<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
  </head>
  <body>
    <title>BTeam-2011-05-04</title>
    <meta http-equiv="Content-Type" content="text/html;
      charset=ISO-8859-1">
    <meta name="generator" content="Org-mode">
    <meta name="generated" content="2011/05/02 12:28:19">
    <meta name="author" content="Todd Satogata">
    <style type="text/css">
  html {
        font-family: Times, serif;
        font-size: 12pt;
  }
  .title { text-align: center; }
  .todo  { color: red; }
  .done { color: green; }
  .timestamp { color: grey }
  .timestamp-kwd { color: CadetBlue }
  .tag { background-color:lightblue; font-weight:normal }
  .target { background-color: lavender; }
  pre {
        border: 1pt solid #AEBDCC;
        background-color: #F3F5F7;
        padding: 5pt;
        font-family: courier, monospace;
  }
  table { border-collapse: collapse; }
  td, th {
        vertical-align: top;
        <!--border: 1pt solid #ADB9CC;-->
  }
</style>BTeamers,
    <br>
    <br>
    Here is the agenda for this week's meeting, pending planned Mott and
    low-current stripline BPM
    <br>
    studies tomorrow. I will be out this Tuesday/Wednesday and Mike
    Spata will chair the meeting.
    <br>
    <br>
    -Todd
    <h1 class="title">BTeam-2011-05-04</h1>
    <div class="outline-2">
      <h2 id="sec-1">1 2011-05-04 Wed 14:00 BTeam Meeting Agenda</h2>
      <div class="outline-3">
        <h3 id="sec-2">1.1 Strategic Priorities for BTeam</h3>
        <div class="outline-4">
          <h4 id="sec-3">1.1.1 <span class="todo">TODO</span> Mott
            polarimeter precision (in progress)</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-4">1.1.2 <span class="todo">TODO</span>
            Pathlength Correction with MO (in progress)</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-5">1.1.3 <span class="todo">TODO</span>
            ORFP/Troubleshooting Guide Update</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-6">1.1.4 <span class="done">DONE</span> CEBAF
            baseline</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-7">1.1.5 <span class="done">DONE</span>
            LOCO/RayTrace data, improvements</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-8">1.1.6 <span class="done">DONE</span> Optics
            machine/model improvements</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-9">1.1.7 <span class="done">DONE</span>
            Additional bunchlength measurement, optimization</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-10">1.1.8 <span class="done">DONE</span> Support
            of current experiments</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-11">1.2 Optics-on-Call Report: Yuhong/Tief =>
          Balsa (May 4-7) or Byung/Yves</h3>
        <p>Please note that optics on call should be available at daily
          7:45
          PD meetings in MCC.
        </p>
      </div>
      <div class="outline-3">
        <h3 id="sec-12">1.3 Updates</h3>
        <ul>
          <li><span class="todo">TODO</span> 0R04 diagnostic BLM is
            installed but apparently not working; status?<br>
            Rich Wright reports that they looked again and there was
            some activity.
            Could have been deferred software update. Needs further
            investigation,
            no correlation between 0R04 MPS trips and diagnostic BLM
            readings. Could
            be a busted diode.
          </li>
        </ul>
      </div>
      <div class="outline-3">
        <h3 id="sec-13">1.4 Beam Studies Report</h3>
        <div class="outline-4">
          <h4 id="sec-14">1.4.1 <span class="done">DONE</span> (Arc4/6)
            LOCO/RayTrace optics tests: Yves, Ryan, Tief</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/10708">ATLis
              10708</a>: Continued optics evaluation of machine,
            particularly Arc7.
            Done Tue 2011-04-05 <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1577866">e1577866</a>,
            included LOCO measurements and various
            RayTrace measurements from Ryan. Two RayTrace sets, one
            baseline and one
            in support of LOCO, measuring with various quad settings
            early in transport.
            Some occasional beam loss problems. Yves is presently
            analyzing data for LOCO;
            Ryan is presently analyzing data for RayTrace. Acquired data
            Tue 2011-04-26
            for Arc 4/6 baseline before 6 month SAD H-steel magnet
            retrofit.
          </p>
          <ul>
            <li><span class="todo">TODO</span>: Discuss Arc2 plans with
              Yves, summarize data set<br>
            </li>
          </ul>
        </div>
        <div class="outline-4">
          <h4 id="sec-15">1.4.2 <span class="done">DONE</span> Improved
            bunch length measurements with HV gun: Reza (4h)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11129">ATLis
              11129</a>: ~2h in injector to test new settings for bunch
            length measurement
            tool at 130 kV. If this works, we'll have a reliable bunch
            length tool for
            October startup. Done 2011-04-28. Required some IOC reboots.
            Script
            improved, including prebuncher control and clean backout.
            See <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1609783">e1609783</a>.
            Wien flip also done that day, see <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1609823">e1609823</a>.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-16">1.4.3 <span class="todo">TODO</span> Mott TOF
            detection technique/BFM development: Matt/Joe/Musson (4h+)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11042">ATLis
              11042</a>: Should be ready for Tue 2011-05-03 after
            channel repair.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-17">1.4.4 <span class="todo">TODO</span>
            Stripline BPM IPM1L27C electronics: Musson/Keith Cole/Trent
            Allison (~2h)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11025">ATLis
              11025</a>: Bumped to Thu 2011-05-05. Need to test low
            current (~10nA),
            single-pass beam to BSY, stripline with new electronics to
            establish low-current
            threshold. Musson reports this item is not complete and can
            use a little more
            time. He's available on Tue 2011-05-03 when he is already in
            for BFM above.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-18">1.5 Beam Studies Planning</h3>
        <div class="outline-4">
          <h4 id="sec-19">1.5.1 <span class="todo">TODO</span> Measure
            6T Kicker response vs. frequency IV: Mike Spata (4h)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11123">ATLis
              11123</a>: Recovers some data corrupted due to power
            issues in earlier study.
            Planned for Thu 2011-05-05 (Happy Cinco de Mayo!).
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-20">1.5.2 <span class="todo">TODO</span> RF
            System Power Demand/LEM: Jay (1h)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11027">ATLis
              11027</a>: Requires high current to both halls A/C. May be
            in conflict
            with potential HDIce/Hall B startup. Needs ops clearance.
            High PASKR items
            include injector and 1L11. Will return to economizing at a
            future BTeam.
            Planned for Tue 2011-05-10.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-21">1.5.3 <span class="todo">TODO</span> Arc2
            LOCO/RayTrace measurements: Yves, Ryan, Tief (2h)</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11???">ATLis
              11???</a>: Install new optics into arc2 for body gradient
            measurements from
            LOCO/RayTrace, perform measurement, and back out. Planned
            for Tue 2011-05-10.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-22">1.6 6 Month SAD Items: Upcoming</h3>
        <div class="outline-4">
          <h4 id="sec-23">1.6.1 2011-05-11: C100 BBU/low energy/Hall C:
            Todd/Shahid/Ilkyoung</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-24">1.6.2 ?: Quad centering/beam-based alignment
            (Concern from Spata)</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-25">1.7 6 Month SAD Items: This Week</h3>
        <div class="outline-4">
          <h4 id="sec-26">1.7.1 Frequency-agile MO (FRAGMO) test
            plan/considerations: Tief</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11122">ATLis
              11122</a>: Remote frequency control of MO restored Tue
            2011-04-26, see
            <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1601146">e1601146</a>
            and <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1601147">e1601147</a>.
            Don't touch it!
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-27">1.7.2 Generate specs for golden zero rels
            (perhaps not just injector): Mike McCaughin</h4>
        </div>
      </div>
    </div>
    <div id="postamble">
      <p class="author"> Author: Todd Satogata
        <a href="mailto:satogata@todd-satogatas-macbook-pro.local"><satogata@todd-satogatas-macbook-pro.local></a>
      </p>
      <p class="date"> Date: 2011/05/02 12:28:19</p>
    </div>
  </body>
</html>