<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
  </head>
  <body>
    <title>BTeam-2011-03-09</title>
    <meta http-equiv="Content-Type" content="text/html;
      charset=ISO-8859-1">
    <meta name="generator" content="Org-mode">
    <meta name="generated" content="2011/03/09 09:36:51">
    <meta name="author" content="Todd Satogata">
    <style type="text/css">
  html {
        font-family: Times, serif;
        font-size: 12pt;
  }
  .title { text-align: center; }
  .todo  { color: red; }
  .done { color: green; }
  .timestamp { color: grey }
  .timestamp-kwd { color: CadetBlue }
  .tag { background-color:lightblue; font-weight:normal }
  .target { background-color: lavender; }
  pre {
        border: 1pt solid #AEBDCC;
        background-color: #F3F5F7;
        padding: 5pt;
        font-family: courier, monospace;
  }
  table { border-collapse: collapse; }
  td, th {
        vertical-align: top;
        <!--border: 1pt solid #ADB9CC;-->
  }
</style>BTeam -<br>
    <br>
    Here is the agenda for this afternoon's BTeam meeting, 14:00-15:00
    after the weekly 13:30 meeting. The first item is a reminder to send
    me your strategic priorities for BTeam on or before Mon Mar 14; I'm
    happy to discuss any ideas you have with you offline while
    soliciting your input. Many thanks to those (Joe, Noel, Steve,
    MikeS, Ryan) that have already sent me their input. Time is tight
    but there is still time to do a lot before the six month SAD; we
    need to make sure that we're in a good position as we move into it.
    See you at the meeting this afternoon!<br>
    <br>
    -Todd<br>
    <h1 class="title">BTeam 2011-03-09</h1>
    <div class="outline-2">
      <h2 id="sec-1">1 9.5 weeks remaining before 6-month SAD (pending
        firm budget)</h2>
    </div>
    <div class="outline-2">
      <h2 id="sec-2">2 2011-03-09 Wed 14:00 BTeam Meeting Agenda</h2>
      <div class="outline-3">
        <h3 id="sec-3">2.1 Call for Strategic Priorities for BTeam</h3>
        <p>Todd is soliciting input on priorities for studies before the
          6
          month SAD, emphasizing strategy rather than tactics. Items
          currently on the list include CEBAF baseline, MO pathlength,
          thesis
          topics, LOCO and model-driven optics, procedure and
          troubleshooting
          verifications (including ORFP), and a Mott polarimeter
          precision
          study.
        </p>
        <div class="outline-4">
          <h4 id="sec-4">2.1.1 <span class="todo">TODO</span> Send Todd
            your input on or before Mon 2011-03-14</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-5">2.2 Optics-on-Call Report: Rui/Mike =>
          Yuhong/Tief</h3>
      </div>
      <div class="outline-3">
        <h3 id="sec-6">2.3 Beam Studies Report</h3>
        <div class="outline-4">
          <h4 id="sec-7">2.3.1 Several Multiharps: Ops 2011-03-04 Fri
            Day (opportunistic)</h4>
          <p>Analysis from Jay: Injector IPM0L01 (<a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1572606">e1572606</a>),
            Arc1 IPM1E02 (<a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1572609">e1572609</a>),
Arc2
            IPM2S09 (<a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1572610">e1572610</a>).
            There is an open question from Jay in a
            comparison of Arc1/Arc2 data for 12 GeV matching about
            location of
            harps before 2S10 and RF separation , see <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1572645">e1572645</a>.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-8">2.3.2 Injector Multiharp: 2011-03-08 Tue Day
            (opportunistic) ??</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-9">2.3.3 Major maintenance day: Steve 2011-03-08
            Tue Day</h4>
          <p>A huge amount of maintenance work was done on Tuesday, see
            <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573258">e1573258</a>.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-10">2.3.4 BSY/Recombiner 6T corrector
            measurements: MikeS 2011-03-08 Tue Day</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10810">ATLis
              10810</a>: Multipole measurements in the 6T beamline.
            Nearly
            finished up, but will need a several more hours for
            lambertson
            and calibration data in a few weeks. See <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573418">e1573418</a>.
          </p>
          <ul>
            <li><span class="todo">TODO</span> Final measurements (~4h)
              for Lambertson, calibrations (MikeS)<br>
            </li>
          </ul>
        </div>
        <div class="outline-4">
          <h4 id="sec-11">2.3.5 Injector fopt coupling check: Jay
            2011-03-08 Tue Day</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10918">ATLis
              10918</a>: See <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573295">e1573295</a>.
            Some coupling has been visible in injector
            fopts. Jay visually inspected the injector fopt 30Hz and
            noted
            that they cover 175 degrees each instead of 120 degrees, so
            they
            include skew components if incoming beam is not centered.
            Should
            we replace them with MAT correctors?
          </p>
          <ul>
            <li><span class="todo">TODO</span> Discuss impact of inj
              fopt correctors, cost/benefit of replacement<br>
            </li>
          </ul>
        </div>
        <div class="outline-4">
          <h4 id="sec-12">2.3.6 HA Fopt, HA/HC Multiharp: Ops diagnostic
            2011-03-09 Wed Owl</h4>
          <p>30Hz aperture scans were taken overnight (<a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573528">e1573528</a>)
            as well
            as an fopt to Hall A (<a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573529">e1573529</a>)
            and unanalyzed Hall A and Hall C
            harp scans (<a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573530">e1573530</a>
            and <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573532">e1573532</a>).
          </p>
          <ul>
            <li><span class="todo">TODO</span> Analyze data, establish
              conclusions about Hall A/C matches.<br>
            </li>
          </ul>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-13">2.4 Beam Studies Planning</h3>
        <div class="outline-4">
          <h4 id="sec-14">2.4.1 1kHz Helicity Magnet Characterization:
            Riad, Buddhini (4h)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10905">ATLis
              10905</a>: There is a request from Hall C to check the
            parity
            quality helicity magnets at the current ~1kHz switch rate.
            This
            is work to the inline dump at 140 uA. These magnets have not
            been
            used operationally in the past because they were not needed
            and
            because of concerns about introduction of extra
            spin-correlated
            systematics.
          </p>
          <ul>
            <li><span class="todo">TODO</span> Schedule, possibly
              2011-03-10 Thu in prep for Hall C return?<br>
            </li>
          </ul>
        </div>
        <div class="outline-4">
          <h4 id="sec-15">2.4.2 PZT Resurrection and HC Parity Quality:
            Arne/Yves</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10864">ATLis
              10864</a>: PZT mirrors work; does PZT Booster work? Work
            from
            Arne and Yves on decoupling needs to be checked with beam.
          </p>
          <ul>
            <li><span class="todo">TODO</span> Check parity quality with
              new decoupling when Hall C returns<br>
            </li>
            <li><span class="todo">TODO</span> Revisit <a
                href="http://cebaf.jlab.org/atlis/task/8346">ATLis 8346</a>,
              PZT if parity quality deems this necessary<br>
            </li>
          </ul>
        </div>
        <div class="outline-4">
          <h4 id="sec-16">2.4.3 BSY/Recombiner measurements: MikeS (~4h
            invasive)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10810">ATLis
              10810</a>: Complete measurements with Lambertson and
            calibration
            data. Requires at least 3-pass beam, but setup is fairly
            straightforward.
          </p>
          <ul>
            <li><span class="todo">TODO</span> Prep for this study,
              likely schedule week of PAC'11 2011-03-23ish<br>
            </li>
          </ul>
        </div>
        <div class="outline-4">
          <h4 id="sec-17">2.4.4 Injector bunch length measurements:
            Alicia (3h) 2011-02-26 Sat PM</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10684">ATLis
              10684</a>: Persistent 0L07 dipole overtemperature
            prevented
            completion. See <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1571307">e1571307</a>.
            This was will have to be repeated from
            the start for success.
          </p>
          <ul>
            <li><span class="todo">TODO</span> Revisit backphase bunch
              length measurements after PAC'11 (Alicia)<br>
            </li>
          </ul>
        </div>
        <div class="outline-4">
          <h4 id="sec-18">2.4.5 Other items based on initial strategic
            priority suggestions</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-19">2.5 APEL Hall Liason Comments</h3>
        <div class="outline-4">
          <h4 id="sec-20">2.5.1 Hall A: Yves (on travel)</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-21">2.5.2 Hall B: Tief</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-22">2.5.3 Hall C: Jay</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-23">2.6 AOB?</h3>
        <div class="outline-4">
          <h4 id="sec-24">2.6.1 <span class="todo">TODO</span> Injector
            configuration documentation: Reza</h4>
          <p>Document proper operational injector configuration (6.3 MeV
            energy,
            crested within 5 degrees, etc): Reza et al
          </p>
        </div>
      </div>
    </div>
    <div id="postamble">
      <p class="author"> Author: Todd Satogata
        <a href="mailto:satogata@Todd-Satogatas-MacBook-Pro.local"><satogata@Todd-Satogatas-MacBook-Pro.local></a>
      </p>
      <p class="date"> Date: 2011/03/09 09:36:51</p>
    </div>
  </body>
</html>