<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
  </head>
  <body>
    <title>BTeam-2011-04-13</title>
    <meta http-equiv="Content-Type" content="text/html;
      charset=ISO-8859-1">
    <meta name="generator" content="Org-mode">
    <meta name="generated" content="2011/04/13 10:04:49">
    <meta name="author" content="Todd Satogata">
    <style type="text/css">
  html {
        font-family: Times, serif;
        font-size: 12pt;
  }
  .title { text-align: center; }
  .todo  { color: red; }
  .done { color: green; }
  .timestamp { color: grey }
  .timestamp-kwd { color: CadetBlue }
  .tag { background-color:lightblue; font-weight:normal }
  .target { background-color: lavender; }
  pre {
        border: 1pt solid #AEBDCC;
        background-color: #F3F5F7;
        padding: 5pt;
        font-family: courier, monospace;
  }
  table { border-collapse: collapse; }
  td, th {
        vertical-align: top;
        <!--border: 1pt solid #ADB9CC;-->
  }
</style>Colleagues,<br>
    <br>
    Here are the BTeam Meeting agenda for this afternoon and notes from
    last week. As usual,<br>
    we'll meet at 2 PM after the scheduling meeting in the MCC
    conference room. With limited<br>
    time remaining, let's work to use our studies time productively and
    address some of the<br>
    remaining strategic considerations. In particular, I'll be pushing
    for Joe to get some time to<br>
    work on improvements in Mott Polarimetry starting next Thursday,
    2011-04-21. We will<br>
    also discuss current issues with QWeak Compton backgrounds and plans
    for high-current<br>
    two-hall run setup. See you there!<br>
    <br>
    -Todd<br>
    <h1 class="title">BTeam-2011-04-13</h1>
    <div class="outline-2">
      <h2 id="sec-1">1 4.5 weeks remaining before 6-month SAD (pending
        firm budget!!)</h2>
    </div>
    <div class="outline-2">
      <h2 id="sec-2">2 2011-04-13 Wed 14:00 BTeam Meeting Agenda</h2>
      <div class="outline-3">
        <h3 id="sec-3">2.1 Strategic Priorities for BTeam</h3>
        <div class="outline-4">
          <h4 id="sec-4">2.1.1 <span class="done">DONE</span> Support
            of current experiments</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-5">2.1.2 <span class="todo">TODO</span> CEBAF
            baseline</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-6">2.1.3 <span class="todo">TODO</span> Mott
            polarimeter precision</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-7">2.1.4 <span class="todo">TODO</span>
            ORFP/Troubleshooting Guide Update </h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-8">2.1.5 <span class="todo">TODO</span>
            Pathlength Correction with MO</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-9">2.1.6 <span class="done">DONE</span>
            LOCO/RayTrace data, improvements</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-10">2.1.7 <span class="done">DONE</span> Optics
            machine/model improvements</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-11">2.1.8 <span class="done">DONE</span>
            Additional bunchlength measurement, optimization</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-12">2.2 Optics-on-Call Report: Shahid/Geoff =>
          Alicia(Balsa)/Reza</h3>
        <p>Overall operations seems to be running well, with parity
          quality readbacks
          for QWeak within specifications. We continue to have injector
          drift problems,
          partly handled by tweaking prebuncher phase (<a
            href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1578474">e1578474</a>
          and <a
            href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1578658">e1578658</a>)
          and partly
          by injector autosteering at least once/shift (<a
            href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1578581">e1578581</a>).
          There was also a
          tweak of 0R03-6 PASK to handle some 0R04 BLM trips (<a
            href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1578586">e1578586)</a>.
          Some time was
          given up last week to cathode reactivation on 2011-04-07.
        </p>
      </div>
      <div class="outline-3">
        <h3 id="sec-13">2.3 Beam Studies Report</h3>
        <div class="outline-4">
          <h4 id="sec-14">2.3.1 <span class="todo">TODO</span>
            Stripline BPM IPM1L27C electronics: Musson/Keith Cole/Trent
            Allison (~1h)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11025">ATLis
              11025</a> Partly done Wed 2011-04-06 <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1578039">e1578039</a>.
            Collected about half the
            required data. Still need to test low current (~10nA),
            single-pass beam to
            BSY, stripline with new electronics to establish low-current
            threshold.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-15">2.3.2 <span class="done">DONE</span>
            LOCO/RayTrace optics tests: Yves, Ryan, Tief</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10708">ATLis
              10708</a>: Continued optics evaluation of machine,
            particularly Arc7.
            Done Tue 2011-04-05 <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1577866">e1577866</a>,
            included LOCO measurements and various
            RayTrace measurements from Ryan. Two RayTrace sets, one
            baseline and one
            in support of LOCO, measuring with various quad settings
            early in transport.
            Some occasional beam loss problems. Yves is presently
            analyzing data for LOCO;
            Ryan is presently analyzing data for RayTrace.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-16">2.3.3 <span class="todo">TODO</span> Measure
            6T Kicker response vs. frequency: Mike Spata</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11002">ATLis
              11002</a>: Done Tue 2011-04-05 <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1577817">e1577817</a>.
            Made 4 magnets, installed in 6T,
            observed previous gain problem was on boards; retested after
            fix, good out
            to at least 250 Hz. Will be ready for another beam study
            earliest
            2011-04-19 Tue.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-17">2.4 Beam Studies Planning</h3>
        <div class="outline-4">
          <h4 id="sec-18">2.4.1 <span class="todo">TODO</span> Inj High
            Current HA/HC: Jay/Yan (~4h)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11066">ATLis
              11066</a>: Likely planned for Thu 2011-04-14 0830-1230.
            PSS/MPS already
            setup up per <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1576974">e1576974</a>.
            Program driven, so will need to return to this Friday
            if not handled on Thursday. Spot move frequencies will
            increase with higher
            gun current draw.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-19">2.4.2 <span class="todo">TODO</span>
            Stripline BPM IPM1L27C electronics: Musson/Keith Cole/Trent
            Allison (~1h)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11025">ATLis
              11025</a> Complete on Tue 2011-04-19. Still need to test
            low current
            (~10nA), single-pass beam to BSY, stripline with new
            electronics to establish
            low-current threshold.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-20">2.4.3 <span class="todo">TODO</span> Measure
            6T Kicker response vs. frequency: Mike Spata (?)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11002">ATLis
              11002</a>: Will be ready for another beam study earliest
            2011-04-19 Tue
            to complete this work.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-21">2.4.4 <span class="todo">TODO</span> Mott TOF
            detection technique development: Matt/Joe (8h)</h4>
          <p>(No ATLis yet?) Potentially Thu 2011-04-21.
            Hardware-oriented, strategic work
            to develop improved Mott polarization measurements with
            reduced backgrounds.
            Matt and Joe will make their case at BTeam.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-22">2.4.5 Outstanding/Tabled ToDo items from
            previous beam studies</h4>
          <ul>
            <li>Review/establish planned 12 GeV optics match procedures
              in spreaders/recombiners.<br>
            </li>
            <li>CASA review (Yves? Tief?) of Arc1/Arc2 data from <a
                href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1572645">e1572645</a>.
              Done again Mar 11.<br>
            </li>
            <li>Discuss impact of inj fopt correctors, cost/benefit of
              replacement<br>
              Jay to work with Ron on developing the ATLis for making
              this change during the summer.
            </li>
            <li>Revisit <a href="http://cebaf.jlab.org/atlis/task/8346">ATLis
                8346</a>, PZT if parity quality deems this necessary<br>
            </li>
            <li>Measuring 0L03/0L04 and capture/quarter transport: Yves<br>
              <a href="http://cebaf.jlab.org/atlis/task/9621">ATLis 9621</a>
              and <a href="http://cebaf.jlab.org/atlis/task/9622">ATLis
                9622</a>: Not needed unless Hall C parity quality does
              not meet
              specification. Brad reports that the beam is presently
              within specification.
              QWeak also has DAQ problems in front end that also need to
              be resolved.
            </li>
          </ul>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-23">2.5 APEL Hall Liason Comments</h3>
        <div class="outline-4">
          <h4 id="sec-24">2.5.1 Hall A: Yves</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-25">2.5.2 Hall B: Tief</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-26">2.5.3 Hall C: Jay</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-27">2.6 AOB?</h3>
        <div class="outline-4">
          <h4 id="sec-28">2.6.1 <span class="todo">TODO</span> Injector
            configuration documentation: Reza</h4>
          <p>Document proper operational injector configuration (6.3 MeV
            energy,
            crested within 5 degrees, etc): Reza et al (in log; will be
            in tech note)
          </p>
          <p>
            ======================================================================
BTeam
            Meeting Notes 2010-04-06
          </p>
        </div>
      </div>
    </div>
    <div class="outline-2">
      <h2 id="sec-29">3 5.5 weeks remaining before 6-month SAD (pending
        firm budget)</h2>
      <p>We have ~1mo of carryover in the event of a (likely?)
        government
        shutdown. There will probably be a slew of people burning
        vacation
        over the summer.
      </p>
    </div>
    <div class="outline-2">
      <h2 id="sec-30">4 2011-04-06 Wed 14:00 BTeam Meeting Agenda</h2>
      <div class="outline-3">
        <h3 id="sec-31">4.1 Discussion of cathode heat/activate,
          maintenance Thu 2011-04-07</h3>
        <p>Conclude that 8h heat/activate, maintenance will occur on
          Thursday.
          BTeam reserves ability to recover some of this time at later
          point.
          If studies are run on Fri 2011-04-08, they should not end up
          with a
          new machine setup for weekend since experiments are happy and
          looking
          for steady high-current operation at present.
        </p>
      </div>
      <div class="outline-3">
        <h3 id="sec-32">4.2 Call for Strategic Priorities for BTeam</h3>
        <p>Todd is soliciting input on priorities for studies before the
          6
          month SAD, emphasizing strategy rather than tactics. Items
          currently on the list include:
        </p>
        <div class="outline-4">
          <h4 id="sec-33">4.2.1 Support of current experiments</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-34">4.2.2 CEBAF baseline</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-35">4.2.3 Additional bunchlength measurement,
            optimization</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-36">4.2.4 ORFP/Troubleshooting Guide Update </h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-37">4.2.5 Pathlength Correction with MO</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-38">4.2.6 LOCO/RayTrace data, improvements</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-39">4.2.7 Optics machine/model improvements</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-40">4.2.8 Mott polarimeter precision</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-41">4.3 Optics-on-Call Report: Shahid/Geoff =>
          Alicia(Balsa)/Reza</h3>
        <p>Overall operations seems to be running well, with parity
          quality readbacks
          for QWeak within specifications. Does pager work? Page sent
          and not received.
        </p>
      </div>
      <div class="outline-3">
        <h3 id="sec-42">4.4 Beam Studies Report</h3>
        <div class="outline-4">
          <h4 id="sec-43">4.4.1 <span class="done">DONE</span> Measure
            6T Kicker response vs. frequency: Mike Spata</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11002">ATLis
              11002</a>: Done Tue 2011-04-05 <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1577817">e1577817</a>.
            Made 4 magnets, installed in 6T,
            observed previous gain problem was on boards; retested after
            fix, good out
            to at least 250 Hz. Will be ready for another beam study
            earliest
            2011-04-19 Tue.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-44">4.4.2 <span class="done">DONE</span>
            LOCO/RayTrace optics tests: Yves, Ryan, Tief</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10708">ATLis
              10708</a>: Continued optics evaluation of machine,
            particularly Arc7.
            Done Tue 2011-04-05 <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1577866">e1577866</a>,
            included LOCO measurements and various
            RayTrace measurements from Ryan. Two RayTrace sets, one
            baseline and one
            in support of LOCO, measuring with various quad settings
            early in transport.
            Some occasional beam loss problems. Yves is presently
            analyzing data for LOCO.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-45">4.4.3 <span class="done">DONE</span>
            Adjustment of MAT0L07H to steer around MBF0L07: Jay</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11031">ATLis
              11031</a>: Completed with readback issues 2011-04-02 <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1577427">e1577427</a>.
            Spectrometer
            magnet failed a couple of times over the weekend, so this
            was bucked with a
            local corrector. Per elog, readback is 1/10 of setting, not
            understood but can
            run like this for now. Ron mentions that we could replace
            this supply within 1h,
            as it's run on the bench flawlessly for 2d.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-46">4.4.4 Low-current BPM test: John Musson</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10890">ATLis
              10890</a> Check dynamic range of BCM/BPMs from 50-200 nA
            with
            good accuracy at Qweak helicity flip rate for g2p, Hall A.
            Attempted 2011-04-05
            yesterday but had some problems with low current beam. Will
            consult with Musson
            to evaluate status and reschedule.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-47">4.4.5 dp/p in chicane is unusually large (per
            comment from Mike Spata); do we fix this?</h4>
          <p>Jay thinks we shouldn't, Yves thinks we should. This is a
            few percent, which is
            unusually large. Last few slugs are dead on, so there's
            little incentive to touch
            this at present.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-48">4.4.6 Outstanding ToDo items from previous
            beam studies</h4>
          <ul>
            <li><span class="todo">TODO</span> Review/establish planned
              12 GeV optics match procedures in<br>
              spreaders/recombiners.
            </li>
            <li><span class="todo">TODO</span> CASA review (Yves? Tief?)
              of Arc1/Arc2 data from <a
                href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1572645">e1572645</a>.
              Done again Mar 11.<br>
            </li>
            <li><span class="todo">TODO</span> Discuss impact of inj
              fopt correctors, cost/benefit of replacement<br>
              Jay to work with Ron on developing the AtLis for making
              this change during the summer.
            </li>
            <li><span class="todo">TODO</span> Revisit <a
                href="http://cebaf.jlab.org/atlis/task/8346">ATLis 8346</a>,
              PZT if parity quality deems this necessary<br>
            </li>
          </ul>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-49">4.5 Beam Studies Planning</h3>
        <div class="outline-4">
          <h4 id="sec-50">4.5.1 Continue 70 MHz MO Test Plan <a
              href="http://cebaf.jlab.org/atlis/task/11002">AtLis 11002</a>
            (?) (Curt and Tomasz)</h4>
          <p>Earlier work was sufficent to lower the 60 Hz peaks by a
            factor ten. </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-51">4.5.2 Measuring 0L03/0L04 and capture/quarter
            transport: Yves</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/9621">ATLis 9621</a>
            and <a href="http://cebaf.jlab.org/atlis/task/9622">ATLis
              9622</a>: Not needed unless Hall C parity quality does not
            meet
            specification. Brad reports that the beam is presently
            within specification.
            QWeak also has DAQ problems in front end that also need to
            be resolved.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-52">4.5.3 Setup Inejctor for High Current (Yan and
            Jay)</h4>
          <p>Deferred until after April 18 when Hall A ramps up to 60 uA
            while Hall C at 150 uA. </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-53">4.5.4 Hall B Multiharp: Jay</h4>
          <p>Wants to set up 2nd pass to HB and take multiharp before
            HDIce comes online.
            Is this really setup time? Also evaluate/discuss other
            multiharp data in BTeam
            log.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-54">4.6 APEL Hall Liason Comments</h3>
        <div class="outline-4">
          <h4 id="sec-55">4.6.1 Hall A: Yves</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-56">4.6.2 Hall B: Tief</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-57">4.6.3 Hall C: Jay</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-58">4.7 AOB?</h3>
        <div class="outline-4">
          <h4 id="sec-59">4.7.1 <span class="todo">TODO</span> Injector
            configuration documentation: Reza</h4>
          <p>Document proper operational injector configuration (6.3 MeV
            energy,
            crested within 5 degrees, etc): Reza et al (in log; will be
            in tech note)
          </p>
        </div>
      </div>
    </div>
    <div id="postamble">
      <p class="author"> Author: Todd Satogata
        <a href="mailto:satogata@Todd-Satogatas-MacBook-Pro.local"><satogata@Todd-Satogatas-MacBook-Pro.local></a>
      </p>
      <p class="date"> Date: 2011/04/13 10:04:49</p>
    </div>
  </body>
</html>