<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
<head>
<meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
</head>
<body>
<title>BTeam-2011-03-02</title>
<meta http-equiv="Content-Type" content="text/html;
charset=ISO-8859-1">
<meta name="generator" content="Org-mode">
<meta name="generated" content="2011/03/07 11:20:58">
<meta name="author" content="Todd Satogata">
<style type="text/css">
html {
font-family: Times, serif;
font-size: 12pt;
}
.title { text-align: center; }
.todo { color: red; }
.done { color: green; }
.timestamp { color: grey }
.timestamp-kwd { color: CadetBlue }
.tag { background-color:lightblue; font-weight:normal }
.target { background-color: lavender; }
pre {
border: 1pt solid #AEBDCC;
background-color: #F3F5F7;
padding: 5pt;
font-family: courier, monospace;
}
table { border-collapse: collapse; }
td, th {
vertical-align: top;
<!--border: 1pt solid #ADB9CC;-->
}
</style>BTeam -<br>
<br>
Here are notes from last Wednesday's BTeam meeting, partly to
facilitate discussion and input for the priorities request I sent
out earlier today. In the future I'll be sending separate mails of
the meeting notes and meeting agendas so we can share comment/input
on the previous week's notes that make it into the next week's
agenda.<br>
<br>
-Todd<br>
<h1 class="title">BTeam 2011-03-02</h1>
<div class="outline-2">
<h2 id="sec-2">2 2011-03-02 Wed 14:00 BTeam Meeting Notes</h2>
<div class="outline-3">
<h3 id="sec-3">2.1 Optics-on-Call Report: Alicia/Reza =>
Rui/Mike</h3>
<p>Tons of failures and recovery efforts made this a rather
exciting and frustrating week. Qweak has been down since
Friday with a QTor problem, but has known parity quality
issues that were discussed in a 2011-02-28 Mon 15:00 meeting.
Hall A has bean quality issues as well, in the sense that
their beam size is too large.
</p>
<p>
The A/C split scheduled for Friday was attempted day
2011-02-26
Sat but failed due to regulation problems with, e.g.,
MAX4T05/MAX4S02. We continue to try to address hall issues in
beam studies and take advantage of "free" beam availability,
but
were sometimes hampered by equipment failures.
</p>
</div>
<div class="outline-3">
<h3 id="sec-4">2.2 Beam Studies Report</h3>
<div class="outline-4">
<h4 id="sec-5">2.2.1 BSY/Recombiner measurements: MikeS (~4h)
2011-02-24 Thu PM</h4>
<p><a href="http://cebaf.jlab.org/atlis/task/10810">ATLis
10810</a>: Multipole measurements in the 6T beamline.
Nearly
finished up, but will need a little more time for lambertson
and calibration data. See <a
href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1571680">e1571680</a>.
</p>
<ul>
<li><span class="todo">TODO</span> Final measurements (~4h?)
for Lambertson, calibrations (MikeS)<br>
</li>
</ul>
</div>
<div class="outline-4">
<h4 id="sec-6">2.2.2 PZT Resurrection: Arne/Yves 2011-02-24
Thu AM</h4>
<p><a href="http://cebaf.jlab.org/atlis/task/10864">ATLis
10864</a>: Arne and Yves tried using PZT but only got good
results
with corrector kicks. See <a
href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1570339">e1570339</a>.
Matt Poelker later showed that
PZT itself works, see <a
href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1572018">e1572018</a>;
is there a problem with PZT Booster
software signals, or translation of those signals to
hardware? Can
this be investigated parasitically? In the meantime
decoupling work
was done with DC kicks.
</p>
<p>
Injector Fopt data is peculiar. Suspect that an injector
Fopt kicker
is rotated to produce coupling in the injector Fopt signal.
No OPS-PR
generated yet, but Yves and/or Jay will generate one for
followup.
</p>
<ul>
<li><span class="todo">TODO</span> Check parity quality with
new decoupling when Hall C returns<br>
</li>
<li><span class="todo">TODO</span> Generate OPS-PR for
suspect rotated injector Fopt kicker (Jay/Yves)<br>
</li>
</ul>
</div>
<div class="outline-4">
<h4 id="sec-7">2.2.3 Three-way A/B/C first pass split: Jay
2011-02-26 Sat day</h4>
<p><a href="http://cebaf.jlab.org/atlis/task/10869">ATLis
10869</a>: Shunt problems with MAX4T05/MAX4S02 prevented
this
from working, plus delays from power outage. See <a
href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1571186">e1571186</a>.
The
multiharps for 0L03/0L08 were taken 2011-02-25 Fri. Replaced
4
shunts but replacements behaved the same way in terms of
reduced
response. These shunt regulations weren't a problem for G0
at about
these relative shunt levels, but they are now. Ron notes
test plan
in the works to diagnose where we may try more kicking with
correctors
and lower shunt currents.
</p>
</div>
<div class="outline-4">
<h4 id="sec-8">2.2.4 <span class="done">DONE</span>
Injector/NL rematch at MBL0R04: Jay (2h) 2011-02-26 Sat day</h4>
<p><a href="http://cebaf.jlab.org/atlis/task/10882">ATLis
10882</a>: Completed, see <a
href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1570981">e1570981</a>.
Didn't actually change any
injector quads in the longer term; quad changes slightly
degraded
overall match. Observations indicate emittance growth is not
really
rooted in this area.
</p>
</div>
<div class="outline-4">
<h4 id="sec-9">2.2.5 Injector bunch length measurements:
Alicia (3h) 2011-02-26 Sat PM</h4>
<p><a href="http://cebaf.jlab.org/atlis/task/10684">ATLis
10684</a>: Persistent 0L07 dipole overtemperature
prevented
completion. See <a
href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1571307">e1571307</a>.
This was will have to be repeated from
the start for success.
</p>
<ul>
<li><span class="todo">TODO</span> Revisit backphase bunch
length measurements at later date (Alicia)<br>
</li>
</ul>
</div>
<div class="outline-4">
<h4 id="sec-10">2.2.6 Improve match to halls: Jay 2011-03-01
Tue AM</h4>
<p><a href="http://cebaf.jlab.org/atlis/task/10892">ATLis
10892</a>: Some progress with C-S tuning in 1S/1E. Jay
performed
hall A multiharps and several fopts, improved emittances by
factor 4, mostly by improvements in vertical, see <a
href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1572043">e1572043</a>.
Don't
have clean numbers in horizontal; would be nice to get new
data
at 2S10 and 3C04 with tune beam to dumplette.
</p>
<ul>
<li><span class="todo">TODO</span>: Get better match data at
2S10, 3C04 with tune beam to dumplette (Jay)<br>
</li>
</ul>
</div>
</div>
<div class="outline-3">
<h3 id="sec-11">2.3 Beam Studies Planning</h3>
<div class="outline-4">
<h4 id="sec-12">2.3.1 <span class="todo">TODO</span> Improve
match to halls: Jay/Todd 2011-03-03 Thu?</h4>
<p><a href="http://cebaf.jlab.org/atlis/task/10892">ATLis
10892</a>: Continue to improve match into hall C? Revisit
based on
QTor status. Jay will revisit procedure with Todd. Can
reperform
measurement to dumplette; will plan to stay out of hall
until we
can get high current and good statistics on parity DAQ. Can
still
use injector DAQ in coordination with hall with high current
beam
to Hall A in meantime. (Data taken opportunistically swing
2011-03-02
Weds; see <a
href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1572364">e1572364</a>
and <a
href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1572365">e1572365</a>.)
</p>
</div>
<div class="outline-4">
<h4 id="sec-13">2.3.2 <span class="todo">TODO</span>: 5 MeV
helicity magnet parity correction? Riad 2011-03-03 Thu?</h4>
<p>Yves has checked this and it appears to be working, but
injector folks
have not checked it out fully in MCC recently. Poelker has
done basic
checks yesterday only on PZT. Driven by square wave at 980Hz
reversal
frequency? Consulted with Joe Grames/Riad Suleiman on
2011-03-03 Thu;
Riad will likely prepare a test plan. These magnets have not
been used
operationally in the past because they were not needed and
because of
concerns about introduction of extra spin-correlated
systematics.
</p>
</div>
<div class="outline-4">
<h4 id="sec-14">2.3.3 <span class="todo">TODO</span> Parity
quality from injector coupling: Yves/Arne/Riad…</h4>
<p><a href="http://cebaf.jlab.org/atlis/task/8346">ATLis 8346</a>:
Need to revisit with working PZT, other ideas to
improve Qweak parity quality.
</p>
</div>
<div class="outline-4">
<h4 id="sec-15">2.3.4 <span class="todo">TODO</span>
BSY/Recombiner measurements: MikeS (~2h invasive)</h4>
<p><a href="http://cebaf.jlab.org/atlis/task/10810">ATLis
10810</a>: Complete measurements with Lambertson and
calibration
data. Requires at least 3-pass beam.
</p>
</div>
</div>
<div class="outline-3">
<h3 id="sec-16">2.4 Other Beam Studies Planning</h3>
<div class="outline-4">
<h4 id="sec-17">2.4.1 <span class="todo">TODO</span> Assemble
list of priorities before summer SAD (Todd)</h4>
<p>Strategic suggestions during the meeting included establish
a baseline
of 6 GeV CEBAF at the end of the current run, and
investigating Arne's
improved optics.
</p>
<p>
We have a ~1d possible maintenance/studies availability on
Mon
2011-03-07. How can we leverage this time most effectively?
What
maintenance should be done to address issues found during
beam studies
in the past week? NOTE that we stay in one-pass until
Tue2011-03-08.
Hall A now wants to run Mon 2011-03-07, and will likely be
off Tue
2011-03-08. We may be able to run beam to Hall C by Tue
2011-03-08, so
maintenance/beam studies for Tue 2011-03-08 look more
feasible.
</p>
<p>
There was a great deal of discussion of near-term facility
planning for
various contingencies for Mar 7-9. My recommendation for
future meetings
is that we focus on beam studies prioritizations, benefits,
and requirements,
and make schedule recommendations based on personnel
availability. This will
give the PD the maximum flexibility to arrange their
schedule.
</p>
</div>
<div class="outline-4">
<h4 id="sec-18">2.4.2 Comments on Maintenance: SteveS</h4>
<ul>
<li>
Driver should be studies between now and 6 month SAD.
</li>
<li>
Shunt regulation? But not necessary if we aren't doing the
split.
</li>
<li>
0L07 magnet spectrometer is important for backphase bunch
length msmt,
probably also will be needed with little lead time in ops
sometime.
</li>
<li><span class="todo">TODO</span> 0L07 magnet spectrometer
checkout (and possible repair) (Ron/SteveS)<br>
</li>
</ul>
</div>
</div>
<div class="outline-3">
<h3 id="sec-19">2.5 APEL Hall Liason Comments</h3>
<div class="outline-4">
<h4 id="sec-20">2.5.1 Hall A: Yves</h4>
</div>
<div class="outline-4">
<h4 id="sec-21">2.5.2 Hall B: Tief</h4>
</div>
<div class="outline-4">
<h4 id="sec-22">2.5.3 Hall C: Jay</h4>
</div>
</div>
<div class="outline-3">
<h3 id="sec-23">2.6 AOB?</h3>
<div class="outline-4">
<h4 id="sec-24">2.6.1 <span class="todo">TODO</span> Injector
configuration documentation: Reza</h4>
<p>Document proper operational injector configuration (6.3 MeV
energy,
crested within 5 degrees, etc): Reza et al
</p>
</div>
</div>
</div>
<div id="postamble">
<p class="author"> Author: Todd Satogata
<a href="mailto:satogata@Todd-Satogatas-MacBook-Pro.local"><satogata@Todd-Satogatas-MacBook-Pro.local></a>
</p>
<p class="date"> Date: 2011/03/07 11:20:58</p>