<html>
  <head>
    <meta http-equiv="content-type" content="text/html;
      charset=ISO-8859-1">
  </head>
  <body bgcolor="#FFFFFF" text="#000000">
    <title>BTeam-2011-10-25</title>
    <meta http-equiv="Content-Type" content="text/html;
      charset=ISO-8859-1">
    <meta name="generator" content="Org-mode">
    <meta name="generated" content="2011/10/31 15:34:55">
    <meta name="author" content="Todd Satogata">
    <style type="text/css">
  html {
        font-family: Times, serif;
        font-size: 12pt;
  }
  .title { text-align: center; }
  .todo  { color: red; }
  .done { color: green; }
  .timestamp { color: grey }
  .timestamp-kwd { color: CadetBlue }
  .tag { background-color:lightblue; font-weight:normal }
  .target { background-color: lavender; }
  pre {
        border: 1pt solid #AEBDCC;
        background-color: #F3F5F7;
        padding: 5pt;
        font-family: courier, monospace;
  }
  table { border-collapse: collapse; }
  td, th {
        vertical-align: top;
        <!--border: 1pt solid #ADB9CC;-->
  }
</style>BTeamers,<br>
    <br>
    Beam's a'comin' -- updates on schedule, current beam activities,
    latest studies (including injector<br>
    coupling and BBU preparations) etc at tomorrow's 11:00 BTeam
    meeting. See you there!<br>
    <br>
    -Todd<br>
    <br>
    <h1 class="title">BTeam 2011-10-25</h1>
    <div class="outline-2">
      <h2 id="sec-1">2011-10-25 Tue 11:00 BTeam Meeting Notes</h2>
    </div>
    <div class="outline-2">
      <h2 id="sec-2">1 Run scheduling and schedule update</h2>
      <ul>
        <li>The <a
href="http://opsweb.acc.jlab.org/beam_strestoration_calendar/2011-10.html">October

            restoration calendar</a> is linked from the <a
            href="https://devweb.acc.jlab.org/twiki/bin/view/BTeam/6MSadFiles">BTeam

            wiki</a><br>
        </li>
        <li>Send relevant ATLis items for linkage to Arne; he will post
          instructions later<br>
          <ul>
            <li>Please update/create <a
                href="http://opsweb.acc.jlab.org/CSUEApps/atlis/atlis.php">ATLis

                items</a> for planned CASA support/BTeam beam items<br>
            </li>
            <li>Jay has updated priorities on some ATLis items<br>
            </li>
            <li><span class="todo">TODO</span> Make list of beam physics
              campaigns that are critical path for this run
              (Todd/Arne/et al)<br>
              <ul>
                <li>Starting to collect items, will send out a specific
                  request to BTeam list<br>
                </li>
              </ul>
            </li>
            <li><span class="todo">TODO</span> Review strawman proposals
              of beam study/spot moves/activation/Wien flip scheduling<br>
            </li>
          </ul>
        </li>
        <li>CEBAF spin-up is now estimated for Fri 28 Oct (schedule
          still in flux; later delayed to Tue 1 NOv)<br>
          <ul>
            <li>MYA repairs complete, pumping down down, have beaten
              tagger wall installation<br>
            </li>
            <li>Still cannot go past 45 MeV dump without tagger wall;
              chicane dipoles locked out<br>
            </li>
            <li>Gradient/RF recovery limited due to parts shortage for
              circulator water leak repair<br>
            </li>
            <li>Strawman: Potentially coming up at 4 GeV settings;
              number of passes unknown before tagger wall install<br>
              <ul>
                <li>800 MeV/pass (400 MeV/linac), ~4 days of spin-up<br>
                </li>
                <li><span class="done">DONE</span> Establish further
                  rotation of CASA support over spin-up; Jay takes over
                  as PD on 2011-11-02<br>
                </li>
                <li><span class="todo">TODO</span> Tief will get
                  involved with C100-x gradient calibration mid-week
                  ~2011-11-08<br>
                </li>
              </ul>
            </li>
          </ul>
        </li>
        <li>BBU study interleaves with C100 cavity work starting Tue/Wed
          1-2 Nov 2011<br>
          <ul>
            <li><span class="done">DONE</span> Evaluate 1-pass vs 2-pass
              power into HOMs (Todd confirmed with Tennant that 2-pass
              is necessary)<br>
            </li>
          </ul>
        </li>
        <li>Ivolve optics on call to have strong role in study
          restoration<br>
          <ul>
            <li>INPROGRESS Complete document to make Optics On Call role
              recommendations (Todd/Alicia/MikeMc)<br>
            </li>
            <li>INPROGRESS Develop a post-studies restoration checklist,
              including projected high current<br>
            </li>
          </ul>
        </li>
      </ul>
    </div>
    <div class="outline-2">
      <h2 id="sec-3">2 Optics on call</h2>
      <ul>
        <li><span class="done">DONE</span> Update Web On Call with
          optics list for ops support (first week; Todd)<br>
        </li>
        <li><span class="todo">TODO</span> Will need more maintenance
          with training, beyond BBU shifts during startup<br>
        </li>
      </ul>
    </div>
    <div class="outline-2">
      <h2 id="sec-4">3 Alex Bogacz: Injector optics for low energy BBU
        setup</h2>
      <ul>
        <li>Has prepared low energy isochronous injector design optics
          for BBU study<br>
        </li>
        <li>Present low-eta optics (in Art++ Feb 2011); 5 MeV=>6.3
          MeV, 0L03/4, inj chicane, NL FODO, 6.3=>45 MeV<br>
          <ul>
            <li>Nice dispersion in chicane (down, up, down pattern)<br>
            </li>
            <li>Large contribution from end field focusing of cavity
              gradients<br>
            </li>
          </ul>
        </li>
        <li>Low energy, 6.3=>16.8 MeV KE<br>
          <ul>
            <li>Had to rematch instead of scaling quadrupoles because of
              low-energy RF cavity focusing<br>
            </li>
            <li>Set new matchpoint to old matchpoint at 0L07<br>
              <ul>
                <li>Fits: 0L01 BDL 0, 0L02=-163.846, 0L02A=162.986,
                  0L03A=0 0L03=-90.518 0L04=0 0L05=-76.205<br>
                </li>
              </ul>
            </li>
            <li>After that rematch one can basically scale down
              quadrupoles from original model, same with chicane<br>
            </li>
            <li>Still matched at end to standard NL first pass (120
              degree), matching done earlier than chicane<br>
              <ul>
                <li>since chicane 4 degrees fo freedom (with mirror
                  symmetry) is needed for achromat, m56 fix, etc<br>
                </li>
              </ul>
            </li>
            <li>Jay thinks we'll be around 1e-3 or more dp/p at low
              energy, but emittance is lower<br>
              <ul>
                <li><span class="todo">TODO</span> Max dispersion is
                  about 3m, so this could be beam size of ~3mm (ouch);
                  can we lower this?<br>
                </li>
                <li><span class="todo">TODO</span> Can we figure out how
                  to lower the dispersion (to 1m) in the chicane? (Arne
                  wants to see fat beam through)<br>
                </li>
              </ul>
            </li>
            <li>Clyde: 0L03-3 had some issues over 2011-10-21 weekend,
              but repaired now<br>
            </li>
            <li>Ilkyoung made semi-periodic lattice for matching but not
              quite perfectly matched<br>
              <ul>
                <li>Need to match upstream optics and be careful about
                  beam size in middle of chicane<br>
                </li>
              </ul>
            </li>
            <li>We need the proper model in elegant for MultiHarp+
              analysis but don't really need to match<br>
              <ul>
                <li><span class="todo">TODO</span> Michelle/Jay will
                  evaluate feasibility of editing spreadsheet for match
                  values<br>
                </li>
                <li>elegant uses quad settings from machine to do
                  multiharp match<br>
                </li>
                <li><span class="done">DONE</span> Michelle will chat
                  with Ilkyoung about use of LEM to model linac
                  gradients for low energy<br>
                </li>
              </ul>
            </li>
          </ul>
        </li>
      </ul>
    </div>
    <div class="outline-2">
      <h2 id="sec-5">4 Beam activities</h2>
      <ul>
        <li><span class="done">DONE</span> Yves/Vasily worked on 45 MeV
          decoupling Sat 2011-10-22<br>
          <ul>
            <li>Transport matrices of 0L03/4 measured (gridded phase
              space before/after), 3 sets with various skew settings<br>
            </li>
            <li>Some questions about upstream BPM phase space; perhaps
              miscalibrated BPM or quad?<br>
            </li>
            <li>Also redid quarter cryo module measurements to confirm
              previous measurements<br>
            </li>
            <li>Will return for more measurements Sat 2011-10-29<br>
            </li>
          </ul>
        </li>
        <li><span class="done">DONE</span> Tief worked on zigzag
          emittance measurements Sun 2011-10-23<br>
          <ul>
            <li>Checked on consistency with previous year's answers;
              beam on center is stable<br>
            </li>
            <li>Calibration test: moved beam 4mm per BPM h/v and got
              harp ~5mm systematic measurement (20% scale error?)<br>
            </li>
            <li>Did not do combined h/v measurements, only independently<br>
            </li>
            <li>Do believe that SEE BPMs are sub-square law in response
              and so giving systematically low measurement<br>
              <ul>
                <li>Chao had complained about ~15% scale errors in Fast
                  SEE BPMs before too; also have seen in RayTrace<br>
                </li>
              </ul>
            </li>
          </ul>
        </li>
        <li><span class="done">DONE</span> Collect options for
          off-hours/weekend injector work (Rough priority order)<br>
          <ul>
            <li>High current beam studies/setup (Ops/Injector)<br>
              <ul>
                <li>Can get to ~80uA now until we schedule/perform a
                  heat/activate cycle (or use multiple lasers)<br>
                </li>
              </ul>
            </li>
            <li>Evaluate 0L03/0L04 beam-loaded noise after
              IF/GASKR/PASKR noise fix (parasitic, Ops/Clyde)<br>
            </li>
            <li>BBU injector setup studies (backphase bunch length at 45
              MeV spectrometer? Injector team/Todd)<br>
            </li>
            <li>45 MeV decoupling (Vasily/Yves)<br>
            </li>
            <li>Emittance studies/zigzag (Tief/Ryan/Dennis, needs ATLis)<br>
            </li>
            <li>Test whether choppers are the source of differential
              timing (Tief, needs ATLis)<br>
            </li>
            <li>BBU injector setup/M56 through chicane (after tagger
              dump wall, Injector/Todd)<br>
            </li>
          </ul>
        </li>
        <li><span class="todo">TODO</span> CASA Injector training
          session?<br>
        </li>
      </ul>
    </div>
    <div id="postamble"><br>
    </div>
  </body>
</html>