<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
  </head>
  <body>
    <title>BTeam-2011-03-16</title>
    <meta http-equiv="Content-Type" content="text/html;
      charset=ISO-8859-1">
    <meta name="generator" content="Org-mode">
    <meta name="generated" content="2011/03/16 13:06:03">
    <meta name="author" content="Todd Satogata">
    <style type="text/css">
  html {
        font-family: Times, serif;
        font-size: 12pt;
  }
  .title { text-align: center; }
  .todo  { color: red; }
  .done { color: green; }
  .timestamp { color: grey }
  .timestamp-kwd { color: CadetBlue }
  .tag { background-color:lightblue; font-weight:normal }
  .target { background-color: lavender; }
  pre {
        border: 1pt solid #AEBDCC;
        background-color: #F3F5F7;
        padding: 5pt;
        font-family: courier, monospace;
  }
  table { border-collapse: collapse; }
  td, th {
        vertical-align: top;
        <!--border: 1pt solid #ADB9CC;-->
  }
</style>
    <h1 class="title">BTeam-2011-03-16</h1>
    <div class="outline-2">
      <h2 id="sec-1">1 8.5 weeks remaining before 6-month SAD (pending
        firm budget)</h2>
    </div>
    <div class="outline-2">
      <h2 id="sec-2">2 2011-03-16 Wed 14:00 BTeam Meeting Agenda</h2>
      <div class="outline-3">
        <h3 id="sec-3">2.1 Todd away editing PAC'11: Mar 21-Apr 3</h3>
        Mike Spata will be acting BTeam lead for the next two weeks.
        Thanks, Mike!!<br>
      </div>
      <div class="outline-3">
        <h3 id="sec-4">2.2 Call for Strategic Priorities for BTeam</h3>
        <p>Todd is soliciting input on priorities for studies before the
          6
          month SAD, emphasizing strategy rather than tactics. Items
          currently on the list include CEBAF baseline, MO pathlength,
          thesis
          topics, LOCO and model-driven optics, procedure and
          troubleshooting
          verifications (including ORFP), and a Mott polarimeter
          precision
          study. Only one input since last BTeam meeting. Todd will
          assemble these and circulate them for input.<br>
        </p>
      </div>
      <div class="outline-3">
        <h3 id="sec-5">2.3 Optics-on-Call Report: Yuhong/Tief =>
          Balsa/Alex (Alicia over weekend)</h3>
      </div>
      <div class="outline-3">
        <h3 id="sec-6">2.4 Beam Studies Report</h3>
        <div class="outline-4">
          <h4 id="sec-7">2.4.1 Backphase bunch length measurements:
            Alicia/Reza 2011-03-09 Wed PM</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10684">ATLis
              10684</a>: Success, see <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573668">e1573668</a>.
            Reza set up 130 kV gun settings so
            the bunchlength too should work for non-experts now. There
            is a desire
            to follow this up later with different settings and currents
            and
            optimizing bunch length. More testplans to come.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-8">2.4.2 Arc1 optics: Arne 2011-03-09 Wed PM</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10652">ATLis
              10652</a>: Arc1 portion only. Success in the sense that
            this was tuned
            up and left in the machine, see <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573666">e1573666</a>
            and <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573703">e1573703</a>
            and <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573708">e1573708</a>.
            PZT problems noted in <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573693">e1573693</a>.
            Multiharps and fopts performed and
            look reasonably clean, then ORFP was run overnight by ops.
            ART++ was
            later reconfigured with new injector optics, <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573808">e1573808</a>
            so PZT Booster
            could use proper optics.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-9">2.4.3 BPMs checked for future LOCO work: Pete
            2011-03-10 Thu PM</h4>
          <p>Pete checked the east arc BPMs that Tief had noted were
            noisy in LOCO
            and RayTrace tests. These were recalibrated and passed local
            tests,
            appear good to use, <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573816">e1573816</a>.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-10">2.4.4 JT valve max flow: Larry King et al
            2011-03-10 Thu AM</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/7874">ATLis 7874</a>:
            Successful, checked to 2L21 and ATLis closed out. No
            conclusions yet but should be forthcoming, see <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573854">e1573854</a>.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-11">2.4.5 BSY/Recombiner measurements: MikeS
            2011-03-10 Thu PM</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10810">ATLis
              10810</a>: Completed measurements with Lambertson and
            calibration
            data. Successful, closed out ATLis. See <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573900">e1573900</a>
            and <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573922">e1573922</a>.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-12">2.4.6 Injector/Hall optics, Arc1 match:
            Jay/Arne/Reza et al 2011-03-11 Fri AM</h4>
          <p><a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573969">e1573969</a>:
            baselined fopt, installed injector match and reworked Arc1
            optics from Arne, fopt, ORFP, and multiharps to check
            various matches.
            fopt after ORFP in <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573999">e1573999</a>,
            C-S after ORFP in <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1574019">e1574019</a>.
            Injector was
            retuned for high current by Reza, <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1574085">e1574085</a>,
            and 3C20 harp trace looked
            good afterwards, <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1574098">e1574098</a>.
            Good enough for weekend operations.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-13">2.4.7 1kHz helicity magnet commissioning: Riad
            2011-03-15 Tue AM</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10905">ATLis
              10905</a>: Data acquired for analysis after tornado drill
            in
            conjunction with Hall C.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-14">2.4.8 Injector BLM sensitivity test: Jay
            2011-03-15 Tue PM</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10781">ATLis
              10781</a>: Reduced voltage on 0R04, <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1574836">e1574836</a>,
            but still trips at
            0.64 uA. Couldn't get 0R03 to trip; 0R04 was always first to
            trip.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-15">2.4.9 Quad centering: Ops 2011-03-15 Tue PM</h4>
          <p>Quads 6A05 and 4A05 were both centered, see <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1574875">e1574875</a>.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-16">2.4.10 Outstanding ToDo items from previous
            beam studies</h4>
          <ul>
            <li><span class="todo">TODO</span> Review/establish planned
              12 GeV optics match procedures in<br>
              spreaders/recombiners.
            </li>
            <li><span class="todo">TODO</span> CASA review of Arc1/Arc2
              data from <a
                href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1572645">e1572645</a>.<br>
            </li>
            <li><span class="todo">TODO</span> Discuss impact of inj
              fopt correctors, cost/benefit of replacement<br>
            </li>
            <li><span class="todo">TODO</span> Revisit <a
                href="http://cebaf.jlab.org/atlis/task/8346">ATLis 8346</a>,
              PZT if parity quality deems this necessary<br>
            </li>
            <li><span class="todo">TODO</span> Check Ryan's availability
              for HC 62MeV RayTrace measurement, analysis<br>
            </li>
          </ul>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-17">2.5 Beam Studies Planning</h3>
        <div class="outline-4">
          <h4 id="sec-18">2.5.1 Measuring 0L03/0L04 and capture/quarter
            transport: Yves</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/9621">ATLis 9621</a>
            and <a href="http://cebaf.jlab.org/atlis/task/9622">ATLis
              9622</a>. What is Yves's availability?
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-19">2.5.2 PZT Booster resurrection: Arne et al</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10864">ATLis
              10864</a>: Need Arne, Jay, Yves, or Riad present for
            testing assuming
            that there are still Hall C beam quality/pqrity quality
            issues.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-20">2.5.3 Low-current BPM test: John Musson</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10890">ATLis
              10890</a>: Check dynamic range of BCM/BPMs from 50-200 nA
            with
            good accuracy for Qweak for g2p.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-21">2.5.4 LOCO/Ray-Trace optics tests: Yves, Ryan,
            Tief</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10708">ATLis
              10708</a>: Continued optics evaluation of machine,
            particularly Arc3.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-22">2.6 APEL Hall Liason Comments</h3>
        <div class="outline-4">
          <h4 id="sec-23">2.6.1 Hall A: Yves (on travel?)</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-24">2.6.2 Hall B: Tief</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-25">2.6.3 Hall C: Jay</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-26">2.7 AOB?</h3>
        <div class="outline-4">
          <h4 id="sec-27">2.7.1 <span class="todo">TODO</span> Injector
            configuration documentation: Reza</h4>
          <p>Document proper operational injector configuration (6.3 MeV
            energy,
            crested within 5 degrees, etc): Reza et al
          </p>
          <p>
======================================================================
          </p>
        </div>
      </div>
    </div>
    <div class="outline-2">
      <h2 id="sec-28">3 2011-03-09 Wed 14:00 BTeam Meeting Minutes</h2>
      <div class="outline-3">
        <h3 id="sec-29">3.1 Call for Strategic Priorities for BTeam</h3>
        <p>Todd is soliciting input on priorities for studies before the
          6
          month SAD, emphasizing strategy rather than tactics. Items
          currently on the list include CEBAF baseline, MO pathlength,
          thesis
          topics, LOCO and model-driven optics, procedure and
          troubleshooting
          verifications (including ORFP), and a Mott polarimeter
          precision
          study.
        </p>
        <div class="outline-4">
          <h4 id="sec-30">3.1.1 <span class="todo">TODO</span> Send
            Todd your input on or before Mon 2011-03-14</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-31">3.2 Optics-on-Call Report: Rui/Mike =>
          Yuhong/Tief</h3>
        <p>No calls! (Hooray.)
        </p>
      </div>
      <div class="outline-3">
        <h3 id="sec-32">3.3 Beam Studies Report</h3>
        <div class="outline-4">
          <h4 id="sec-33">3.3.1 Several Multiharps: Ops 2011-03-04 Fri
            Day (opportunistic)</h4>
          <p>Analysis from Jay: Injector IPM0L01 (<a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1572606">e1572606</a>),
            Arc1 IPM1E02 (<a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1572609">e1572609</a>),
Arc2
            IPM2S09 (<a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1572610">e1572610</a>).
            There is an open question from Jay in a
            comparison of Arc1/Arc2 data for 12 GeV matching about
            location of
            harps before 2S10 and RF separation , see <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1572645">e1572645</a>.
            There are still
            decisions to be made about diagnostics for 12 GeV optics
            match
            procedures. Geoff notes that "standard" CASA folks (Tief,
            Yves) won't
            want harps but instead will want SLMs.
            Discussion of <a
              href="https://cebaf.jlab.org/elog/entry/1573621">https://cebaf.jlab.org/elog/entry/1573621</a>
          </p>
          <ul>
            <li><span class="todo">TODO</span> Review/establish planned
              12 GeV optics match procedures in<br>
              spreaders/recombiners.
            </li>
            <li><span class="todo">TODO</span> CASA review of Arc1/Arc2
              data from e1572645 linked above.<br>
            </li>
          </ul>
        </div>
        <div class="outline-4">
          <h4 id="sec-34">3.3.2 Injector Multiharp: 2011-03-08 Tue Day
            (opportunistic) ??</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-35">3.3.3 Discussion of opportunistic multiharps
            vs other tasks</h4>
          <p>Q measurements, what else can be done independently by ops
            at 3 AM?
            Chris Slominski (acting PD) and Todd will review current
            ATLis items.
            e.g. simple optics check (pathlength, fopt, etc).
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-36">3.3.4 Major maintenance day: Steve 2011-03-08
            Tue Day</h4>
          <p>A huge amount of maintenance work was done on Tuesday, see
            <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573258">e1573258</a>.
            This includes many repairs of equipment from a list made a
            week ago
            for beam studies.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-37">3.3.5 BSY/Recombiner 6T corrector
            measurements: MikeS 2011-03-08 Tue Day</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10810">ATLis
              10810</a>: Multipole measurements in the 6T beamline.
            Nearly
            finished up, but will need a several more hours for
            lambertson
            and calibration data in a few weeks. See <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573418">e1573418</a>.
            Trim card
            circuit is having trouble making voltage; Sarin is working
            on
            board modification to give larger voltage. Mike gets 6mm,
            would
            prefer larger for some remaining measurements. May be able
            to
            run opportunistically 2011-03-09 Wed Eve.
          </p>
          <ul>
            <li><span class="todo">TODO</span> Final measurements (~4h)
              for Lambertson, calibrations (MikeS)<br>
            </li>
          </ul>
        </div>
        <div class="outline-4">
          <h4 id="sec-38">3.3.6 Injector fopt coupling check: Jay
            2011-03-08 Tue Day</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10918">ATLis
              10918</a>: See <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573295">e1573295</a>.
            Some coupling has been visible in injector
            fopts. Jay visually inspected the injector fopt 30Hz and
            noted
            that they cover 175 degrees each instead of 120 degrees, so
            they
            include skew components if incoming beam is not centered.
            Should
            we replace them with MAT correctors? Did not investigate
            helicity
            correctors. Arne recommends that we get this fixed during 6
            mo SAD.
          </p>
          <ul>
            <li><span class="todo">TODO</span> Discuss impact of inj
              fopt correctors, cost/benefit of replacement<br>
            </li>
          </ul>
        </div>
        <div class="outline-4">
          <h4 id="sec-39">3.3.7 HA Fopt, HA/HC Multiharp: Ops diagnostic
            2011-03-09 Wed Owl</h4>
          <p>30Hz aperture scans were taken overnight (<a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573528">e1573528</a>)
            as well
            as an fopt to Hall A (<a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573529">e1573529</a>)
            and unanalyzed Hall A and Hall C
            harp scans (<a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573530">e1573530</a>
            and <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573532">e1573532</a>).
            Fopt linac BPM pass select
            switch was later found set to "4.2 uS, Pass One" (<a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1573617">e1573617</a>)
            instead of "Auto Select Pass".
          </p>
          <ul>
            <li><span class="todo">TODO</span> Change Fopt linac BPM
              pass select switch.<br>
            </li>
            <li><span class="todo">TODO</span> Finish analysis,
              establish conclusions about Hall A/C matches.<br>
            </li>
          </ul>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-40">3.4 Beam Studies Planning</h3>
        <div class="outline-4">
          <h4 id="sec-41">3.4.1 1kHz Helicity Magnet Characterization:
            Riad, Buddhini (4h)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10905">ATLis
              10905</a>: There is a request from Hall C to check the
            parity
            quality helicity magnets at the current ~1kHz switch rate.
            This
            is work to the inline dump at 140 uA. These magnets have not
            been
            used operationally in the past because they were not needed
            and
            because of concerns about introduction of extra
            spin-correlated
            systematics.
          </p>
          <ul>
            <li><span class="todo">TODO</span> Schedule, possibly
              2011-03-10 Thu in prep for Hall C return<br>
              or 2011-03-15 Tue based on current PD schedule?
              Opportunistic for
              2011-03-09 Wed Eve?
            </li>
          </ul>
        </div>
        <div class="outline-4">
          <h4 id="sec-42">3.4.2 PZT Resurrection and HC Parity Quality:
            Arne/Yves</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10864">ATLis
              10864</a>: PZT mirrors work; does PZT Booster work? Work
            from
            Arne and Yves on decoupling needs to be checked with beam.
            Michele
            notes that ART++ has not been updated with proper energy for
            adiabatic damping, and may have contributed to PZT Booster
            problems.
          </p>
          <ul>
            <li><span class="todo">TODO</span> Check parity quality with
              new decoupling when Hall C returns<br>
            </li>
            <li><span class="todo">TODO</span> Revisit <a
                href="http://cebaf.jlab.org/atlis/task/8346">ATLis 8346</a>,
              PZT if parity quality deems this necessary<br>
            </li>
            <li><span class="todo">TODO</span> Put Alex's injector
              optics into ART++ for PZT Booster use (Michele)<br>
            </li>
          </ul>
        </div>
        <div class="outline-4">
          <h4 id="sec-43">3.4.3 BSY/Recombiner measurements: MikeS (~4h
            invasive)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10810">ATLis
              10810</a>: Complete measurements with Lambertson and
            calibration
            data. Requires at least 3-pass beam, but setup is fairly
            straightforward.
          </p>
          <ul>
            <li><span class="todo">TODO</span> Prep for this study,
              likely schedule week of PAC'11 2011-03-23ish or
              opportunistically<br>
            </li>
          </ul>
        </div>
        <div class="outline-4">
          <h4 id="sec-44">3.4.4 Injector bunch length measurements:
            Alicia (3h) 2011-02-26 Sat PM</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10684">ATLis
              10684</a>: Persistent 0L07 dipole overtemperature
            prevented
            completion. See <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1571307">e1571307</a>.
            This was will have to be repeated from
            the start for success.
          </p>
          <ul>
            <li><span class="todo">TODO</span> Revisit backphase bunch
              length measurements after PAC'11 (Alicia)<br>
            </li>
          </ul>
        </div>
        <div class="outline-4">
          <h4 id="sec-45">3.4.5 RayTrace to Hall C starting at 62 MeV:
            RyanB</h4>
          <ul>
            <li><span class="todo">TODO</span> Check Ryan's availability
              for measurement, analysis<br>
            </li>
          </ul>
        </div>
        <div class="outline-4">
          <h4 id="sec-46">3.4.6 Other items based on initial strategic
            priority suggestions</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-47">3.5 APEL Hall Liason Comments</h3>
        <div class="outline-4">
          <h4 id="sec-48">3.5.1 Hall A: Yves (on travel)</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-49">3.5.2 Hall B: Tief</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-50">3.5.3 Hall C: Jay</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-51">3.6 AOB?</h3>
        <div class="outline-4">
          <h4 id="sec-52">3.6.1 <span class="todo">TODO</span> Injector
            configuration documentation: Reza</h4>
          <p>Document proper operational injector configuration (6.3 MeV
            energy,
            crested within 5 degrees, etc): Reza et al
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-53">3.7 fopt tonight, analyze and evaluate match</h3>
        <p>-1430 Reza done
          1430 Backphase bunch length
          1800 Fix fopt bpm setting, fopt measurement => CS
          Use appropriate correctors
          Install 1s, 1A, 1R optics from Arne
          Check another fopt, decide which 1s, 1a, 1r optics to use
          Raytrace (data acquisition, not online analysis)
          2300ish
        </p>
      </div>
    </div>
    <div id="postamble">
      <p class="author"> Author: Todd Satogata
        <a href="mailto:satogata@Todd-Satogatas-MacBook-Pro.local"><satogata@Todd-Satogatas-MacBook-Pro.local></a>
      </p>
      <p class="date"> Date: 2011/03/16 13:06:03</p>
    </div>
  </body>
</html>