<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
  </head>
  <body>
    <title>BTeam-2011-04-06</title>
    <meta http-equiv="Content-Type" content="text/html;
      charset=ISO-8859-1">
    <meta name="generator" content="Org-mode">
    <meta name="generated" content="2011/04/06 10:51:39">
    <meta name="author" content="Todd Satogata">
    <style type="text/css">
  html {
        font-family: Times, serif;
        font-size: 12pt;
  }
  .title { text-align: center; }
  .todo  { color: red; }
  .done { color: green; }
  .timestamp { color: grey }
  .timestamp-kwd { color: CadetBlue }
  .tag { background-color:lightblue; font-weight:normal }
  .target { background-color: lavender; }
  pre {
        border: 1pt solid #AEBDCC;
        background-color: #F3F5F7;
        padding: 5pt;
        font-family: courier, monospace;
  }
  table { border-collapse: collapse; }
  td, th {
        vertical-align: top;
        <!--border: 1pt solid #ADB9CC;-->
  }
</style>Colleagues,<br>
    <br>
    Here is the BTeam meeting agenda for this afternoon. We will meet at
    2 PM after the<br>
    scheduling meeting in the MCC conference room. See you there!<br>
    <br>
    -Todd<br>
    <br>
    <h1 class="title">BTeam-2011-04-06</h1>
    <div class="outline-2">
      <h2 id="sec-1">1 5.5 weeks remaining before 6-month SAD (pending
        firm budget)</h2>
      <p>We have ~1mo of carryover in the event of a (likely) government
        shutdown. There will probably be a slew of people burning
        vacation
        over the summer.
      </p>
    </div>
    <div class="outline-2">
      <h2 id="sec-2">2 2011-03-30 Wed 14:00 BTeam Meeting Minutes</h2>
      <div class="outline-3">
        <h3 id="sec-3">2.1 Call for Strategic Priorities for BTeam</h3>
        <p>Todd is soliciting input on priorities for studies before the
          6
          month SAD, emphasizing strategy rather than tactics. Items
          currently on the list include:
        </p>
        <div class="outline-4">
          <h4 id="sec-4">2.1.1 Support of current experiments</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-5">2.1.2 CEBAF baseline</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-6">2.1.3 Additional bunchlength measurement,
            optimization</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-7">2.1.4 ORFP/Troubleshooting Guide Update </h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-8">2.1.5 Pathlength Correction with MO</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-9">2.1.6 LOCO/RayTrace data, improvements</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-10">2.1.7 Optics machine/model improvements</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-11">2.1.8 Mott polarimeter precision</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-12">2.2 Optics-on-Call Report: Shahid/Geoff =>
          Alicia(Balsa)/Reza</h3>
        <p>Overall operations seems to be running well, with parity
          quality readbacks
          for QWeak within specifications.
        </p>
      </div>
      <div class="outline-3">
        <h3 id="sec-13">2.3 Beam Studies Report</h3>
        <div class="outline-4">
          <h4 id="sec-14">2.3.1 <span class="done">DONE</span> Measure
            6T Kicker response vs. frequency: Mike Spata</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11002">ATLis
              11002</a>: Done Tue 2011-04-05 <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1577817">e1577817</a>.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-15">2.3.2 <span class="done">DONE</span>
            LOCO/Ray-Trace optics tests: Yves, Ryan, Tief</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10708">ATLis
              10708</a>: Continued optics evaluation of machine,
            particularly Arc7.
            Done Tue 2011-04-05 <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1577866">e1577866</a>,
            included LOCO measurements and various
            RayTrace measurements from Ryan.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-16">2.3.3 <span class="done">DONE</span>
            Adjustment of MAT0L07H to steer around MBF0L07: Jay</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11031">ATLis
              11031</a>: Completed with readback issues 2011-04-02 <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1577427">e1577427</a>.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-17">2.3.4 Outstanding ToDo items from previous
            beam studies</h4>
          <ul>
            <li><span class="todo">TODO</span> Review/establish planned
              12 GeV optics match procedures in<br>
              spreaders/recombiners.
            </li>
            <li><span class="todo">TODO</span> CASA review (Yves? Tief?)
              of Arc1/Arc2 data from <a
                href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1572645">e1572645</a>.
              Done again Mar 11.<br>
            </li>
            <li><span class="todo">TODO</span> Discuss impact of inj
              fopt correctors, cost/benefit of replacement<br>
              Jay to work with Ron on developing the AtLis for making
              this change during the summer.
            </li>
            <li><span class="todo">TODO</span> Revisit <a
                href="http://cebaf.jlab.org/atlis/task/8346">ATLis 8346</a>,
              PZT if parity quality deems this necessary<br>
            </li>
          </ul>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-18">2.4 Beam Studies Planning</h3>
        <div class="outline-4">
          <h4 id="sec-19">2.4.1 Continue 70 MHz MO Test Plan <a
              href="http://cebaf.jlab.org/atlis/task/11002">AtLis 11002</a>
            (?) (Curt and Tomasz)</h4>
          <p>Earlier work was sufficent to lower the 60 Hz peaks by a
            factor ten. </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-20">2.4.2 Low-current BPM test: John Musson</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10890">ATLis
              10890</a> Check dynamic range of BCM/BPMs from 50-200 nA
            with
            good accuracy at Qweak helicity flip rate for g2p, Hall A.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-21">2.4.3 Measuring 0L03/0L04 and capture/quarter
            transport: Yves</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/9621">ATLis 9621</a>
            and <a href="http://cebaf.jlab.org/atlis/task/9622">ATLis
              9622</a>: Not needed unless Hall C parity quality does not
            meet
            specification. Brad reports that the beam is presently
            within specification.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-22">2.4.4 Setup Inejctor for High Current (Yan and
            Jay)</h4>
          <p>Deferred until after April 18 when Hall A ramps up to 60 uA
            while Hall C at 150 uA. </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-23">2.5 APEL Hall Liason Comments</h3>
        <div class="outline-4">
          <h4 id="sec-24">2.5.1 Hall A: Yves</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-25">2.5.2 Hall B: Tief</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-26">2.5.3 Hall C: Jay</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-27">2.6 AOB?</h3>
        <div class="outline-4">
          <h4 id="sec-28">2.6.1 <span class="todo">TODO</span> Injector
            configuration documentation: Reza</h4>
          <p>Document proper operational injector configuration (6.3 MeV
            energy,
            crested within 5 degrees, etc): Reza et al (PAC paper in
            progress!)
          </p>
        </div>
      </div>
    </div>
    <div id="postamble">
      <p class="author"> Author: Todd Satogata
        <a href="mailto:satogata@Todd-Satogatas-MacBook-Pro.local"><satogata@Todd-Satogatas-MacBook-Pro.local></a>
      </p>
      <p class="date"> Date: 2011/04/06 10:51:39</p>
    </div>
  </body>
</html>