<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
  </head>
  <body>
    <title>BTeam-2011-03-02</title>
    <meta http-equiv="Content-Type" content="text/html;
      charset=ISO-8859-1">
    <meta name="generator" content="Org-mode">
    <meta name="generated" content="2011/03/07 11:20:58">
    <meta name="author" content="Todd Satogata">
    <style type="text/css">
  html {
        font-family: Times, serif;
        font-size: 12pt;
  }
  .title { text-align: center; }
  .todo  { color: red; }
  .done { color: green; }
  .timestamp { color: grey }
  .timestamp-kwd { color: CadetBlue }
  .tag { background-color:lightblue; font-weight:normal }
  .target { background-color: lavender; }
  pre {
        border: 1pt solid #AEBDCC;
        background-color: #F3F5F7;
        padding: 5pt;
        font-family: courier, monospace;
  }
  table { border-collapse: collapse; }
  td, th {
        vertical-align: top;
        <!--border: 1pt solid #ADB9CC;-->
  }
</style>BTeam -<br>
    <br>
    Here are notes from last Wednesday's BTeam meeting, partly to
    facilitate discussion and input for the priorities request I sent
    out earlier today. In the future I'll be sending separate mails of
    the meeting notes and meeting agendas so we can share comment/input
    on the previous week's notes that make it into the next week's
    agenda.<br>
    <br>
    -Todd<br>
    <h1 class="title">BTeam 2011-03-02</h1>
    <div class="outline-2">
      <h2 id="sec-2">2 2011-03-02 Wed 14:00 BTeam Meeting Notes</h2>
      <div class="outline-3">
        <h3 id="sec-3">2.1 Optics-on-Call Report: Alicia/Reza =>
          Rui/Mike</h3>
        <p>Tons of failures and recovery efforts made this a rather
          exciting and frustrating week. Qweak has been down since
          Friday with a QTor problem, but has known parity quality
          issues that were discussed in a 2011-02-28 Mon 15:00 meeting.
          Hall A has bean quality issues as well, in the sense that
          their beam size is too large.
        </p>
        <p>
          The A/C split scheduled for Friday was attempted day
          2011-02-26
          Sat but failed due to regulation problems with, e.g.,
          MAX4T05/MAX4S02. We continue to try to address hall issues in
          beam studies and take advantage of "free" beam availability,
          but
          were sometimes hampered by equipment failures.
        </p>
      </div>
      <div class="outline-3">
        <h3 id="sec-4">2.2 Beam Studies Report</h3>
        <div class="outline-4">
          <h4 id="sec-5">2.2.1 BSY/Recombiner measurements: MikeS (~4h)
            2011-02-24 Thu PM</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10810">ATLis
              10810</a>: Multipole measurements in the 6T beamline.
            Nearly
            finished up, but will need a little more time for lambertson
            and calibration data. See <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1571680">e1571680</a>.
          </p>
          <ul>
            <li><span class="todo">TODO</span> Final measurements (~4h?)
              for Lambertson, calibrations (MikeS)<br>
            </li>
          </ul>
        </div>
        <div class="outline-4">
          <h4 id="sec-6">2.2.2 PZT Resurrection: Arne/Yves 2011-02-24
            Thu AM</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10864">ATLis
              10864</a>: Arne and Yves tried using PZT but only got good
            results
            with corrector kicks. See <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1570339">e1570339</a>.
            Matt Poelker later showed that
            PZT itself works, see <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1572018">e1572018</a>;
            is there a problem with PZT Booster
            software signals, or translation of those signals to
            hardware? Can
            this be investigated parasitically? In the meantime
            decoupling work
            was done with DC kicks.
          </p>
          <p>
            Injector Fopt data is peculiar. Suspect that an injector
            Fopt kicker
            is rotated to produce coupling in the injector Fopt signal.
            No OPS-PR
            generated yet, but Yves and/or Jay will generate one for
            followup.
          </p>
          <ul>
            <li><span class="todo">TODO</span> Check parity quality with
              new decoupling when Hall C returns<br>
            </li>
            <li><span class="todo">TODO</span> Generate OPS-PR for
              suspect rotated injector Fopt kicker (Jay/Yves)<br>
            </li>
          </ul>
        </div>
        <div class="outline-4">
          <h4 id="sec-7">2.2.3 Three-way A/B/C first pass split: Jay
            2011-02-26 Sat day</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10869">ATLis
              10869</a>: Shunt problems with MAX4T05/MAX4S02 prevented
            this
            from working, plus delays from power outage. See <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1571186">e1571186</a>.
            The
            multiharps for 0L03/0L08 were taken 2011-02-25 Fri. Replaced
            4
            shunts but replacements behaved the same way in terms of
            reduced
            response. These shunt regulations weren't a problem for G0
            at about
            these relative shunt levels, but they are now. Ron notes
            test plan
            in the works to diagnose where we may try more kicking with
            correctors
            and lower shunt currents.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-8">2.2.4 <span class="done">DONE</span>
            Injector/NL rematch at MBL0R04: Jay (2h) 2011-02-26 Sat day</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10882">ATLis
              10882</a>: Completed, see <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1570981">e1570981</a>.
            Didn't actually change any
            injector quads in the longer term; quad changes slightly
            degraded
            overall match. Observations indicate emittance growth is not
            really
            rooted in this area.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-9">2.2.5 Injector bunch length measurements:
            Alicia (3h) 2011-02-26 Sat PM</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10684">ATLis
              10684</a>: Persistent 0L07 dipole overtemperature
            prevented
            completion. See <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1571307">e1571307</a>.
            This was will have to be repeated from
            the start for success.
          </p>
          <ul>
            <li><span class="todo">TODO</span> Revisit backphase bunch
              length measurements at later date (Alicia)<br>
            </li>
          </ul>
        </div>
        <div class="outline-4">
          <h4 id="sec-10">2.2.6 Improve match to halls: Jay 2011-03-01
            Tue AM</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10892">ATLis
              10892</a>: Some progress with C-S tuning in 1S/1E. Jay
            performed
            hall A multiharps and several fopts, improved emittances by
            factor 4, mostly by improvements in vertical, see <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1572043">e1572043</a>.
            Don't
            have clean numbers in horizontal; would be nice to get new
            data
            at 2S10 and 3C04 with tune beam to dumplette.
          </p>
          <ul>
            <li><span class="todo">TODO</span>: Get better match data at
              2S10, 3C04 with tune beam to dumplette (Jay)<br>
            </li>
          </ul>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-11">2.3 Beam Studies Planning</h3>
        <div class="outline-4">
          <h4 id="sec-12">2.3.1 <span class="todo">TODO</span> Improve
            match to halls: Jay/Todd 2011-03-03 Thu?</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10892">ATLis
              10892</a>: Continue to improve match into hall C? Revisit
            based on
            QTor status. Jay will revisit procedure with Todd. Can
            reperform
            measurement to dumplette; will plan to stay out of hall
            until we
            can get high current and good statistics on parity DAQ. Can
            still
            use injector DAQ in coordination with hall with high current
            beam
            to Hall A in meantime. (Data taken opportunistically swing
            2011-03-02
            Weds; see <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1572364">e1572364</a>
            and <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1572365">e1572365</a>.)
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-13">2.3.2 <span class="todo">TODO</span>: 5 MeV
            helicity magnet parity correction? Riad 2011-03-03 Thu?</h4>
          <p>Yves has checked this and it appears to be working, but
            injector folks
            have not checked it out fully in MCC recently. Poelker has
            done basic
            checks yesterday only on PZT. Driven by square wave at 980Hz
            reversal
            frequency? Consulted with Joe Grames/Riad Suleiman on
            2011-03-03 Thu;
            Riad will likely prepare a test plan. These magnets have not
            been used
            operationally in the past because they were not needed and
            because of
            concerns about introduction of extra spin-correlated
            systematics.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-14">2.3.3 <span class="todo">TODO</span> Parity
            quality from injector coupling: Yves/Arne/Riad…</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/8346">ATLis 8346</a>:
            Need to revisit with working PZT, other ideas to
            improve Qweak parity quality.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-15">2.3.4 <span class="todo">TODO</span>
            BSY/Recombiner measurements: MikeS (~2h invasive)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10810">ATLis
              10810</a>: Complete measurements with Lambertson and
            calibration
            data. Requires at least 3-pass beam.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-16">2.4 Other Beam Studies Planning</h3>
        <div class="outline-4">
          <h4 id="sec-17">2.4.1 <span class="todo">TODO</span> Assemble
            list of priorities before summer SAD (Todd)</h4>
          <p>Strategic suggestions during the meeting included establish
            a baseline
            of 6 GeV CEBAF at the end of the current run, and
            investigating Arne's
            improved optics.
          </p>
          <p>
            We have a ~1d possible maintenance/studies availability on
            Mon
            2011-03-07. How can we leverage this time most effectively?
            What
            maintenance should be done to address issues found during
            beam studies
            in the past week? NOTE that we stay in one-pass until
            Tue2011-03-08.
            Hall A now wants to run Mon 2011-03-07, and will likely be
            off Tue
            2011-03-08. We may be able to run beam to Hall C by Tue
            2011-03-08, so
            maintenance/beam studies for Tue 2011-03-08 look more
            feasible.
          </p>
          <p>
            There was a great deal of discussion of near-term facility
            planning for
            various contingencies for Mar 7-9. My recommendation for
            future meetings
            is that we focus on beam studies prioritizations, benefits,
            and requirements,
            and make schedule recommendations based on personnel
            availability. This will
            give the PD the maximum flexibility to arrange their
            schedule.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-18">2.4.2 Comments on Maintenance: SteveS</h4>
          <ul>
            <li>
              Driver should be studies between now and 6 month SAD.
            </li>
            <li>
              Shunt regulation? But not necessary if we aren't doing the
              split.
            </li>
            <li>
              0L07 magnet spectrometer is important for backphase bunch
              length msmt,
              probably also will be needed with little lead time in ops
              sometime.
            </li>
            <li><span class="todo">TODO</span> 0L07 magnet spectrometer
              checkout (and possible repair) (Ron/SteveS)<br>
            </li>
          </ul>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-19">2.5 APEL Hall Liason Comments</h3>
        <div class="outline-4">
          <h4 id="sec-20">2.5.1 Hall A: Yves</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-21">2.5.2 Hall B: Tief</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-22">2.5.3 Hall C: Jay</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-23">2.6 AOB?</h3>
        <div class="outline-4">
          <h4 id="sec-24">2.6.1 <span class="todo">TODO</span> Injector
            configuration documentation: Reza</h4>
          <p>Document proper operational injector configuration (6.3 MeV
            energy,
            crested within 5 degrees, etc): Reza et al
          </p>
        </div>
      </div>
    </div>
    <div id="postamble">
      <p class="author"> Author: Todd Satogata
        <a href="mailto:satogata@Todd-Satogatas-MacBook-Pro.local"><satogata@Todd-Satogatas-MacBook-Pro.local></a>
      </p>
      <p class="date"> Date: 2011/03/07 11:20:58</p>
    </div>
  </body>
</html>