
            arc or linac maintenance/repair, when halls are down, or
            behind
            a(nother) CHL trip.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-19">2.4.6 ???? IHWP helicity-correlated position
            differences? (invasive inj)</h4>
          <p>UVa time on laser table to investigate IHWP issues for
            Qweak.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-20">2.5 APEL Hall Liason Comments</h3>
        <div class="outline-4">
          <h4 id="sec-21">2.5.1 Hall A: Yves</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-22">2.5.2 Hall B: Tief</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-23">2.5.3 Hall C: Jay</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-24">2.6 AOB?</h3>
        <div class="outline-4">
          <h4 id="sec-25">2.6.1 <span class="todo">TODO</span> Plan
            1-pass A/C split, B offline for 2011-02-25 Fri (Jay/Yves)</h4>
          <p>What resources/beam time do we need to be prepared?
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-26">2.6.2 <span class="todo">TODO</span> Injector
            configuration documentation: Reza</h4>
          <p>Document proper operational injector configuration (6.3 MeV
            energy,
            crested within 5 degrees, etc): Reza et al
          </p>
          <p>
======================================================================
          </p>
        </div>
      </div>
    </div>
    <div class="outline-2">
      <h2 id="sec-27">3 2011-02-16 Wed 14:00 BTeam Meeting Agenda</h2>
      <div class="outline-3">
        <h3 id="sec-28">3.1 Optics-on-Call Report: Shahid/Geoff =>
          Todd/Jay</h3>
        <p>At last at least a moderately quiet week, though with some
          position
          parity issues to be worked out for Hall C/Qweak. This included
          an
          investigation of injector match through the injector chicane
          into
          NL, which seems to still be questionable.
          Also assisted separator work on Fri 2011-02-11.
          Majority of separator/injector match work was motivated by
          Hall C
          Compton backgrounds. Final resolution was to move to crest in
          in injector/NL/SL by retuning injector on Fri 2011-02-11.
          Hall C reports that Compton rates were good after Fri but were
          not
          very stable over time. Spot move improved this, consistent
          with
          previous hypothesis/sensitivity when QE degrades. At what
          point
          in QE does this become problematic? Should we change our
          criteria
          for a spot move?
        </p>
        <div class="outline-4">
          <h4 id="sec-29">3.1.1 <span class="done">DONE</span> Check
            quad ranges/procedure for injector match multiharp</h4>
          <p>Arne questioned last week: Does multiharp have good quad
            ranges
            for match? Need to collect multiharp data and return to
            injector
            match procedure. This includes getting hardware for harps
            back in
            working order. RonL notes that harp repair wants an injector
            access. This was checked and adjusted during below Tue
            2011-02-15
            studies by Jay.
            After rematch, beam bigger in H in Hall B, but results
            really
            inconclusive – product of beta*emit same before/after match.
            Spots looked equally good before/after on viewers. Current
            settings
            should be close to design at present. Files are good in
            0L03/08
            in terms of quad ranges for multiharp scans.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-30">3.1.2 <span class="done">DONE</span> Check
            injector skew quad scaling and setup</h4>
          <p>Yves noted last week that we should check skew quads,
            particularly
            whether they were scaled properly for 6.3 MeV and lemi work.
            This
            was likely done as part of check and measurement to 100 keV
            during
            2011-02-15 Tue beam studies by Yves. These are several fopt
            runs
            to 100 keV, NOT PZT measurements as listed below. Data
            remains to
            be analyzed to get matrices and correct with skews.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-31">3.2 Beam Studies Report</h3>
        <div class="outline-4">
          <h4 id="sec-32">3.2.1 <span class="done">DONE</span>
            Multiharp, injector optics match into NL: Jay</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10556">ATLis
              10556</a>: Some data acquired 2011-02-15 Tue. Do we need
            more
            Data and attempt at rematch acquired 2011-02-15 Tue, but
            rematch
            seemed to not make conditions worse or better. (see above)
            Hall C
            reports that charge asymmetry did seem to be worse with
            "matched"
            settings.
          </p>
          <ul>
            <li><span class="todo">TODO</span> Reevaluate match
              procedures during, e.g., summer SAD.<br>
            </li>
          </ul>
        </div>
        <div class="outline-4">
          <h4 id="sec-33">3.2.2 <span class="done">DONE</span> Measure
            injector transport across capture, 1/4: Yves</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/9622">ATLis 9622</a>:
            Some data acquired 2011-02-15 Tue. Do we need more
            data for the downstream section of the injector? (almost
            certainly)
            Reza: Steering done on A2 after HWien on/off during this
            study. Why?
            Clyde: Comment about ~400Hz IF amplitude
            instability/modulation.
            Warm/cold may react differently because of analog/digital
            differences.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-34">3.2.3 New injector optics review: Alex</h4>
          <p>Alex will briefly review the high points (including
            dispersion
            through the chicane, and modified optics for diagnostics) of
            the
            injector optics installed 2011-02-03 Thu.
            Alex presented optics that produce 1.5m or 3m of dispersion
            at the
            injector SLM, but at the cost of losing match so this is not
            an
            online diagnostic. Much discussion about what would be
            required to
            have this online, including zigzag chicane (ha). Geoff notes
            that
            Kevin Jordan had a transition foil at a high dispersion
            point, but
            there were historically problems with that as well. Could
            also
            throw away isochronous condition in match into NL, possibly
            gaining
            another handle on bunch length in the process.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-35">3.2.4 <span class="done">DONE</span> Injector
            model: Arne</h4>
          <p>Elegant baseline should now match machine settings. Jay:
            Are
            these values consistent with those used by matchElengant?
            Are
            there new optics in the arcs that we should investigate?
          </p>
          <ul>
            <li><span class="todo">TODO</span> Check consistency. If
              not, make consistent and achieve consensus.<br>
              Model is consistent with Alex's setup, match points are
              consistent
              now too. Have noticed some very strong sensitivities to
              some quad
              settings in the model for this setup though: robustness?
              We should
              evaluate how sensitive these optics are and communicate
              sensitivity.
              Tief recalls that match from injector to injector chicane
              has a
              small waist, a signature of sensitivity to upstream
              errors.
              Geoff questions the 6.3 MeV setting; Reza notes this is
              based on
              GSETs and not a spectrometer measurement. Yet. Some
              concern about
              the changed quad settings and their impact on the
              consistency of
              this setup. Yves's data should help resolve this
              optics/scaling.
              Should perhaps measure again at 2-5% level; much
              discussion.
              Have to do this for 5 MeV Mott measurements anyway
              (Matt/Joe/Riad).
            </li>
          </ul>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-36">3.3 APEL Hall Liason Comments</h3>
        <p>Deferred to next week.
        </p>
      </div>
      <div class="outline-3">
        <h3 id="sec-37">3.4 Beam Studies Planning and Discussion</h3>
        <div class="outline-4">
          <h4 id="sec-38">3.4.1 <span class="todo">TODO</span>
            BSY/Recombiner measurements: MikeS (4h) 2011-02-17 Thu</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10810">ATLis
              10810</a>: Multipole measurements in the 6T beamline.
            Air-core
            correctors were checked out 01-22-2011 Sat. Data in support
            of
            Mike's thesis work. Third pass beam, invasive. Part is
            setting
            up beamline (setup, rechecking quad centers, first set of
            cal
            checks, first measurement to chew on offline, backout). Want
            to
            follow up and repeat some measurements before Hall A comes
            out
            of third pass.
          </p>
          <p>
            Clyde notes that capture is starting to fail and might need
            some
            maintenance tomorrow. Has been showing degredation ~4d. 1h
            to
            replace, then rephase etc. Total 3-4h of planned time.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-39">3.4.2 <span class="todo">TODO</span> Minimum
            beam size possible : Arne (~4h) 2011-02-18 Fri AM</h4>
          <p>ATLis ?: Second pass hall B. Hall B wants torus flip during
            day as well, being up at 2nd pass between 0800-1200.
            Parasitic
            to other halls.
          </p>
          <p>
            Beam unlikely in HallC 2011-02-17 Thu AM or for several days
            due
            to vacuum failure. May try to fit in RayTrace before repair
            if
            feasible.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-40">3.4.3 <span class="todo">TODO</span>
            Raytrace/Multiharp in HallC/Qweak: Jay/Ryan/MikeT (3h?)</h4>
          <p>Investigate optics/transport of response to modulation
            coils at
            3C08/10 and FFB coils at 3C04/06/07. Requires beam to hall C
            and may disrupt beam to other halls depending on where the
            the measurement is launched.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-41">3.4.4 <span class="todo">TODO</span> Bunch
            length measurement: Alicia/Reza</h4>
          <p>Need to check harp status before measurement. Both 130 kV
            normal
            and backphase bunch length measurements should be performed
            before 6 month SAD. 4D00 spectrometer PS was reinstalled
            2011-02-10 Thu.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-42">3.4.5 <span class="todo">TODO</span> Parity
            quality improvements from injector coupling: Yves</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/8346">ATLis 8346</a>:
            Some concern that parity quality is marginal for
            Qweak. A measurement and retune, such as this ATLis from
            Yves, is
            fairly invasive. Can be checked in ~10min with 30Hz PZT;
            this is
            a backup plan in case PZT/other injector measurements are
            inconclusive.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-43">3.4.6 <span class="todo">TODO</span> LOCO
            Model Calibration Tests: Yves/Ryan/MikeT (~2h)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10700">ATLis
              10700</a>: Measured, but BPM problems in center of arc.
            Have
            some analysis upstream and downstream of affected mux, but
            should
            restore good BPM behavior and remeasure. Being worked on,
            will
            not ask for more time until sorted out. Noisy BPMs were
            vertical?
            Tief investigating, noted horizontal noise.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-44">3.4.7 <span class="todo">TODO</span> RayTrace
            in ARC3: Ryan/MikeT (~30min)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10708">ATLis
              10708</a>: See above, should redo with LOCO model
            remeasurement.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-45">3.5 AOB?</h3>
        <div class="outline-4">
          <h4 id="sec-46">3.5.1 <span class="todo">TODO</span> Injector
            configuration documentation: Reza</h4>
          <p>Document proper operational injector configuration (6.3 MeV
            energy,
            crested within 5 degrees, etc): Reza et al
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-47">3.5.2 <span class="todo">TODO</span> Plan
            1-pass A/C split, B offline (probably) for Feb 25 (Yves/Jay)</h4>
          <p>What resources/beam time do we need to be prepared?
          </p>
        </div>
      </div>
    </div>
    <div id="postamble">
      <p class="author"> Author: Todd Satogata
        <a href="mailto:satogata@Todd-Satogatas-MacBook-Pro.local"><satogata@Todd-Satogatas-MacBook-Pro.local></a>
      </p>
      <p class="date"> Date: 2011/02/22 18:54:30</p>
    </div>
  </body>
</html>