<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
  </head>
  <body>
    <title>BTeam-2011-04-27</title>
    <meta http-equiv="Content-Type" content="text/html;
      charset=ISO-8859-1">
    <meta name="generator" content="Org-mode">
    <meta name="generated" content="2011/04/27 13:21:29">
    <meta name="author" content="Todd Satogata">
    <style type="text/css">
  html {
        font-family: Times, serif;
        font-size: 12pt;
  }
  .title { text-align: center; }
  .todo  { color: red; }
  .done { color: green; }
  .timestamp { color: grey }
  .timestamp-kwd { color: CadetBlue }
  .tag { background-color:lightblue; font-weight:normal }
  .target { background-color: lavender; }
  pre {
        border: 1pt solid #AEBDCC;
        background-color: #F3F5F7;
        padding: 5pt;
        font-family: courier, monospace;
  }
  table { border-collapse: collapse; }
  td, th {
        vertical-align: top;
        <!--border: 1pt solid #ADB9CC;-->
  }
</style>
    <h1 class="title">BTeam-2011-04-27</h1>
    <div class="outline-2">
      <h2 id="sec-1">1 2.5 weeks (?) remaining before 6-month SAD</h2>
    </div>
    <div class="outline-2">
      <h2 id="sec-2">2 Shifting towards strategic planning, reports;
        planning for 6-month SAD recovery</h2>
    </div>
    <div class="outline-2">
      <h2 id="sec-3">3 2011-04-20 Wed 14:00 BTeam Meeting Agenda</h2>
      <div class="outline-3">
        <h3 id="sec-4">3.1 Strategic Priorities for BTeam</h3>
        <div class="outline-4">
          <h4 id="sec-5">3.1.1 <span class="todo">TODO</span> Mott
            polarimeter precision (in progress)</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-6">3.1.2 <span class="todo">TODO</span>
            ORFP/Troubleshooting Guide Update </h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-7">3.1.3 <span class="todo">TODO</span>
            Pathlength Correction with MO (in progress)</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-8">3.1.4 <span class="done">DONE</span> CEBAF
            baseline</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-9">3.1.5 <span class="done">DONE</span>
            LOCO/RayTrace data, improvements</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-10">3.1.6 <span class="done">DONE</span> Optics
            machine/model improvements</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-11">3.1.7 <span class="done">DONE</span>
            Additional bunchlength measurement, optimization</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-12">3.1.8 <span class="done">DONE</span> Support
            of current experiments</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-13">3.2 Optics-on-Call Report: Rui/MikeS =>
          Yuhong/Tief</h3>
      </div>
      <div class="outline-3">
        <h3 id="sec-14">3.3 Updates</h3>
        <ul>
          <li><span class="todo">TODO</span> Generate specs for golden
            zero rels (perhaps not just injector), while not<br>
            too overly complicating the matter; involve MattB/controls
            in discussion. This
            also may include configuration of which beam is used. Mike
            McCaughan will be
            sending out a request for comments/input.
          </li>
          <li><span class="todo">TODO</span> 0R04 diagnostic BLM is
            installed but apparently not working; repair<br>
          </li>
        </ul>
      </div>
      <div class="outline-3">
        <h3 id="sec-15">3.4 Beam Studies Report</h3>
        <div class="outline-4">
          <h4 id="sec-16">3.4.1 <span class="done">DONE</span> Measure
            6T Kicker response vs. frequency III: Mike Spata (6h)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11002">ATLis
              11002</a>: Measured four magnets Thu 2011-04-14 <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1579268">e1579268</a>
            out to 120 Hz
            with new trim cards. Prepared for beam studies Tue
            2011-04-19 (deferred due to
            maintenance/repair). Ready to go Thu 2011-04-21. Power dip
            that day, but
            resolved and mostly completed. <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1580544">e1580544</a>,
            <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1580690">e1580690</a>.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-17">3.4.2 <span class="done">DONE</span> (Arc4/6)
            LOCO/RayTrace optics tests: Yves, Ryan, Tief</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10708">ATLis
              10708</a>: Continued optics evaluation of machine,
            particularly Arc7.
            Done Tue 2011-04-05 <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1577866">e1577866</a>,
            included LOCO measurements and various
            RayTrace measurements from Ryan. Two RayTrace sets, one
            baseline and one
            in support of LOCO, measuring with various quad settings
            early in transport.
            Some occasional beam loss problems. Yves is presently
            analyzing data for LOCO;
            Ryan is presently analyzing data for RayTrace. Acquired data
            Tue 2011-04-26
            for Arc 4/6 baseline before 6 month SAD H-steel magnet
            retrofit.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-18">3.5 Beam Studies Planning</h3>
        <div class="outline-4">
          <h4 id="sec-19">3.5.1 <span class="todo">TODO</span> Improved
            bunch length measurements with HV gun: Reza (4h)</h4>
          <p>(No ATLis yet): ~2h in injector to test new settings for
            bunch length measurement
            tool at 130 kV. If this works, we'll have a reliable bunch
            length tool for
            October startup. Planned from last week for Thu 2011-04-28
            in conjunction with
            2L22A DP React.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-20">3.5.2 <span class="todo">TODO</span> Mott TOF
            detection technique/BFM development: Matt/Joe/Musson (4h+)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11042">ATLis
              11042</a>: Should be ready for Tue 2011-05-03 after
            channel repair.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-21">3.5.3 <span class="todo">TODO</span> RF
            System Power Demand/LEM: Jay (1h)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11027">ATLis
              11027</a>: Should be ready for Tue 2011-05-03 assuming
            high current to both
            halls A/C. May be in conflict with potential HDIce/Hall B
            startup.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-22">3.5.4 <span class="todo">TODO</span> Measure
            6T Kicker response vs. frequency IV: Mike Spata (4h)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11123">ATLis
              11123</a>: Recovers some data corrupted due to power
            issues in earlier study.
            Suggested for Thu 2011-05-05 (Happy Cinco de Mayo!). Still
            consistent with setup?
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-23">3.5.5 <span class="todo">TODO</span>
            Stripline BPM IPM1L27C electronics: Musson/Keith Cole/Trent
            Allison (~2h)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11025">ATLis
              11025</a>: Bumped to Thu 2011-05-05. Need to test low
            current (~10nA),
            single-pass beam to BSY, stripline with new electronics to
            establish low-current
            threshold.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-24">3.6 6 Month SAD Items: Next Week</h3>
        <div class="outline-4">
          <h4 id="sec-25">3.6.1 C100 BBU/low energy/Hall C:
            Todd/Shahid/Ilkyoung</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-26">3.6.2 Injector zero rels management: Mike
            McCaughin</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-27">3.7 6 Month SAD Items: This Week</h3>
        <div class="outline-4">
          <h4 id="sec-28">3.7.1 Frequency-agile MO (FRAGMO) test
            plan/considerations: Tief</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11122">ATLis
              11122</a>: Remote frequency control of MO restored Tue
            2011-04-26.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-29">3.7.2 CED update: Michele</h4>
          <p>
            ======================================================================
BTeam
            Meeting Notes Agenda 2010-04-20
          </p>
        </div>
      </div>
    </div>
    <div class="outline-2">
      <h2 id="sec-30">4 3.5 weeks (?) remaining before 6-month SAD
        (pending firm budget!!)</h2>
    </div>
    <div class="outline-2">
      <h2 id="sec-31">5 Shifting towards strategic planning, reports;
        planning for 6-month SAD recovery</h2>
    </div>
    <div class="outline-2">
      <h2 id="sec-32">6 2011-04-20 Wed 14:00 BTeam Meeting Agenda</h2>
      <div class="outline-3">
        <h3 id="sec-33">6.1 Strategic Priorities for BTeam</h3>
        <div class="outline-4">
          <h4 id="sec-34">6.1.1 <span class="todo">TODO</span> CEBAF
            baseline</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-35">6.1.2 <span class="todo">TODO</span> Mott
            polarimeter precision</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-36">6.1.3 <span class="todo">TODO</span>
            ORFP/Troubleshooting Guide Update </h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-37">6.1.4 <span class="todo">TODO</span>
            Pathlength Correction with MO</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-38">6.1.5 <span class="done">DONE</span>
            LOCO/RayTrace data, improvements</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-39">6.1.6 <span class="done">DONE</span> Optics
            machine/model improvements</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-40">6.1.7 <span class="done">DONE</span>
            Additional bunchlength measurement, optimization</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-41">6.1.8 <span class="done">DONE</span> Support
            of current experiments</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-42">6.2 Optics-on-Call Report: Todd/Jay =>
          Rui/MikeS</h3>
        <p>Ops went to the highest polarized current out of CEBAF yet on
          Day Thu 2011-04-14,
          >260 uA (>160 uA Hall C, >90 uA Hall A), and seemed
          to run well that way until Hall C
          vacuum problems and storm/power issues. Is injector stability
          still an issue? It
          seems that injector steering is still the most sensitive knob,
          and that prebuncher
          phase adjustments are falling out of favor. 0R04 trips seem to
          be limiting; Clyde
          and Jay have an <a
            href="http://cebaf.jlab.org/atlis/task/11084">ATLis 11084</a>
          to investigate injector RF loading at the high current.
        </p>
        <p>
          Geoff notes that >300 uA was run out of the injector for 1d
          "years and years ago".
        </p>
        <p>
          There are some open questions in email about injector orbit
          management between running
          a single hall or both halls. See Jay's BTeam email for
          details, particularly noting
          a difference between Hall A/C beams at the BPM near A2. Joe
          notes that mirror for
          the parity violation experiment is disconnected (e.g. was A
          for PREX, C for QWeak).
          Matt notes a mystery: Hall A QE was reading mysteriously high
          again (similar to an
          incident where the table was hypothetically bumped months
          ago), but was realigned
          on Tuesday 2011-04-19 to realign relative to Halls B/C.
        </p>
        <p>
          Arne: How do we know which is the golden injector zero rels?
          (e.g. from Joe or Reza).
          Guidance to operations depends on what makes sense according
          to Joe, but usually this
          is injector rels, which operations tries to avoid saving.
          There still seems to be a
          need/desire for golden injector zero rels.
        </p>
        <ul>
          <li><span class="todo">TODO</span> Generate specs for golden
            zero rels (perhaps not just injector), while not<br>
            too overly complicating the matter; involve MattB/controls
            in discussion. This
            also may include configuration of which beam is used.
            <p>
              0R04 diagnostic BLM is installed; there is ongoing work to
              determine whether it's
              calibrated properly/believeable.
            </p>
          </li>
        </ul>
      </div>
      <div class="outline-3">
        <h3 id="sec-43">6.3 Beam Studies Report</h3>
        <div class="outline-4">
          <h4 id="sec-44">6.3.1 <span class="todo">TODO</span> Mott TOF
            detection technique/BFM development: Matt/Joe/Musson</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11042">ATLis
              11042</a> Partly done Wed 2011-04-13 ~6h <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1579039">e1579039</a>,
            <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1579056">e1579056</a>,
            <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1579070">e1579070</a>,
            <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1579090">e1579090</a>
            with summary at <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1579092">e1579092</a>.
            Installed new BFM chassis on Hall C laser, started
            reconfiguring Mott DAQ. Some bad electronics channels need
            repair, so will want
            ~2h later for polarization measurements. Some after-effects
            on Hall C laser
            required removal of the BFM. This is the second BFM – made
            really good beat
            beam with low timing jitter, but also introduced
            unacceptable noise on the laser.
            Will have to pay end effects of installing BFM, measuring,
            then removing again
            until this problem is resolved. Joe has since repaired these
            channels and might
            be ready mid-day Thu 2011-04-21.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-45">6.3.2 <span class="todo">TODO</span> Measure
            6T Kicker response vs. frequency: Mike Spata (6h)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11002">ATLis
              11002</a>: Measured four magnets Thu 2011-04-14 <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1579268">e1579268</a>
            out to 120 Hz
            with new trim cards. Prepared for beam studies Tue
            2011-04-19 (deferred due to
            maintenance/repair). Ready to go Thu 2011-04-21.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-46">6.3.3 <span class="todo">TODO</span>
            Stripline BPM IPM1L27C electronics: Musson/Keith Cole/Trent
            Allison (~1h)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11025">ATLis
              11025</a> Partly done Wed 2011-04-06 <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1578039">e1578039</a>.
            Collected about half the
            required data. Still need to test low current (~10nA),
            single-pass beam to
            BSY, stripline with new electronics to establish low-current
            threshold.
            Was scheduled Tue 2011-04-21 (deferred due to
            maintenance/repair).
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-47">6.3.4 <span class="done">DONE</span> (Arc7)
            LOCO/RayTrace optics tests: Yves, Ryan, Tief</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10708">ATLis
              10708</a>: Continued optics evaluation of machine,
            particularly Arc7.
            Done Tue 2011-04-05 <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1577866">e1577866</a>,
            included LOCO measurements and various
            RayTrace measurements from Ryan. Two RayTrace sets, one
            baseline and one
            in support of LOCO, measuring with various quad settings
            early in transport.
            Some occasional beam loss problems. Yves is presently
            analyzing data for LOCO;
            Ryan is presently analyzing data for RayTrace.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-48">6.4 Beam Studies Planning</h3>
        <div class="outline-4">
          <h4 id="sec-49">6.4.1 Hall A cooling down on Thu 2011-04-21;
            status of Hall C Moeller?</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-50">6.4.2 <span class="todo">TODO</span> Measure
            6T Kicker response vs. frequency: Mike Spata</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11002">ATLis
              11002</a>: Bumped to Thu 2011-04-23 (~6h).
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-51">6.4.3 <span class="todo">TODO</span>
            Stripline BPM IPM1L27C electronics: Musson/Keith Cole/Trent
            Allison (~2h)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11025">ATLis
              11025</a>: Bumped to Thu 2011-04-23. Need to test low
            current (~10nA),
            single-pass beam to BSY, stripline with new electronics to
            establish low-current
            threshold.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-52">6.4.4 <span class="todo">TODO</span> Mott TOF
            detection technique/BFM development: Matt/Joe/Musson (~2-4h)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11042">ATLis
              11042</a> Bumped to Thu 2011-04-21, but conditional on
            channel repair as
            noted in the Mott TOF detection report above. Possibly ready
            as early as
            mid-day Thu 2011-04-21; Joe won't be available next week, so
            we'll bump this
            to 2011-05-03.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-53">6.4.5 <span class="todo">TODO</span>
            LOCO/RayTrace optics tests: Yves, Ryan, Tief (~8h)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10708">ATLis
              10708</a>: Continued optics evaluation of machine,
            including Arc6 which
            will be retrofitted with H-steel over 6 month SAD, so we
            want before/after
            optics transport measurements. Mike Spata recommends
            LOCO/RayTrace for as
            many west arcs as possible before 6 month SAD. We converge
            on data acquisition
            for arcs 6 and 2 (or the best two west arcs) on 2011-04-26;
            each arch should
            take ~4h according to Ryan.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-54">6.4.6 <span class="todo">TODO</span> Improved
            bunch length measurements with HV gun: Reza</h4>
          <p>(No ATLis yet): ~2h in injector to test new settings for
            bunch length measurement
            tool at 130 kV. If this works, we'll have a reliable bunch
            length tool for
            October startup.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-55">6.5 Coming next week</h3>
        <div class="outline-4">
          <h4 id="sec-56">6.5.1 Frequency-agile MO (FRAGMO) test
            plan/considerations: Tief</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-57">6.5.2 CED update: Michele</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-58">6.6 Coming in two weeks</h3>
        <div class="outline-4">
          <h4 id="sec-59">6.6.1 C100 BBU/low energy/Hall C:
            Todd/Shahid/Ilkyoung</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-60">6.6.2 Mike McCaughin: Injector zero rels</h4>
          <p>
            Quad centering
            Dipole refurb
            MikeS: R100 may be going into CEBAF; not going into FEL
            Bug Fulvia about getting in loop on this decision
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-61">6.6.3 Outstanding/Tabled ToDo items from
            previous beam studies</h4>
          <ul>
            <li>Review/establish planned 12 GeV optics match procedures
              in spreaders/recombiners.<br>
            </li>
            <li>CASA review (Yves? Tief?) of Arc1/Arc2 data from <a
                href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1572645">e1572645</a>.
              Done again Mar 11.<br>
            </li>
            <li>Discuss impact of inj fopt correctors, cost/benefit of
              replacement<br>
              Jay to work with Ron on developing the ATLis for making
              this change during the summer.
            </li>
            <li>Revisit <a href="http://cebaf.jlab.org/atlis/task/8346">ATLis
                8346</a>, PZT if parity quality deems this necessary<br>
            </li>
            <li>Measuring 0L03/0L04 and capture/quarter transport: Yves<br>
              <a href="http://cebaf.jlab.org/atlis/task/9621">ATLis 9621</a>
              and <a href="http://cebaf.jlab.org/atlis/task/9622">ATLis
                9622</a>: Not needed unless Hall C parity quality does
              not meet
              specification. Brad reports that the beam is presently
              within specification.
              QWeak also has DAQ problems in front end that also need to
              be resolved.
            </li>
          </ul>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-62">6.7 APEL Hall Liason Comments</h3>
        <div class="outline-4">
          <h4 id="sec-63">6.7.1 Hall A: Yves</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-64">6.7.2 Hall B: Tief</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-65">6.7.3 Hall C: Jay</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-66">6.8 AOB?</h3>
        <div class="outline-4">
          <h4 id="sec-67">6.8.1 <span class="todo">TODO</span> Injector
            configuration documentation: Reza</h4>
          <p>Document proper operational injector configuration (6.3 MeV
            energy,
            crested within 5 degrees, etc): Reza et al (in log; will be
            in tech note)
          </p>
        </div>
      </div>
    </div>
    <div id="postamble">
      <p class="author"> Author: Todd Satogata
        <a href="mailto:satogata@Todd-Satogatas-MacBook-Pro.local"><satogata@Todd-Satogatas-MacBook-Pro.local></a>
      </p>
      <p class="date"> Date: 2011/04/27 13:21:29</p>
    </div>
  </body>
</html>