<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
  </head>
  <body>
    <title>BTeam-2011-05-11</title>
    <meta http-equiv="Content-Type" content="text/html;
      charset=ISO-8859-1">
    <meta name="generator" content="Org-mode">
    <meta name="generated" content="2011/05/11 12:33:56">
    <meta name="author" content="Todd Satogata">
    <style type="text/css">
  html {
        font-family: Times, serif;
        font-size: 12pt;
  }
  .title { text-align: center; }
  .todo  { color: red; }
  .done { color: green; }
  .timestamp { color: grey }
  .timestamp-kwd { color: CadetBlue }
  .tag { background-color:lightblue; font-weight:normal }
  .target { background-color: lavender; }
  pre {
        border: 1pt solid #AEBDCC;
        background-color: #F3F5F7;
        padding: 5pt;
        font-family: courier, monospace;
  }
  table { border-collapse: collapse; }
  td, th {
        vertical-align: top;
        <!--border: 1pt solid #ADB9CC;-->
  }
</style>BTeam,<br>
    <br>
    Here is the agenda for this afternoon's BTeam meeting, the last of
    this year's run. We<br>
    will continue to have BTeam meetings during the shutdown, focusing
    on analysis of<br>
    existing data, reports on systems that impact test plans, and
    accelerator physics planning<br>
    for the restart in the fall. Thank you for all your help and support
    through the run -- we<br>
    have a lot to be proud of.<br>
    <br>
    -Todd<br>
    <h1 class="title">BTeam-2011-05-11</h1>
    <div class="outline-2">
      <h2 id="sec-1">1 2011-05-04 Wed 14:00 BTeam Meeting Agenda</h2>
      <div class="outline-3">
        <h3 id="sec-2">1.1 Short meeting today since JLab RunAround is
          at 15:00ish</h3>
      </div>
      <div class="outline-3">
        <h3 id="sec-3">1.2 End of Run this Friday, 2011-05-13! QWeak
          party at 14:00 on Friday.</h3>
      </div>
      <div class="outline-3">
        <h3 id="sec-4">1.3 Strategic Priorities for BTeam</h3>
        <div class="outline-4">
          <h4 id="sec-5">1.3.1 <span class="done">DONE</span> Mott
            polarimeter precision</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-6">1.3.2 <span class="done">DONE</span>
            Pathlength Correction with MO</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-7">1.3.3 <span class="done">DONE</span> CEBAF
            baseline</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-8">1.3.4 <span class="done">DONE</span>
            LOCO/RayTrace data, improvements</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-9">1.3.5 <span class="done">DONE</span> Optics
            machine/model improvements</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-10">1.3.6 <span class="done">DONE</span>
            Additional bunchlength measurement, optimization</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-11">1.3.7 <span class="done">DONE</span> Support
            of current experiments</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-12">1.3.8 <span class="todo">TODO</span>
            ORFP/Troubleshooting Guide Update (for six month SAD)</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-13">1.4 Optics-on-Call Report: Balsa (May
          4-7)/Byung/Yves</h3>
      </div>
      <div class="outline-3">
        <h3 id="sec-14">1.5 Beam Studies Report</h3>
        <div class="outline-4">
          <h4 id="sec-15">1.5.1 <span class="done">DONE</span> 6T
            Multipole Measurements part IV: Spata</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11123">ATLis
              11123</a>: Done Thu 2011-05-05, see <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1627270">e1627270</a>.
            Data looks lovely,
            very nice modulations.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-16">1.5.2 <span class="done">DONE</span> RayTrace
            data at : Bodenstein</h4>
          <p>No ATLis: RayTrace data was collected at IPM1A01 launched
            from
            MBT1E02H/03H and MBT1E02V/03V.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-17">1.5.3 <span class="done">DONE</span> Injector
            Bunchlength 130kV test: Kazimi et al</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11129">ATLis
              11129</a>: Done Thu 2011-05-05, see <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1627339">e1627339</a>.
            The bunchlength program
            worked without expert intervention for 130kV gun settings,
            showing a
            need for a 3 degree change to the chopper phase. This should
            be ready
            to go for next year.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-18">1.5.4 <span class="done">DONE</span> FRAGMO
            path length changes: Tiefenback</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11152">ATLis
              11152</a>: Done Thu 2011-05-05, see <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1627411">e1627411</a>.
            Meant to bring opsig
            signals to specified limits; worked well for NL but not so
            well for
            SL. Another adjustment was made when pathlength was
            problematic on
            swing shift Sun 2011-05-08 after the pass change, see
            summary from
            Tief in <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1627974">e1627974</a>,
            with more followup in <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1628141">e1628141</a>.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-19">1.5.5 <span class="done">DONE</span> BFM or
            Bust, Mott test: Grames, Suleiman</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11042">ATLis
              11042</a>: Done Mon 2011-05-09, see <a
              href="https://cebaf.jlab.org/elog/elog_item.php?elog_id=1628117">e1628117</a>.
            Patched LLRF through BFM,
            set up multiple beams, then B/C beam to Mott for Mott tests.
            BFM sync
            signal moderately noisy, but still some improvement in out
            of time
            electron rejection.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-20">1.5.6 <span class="done">DONE</span> 2L21
            Shake Test</h4>
          <p>No ATLis? Testing sensitivity to microphonics, ~1-100Hz, in
            2L21
            cryomodule similar to afflicted R100 assembly.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-21">1.5.7 <span class="done">DONE</span> QWeak
            Injector Tests: Paschke, Dalton, et al</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11081">ATLis
              11081</a>, <a
              href="http://cebaf.jlab.org/atlis/task/10625">10625</a>:
            Verify zero point of hall C IA cell, adjust
            rotatable HWP and Pockels cell translation. Done Mon
            2011-05-09.
          </p>
        </div>
        <div class="outline-4">
          <h4 id="sec-22">1.5.8 <span class="done">DONE</span> Arc2
            LOCO/RayTrace optics tests: Yves</h4>
          <p><a href="http://cebaf.jlab.org/atlis/task/11166">ATLis
              11166</a>: Continued optics evaluation of machine, now in
            Arc2.
            Install new optics in Arc2 and perform LOCO measurements.
            Acquired
            data Tue 2011-05-10 for Arc2 baseline before 6 month SAD
            H-steel
            magnet retrofit.
          </p>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-23">1.6 6 Month SAD Items: Upcoming</h3>
        <div class="outline-4">
          <h4 id="sec-24">1.6.1 2011-05-18: C100 BBU/low energy/Hall C:
            Todd/Shahid/Ilkyoung</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-25">1.6.2 ?: Quad centering/beam-based alignment
            (Concern from Spata)</h4>
        </div>
        <div class="outline-4">
          <h4 id="sec-26">1.6.3 Generate specs for golden zero rels
            (perhaps not just injector): Mike McCaughin</h4>
        </div>
      </div>
      <div class="outline-3">
        <h3 id="sec-27">1.7 6 Month SAD Items: This Week</h3>
        <div class="outline-4">
          <h4 id="sec-28">1.7.1 Reworked dipole magnet hysteresis end
            points: Arne/Tief/Spata/etc</h4>
          <p>Leigh Harwood has requested input on top ends of hysteresis
            loops for
            reworked magnet measurements, for 6 and 12 GeV, for the 6
            month SAD.
            See the attached spreadsheet, which has blanks in the Hmax
            setting
            column [H] that we should fill in. Data for Arc10 is already
            in hand.
            Questions:
          </p>
          <ol>
            <li>
              Are there strong preferences for Hmax relative to 12GeV
              settings
              and power supply Imax?
            </li>
            <li>
              Will measure some unmodified magnets on 6GeV loops to
              understand
              shim requirements in case of disaster. Are Hmax settings
              setup
              dependent? If so, what settings should be used?
            </li>
          </ol>
          <p>Tief notes that it's best to run on the calibrated part of
            the
            curves from the bottom up, so the hysteresis only depends on
            minimum current and not previous peak current. Historically
            we
            have had some problems at ~20A where PS have tripped at the
            low
            end and the low side of the current had to be adjusted by
            3-4A. This caused a problem at least once in either Hall A
            or C
            (can't now remember which) at the 1%-2% energy calibration
            level.
            It was associated with using control points which were much
            less
            than 10% of peak dipole current values.
          </p>
          <p>
            To address Leigh's particular question, I would expect the
            power
            supplies to be set to use something like
            min[Max<sub>Rated</sub><sub>Current</sub>, (Max<sub>InService</sub><sub>Current</sub>*1.05)]
as
            peak hysteresis current. And I'd hope for a margin of more
            than 5% above Max<sub>InService</sub><sub>Current</sub> for
            the Max<sub>Rated</sub><sub>Current</sub>
            number. This seems to me to be a sufficient answer. It is an
            "ask me and I'll tell you what I think" number, but I think
            that
            it is defensible from an operations and calibration
            standpoint. I
            am swayable on this issue by any others of you who think
            differently. We should have a discussion to confirm or
            modify
            this prior to transmitting a firm answer to Leigh.
          </p>
          <p>
            Arne dug up the existing Hmax values: Arc2 210, Arc4 230,
            Arc6 305,
            Arc7 240, Arc8 270, Arc9 305. Should we just have Leigh use
            these?
          </p>
        </div>
      </div>
    </div>
    <div id="postamble">
      <p class="author"> Author: Todd Satogata
        <a href="mailto:satogata@Todd-Satogatas-MacBook-Pro.local"><satogata@Todd-Satogatas-MacBook-Pro.local></a>
      </p>
      <p class="date"> Date: 2011/05/11 12:33:56</p>
    </div>
  </body>
</html>