<div class="outline-2">BTeamers,<br>
<br>
Here are the BTeam notes from last week's Nov 15 meeting. There
have been some<br>
challenges over the weekend during hall beam setup with energy
locks, box supply<br>
settings, and optics match that we should discuss tomorrow. I'll
catch up with folks<br>
through the course of today and send out an agenda later this
afternoon. See you<br>
tomorrow at 11:00 in MCC! Cheers!<br>
<br>
-Todd<br>
</div>
<div class="outline-2">
<h2 id="sec-2">1 Tief: C100 and 1L04 gradient calibrations and
phase set issues</h2>
<ul>
<li>Beam time Sat 12 Nov, <a
href="http://cebaf.jlab.org/elog/entry/1648054">e1648054</a><br>
</li>
<li>GSETs calibrated relative to changes in 2L20 energy lock
cavities<br>
</li>
<li>Average gradients look good, though with some outliers
(2L24-1, 2L25-4)<br>
</li>
<li>Some issues with phase setting deadbands and loss of phase
info when C100s reset<br>
</li>
<li>Apparent issues with ramping gradients linearly rather than
quadratically with gradient<br>
</li>
<li>Did not verify cresting of 1L04 checked cavities, but
performance was within expectations<br>
</li>
<li>Does Krest work on these cavities? Probably not yet.<br>
</li>
</ul>
</div>
<div class="outline-2">
<h2 id="sec-3">2 Run scheduling and schedule update</h2>
<ul>
<li>The <a
href="https://cebaf.jlab.org/ops/MCC_whiteboard/MCC_scheduling_whiteboard.html">scheduling
whiteboard</a> driven by the PD is the official near-term
operations calendar<br>
<ul>
<li>We are perilously close to collaborative checks and
start of physics later this week<br>
</li>
<li>Physics delivery of beam to halls is due to start over
Nov 19 weekend<br>
</li>
<li>5-pass ORFP has proceeded reasonably smoothly at 281.6
MeV/linac, injector Energy 31.68 MeV<br>
</li>
<li>Weds 13:30 weekly ops meetings start Nov 16; BTeam
meeting shifting to studies/planning/support<br>
</li>
</ul>
</li>
</ul>
</div>
<div class="outline-2">
<h2 id="sec-4">3 BBU Study Update</h2>
<ul>
<li>C100 BBU studies were started last week
(Todd/Ilkyoung/Shahid/Byung/Haipeng/…)<br>
</li>
<li>Very low energy setup (16.8 MeV injector) was very smooth
through injector<br>
<ul>
<li>But it was ultimately abandoned when second pass was not
converging in ORFP<br>
</li>
<li><span class="todo">TODO</span>: Postmortem low-energy
optics tuning to understand optics difficulties<br>
</li>
</ul>
</li>
<li>Setup moved to nominal lattice, 281.6 MeV/linac, max current
~80 uA<br>
</li>
<li>HOM spectral data surveyed for current dependence for 40/80
uA, C100-1/2, 90/105 deg/cell<br>
<ul>
<li>Nearly all usable data taken over stable swing/owl shift
pairs Fri-Sun 11-13 Nov<br>
</li>
</ul>
</li>
<li>Optics, Raytrace, fopt data taken for both optics
configurations<br>
</li>
<li>Already a challenging study with expected thresholds in tens
of mA<br>
</li>
<li><span class="todo">TODO</span>: Analysis, including
evaluation of other HOM peak power dependencies<br>
</li>
<li><span class="todo">TODO</span>: More data to be taken
parasitically with 180+ uA to Hall C dump, 120 deg/cell<br>
</li>
</ul>
</div>
<div class="outline-2">
<h2 id="sec-5">4 Vasily Morozov/Yves Roblin: Latest injector
coupling for parity quality measurements</h2>
<ul>
<li>Beam time Mon 14 Nov, <a
href="http://cebaf.jlab.org/elog/entry/1648457">e1648457</a>
with new skew quad values <a
href="http://cebaf.jlab.org/elog/entry/1648445">e1648445</a><br>
</li>
<li>Results inconclusive due to rather large skew quad settings
needed to fix coupling<br>
</li>
<li>Later analysis using Qweak DAQ <a
href="http://cebaf.jlab.org/elog/entry/1648544">e1648544</a>
show that attempted correction was ineffective<br>
</li>
<li>Only convergence in the past required small tweaks to
solution by hand from Jay/Yves<br>
</li>
<li><span class="todo">TODO</span>: Systematically check skew
quad polarities with beam etc (perhaps with low energy inj
setup?)<br>
<ul>
<li>Perhaps perform additional studies during day Wed 15 Nov<br>
</li>
</ul>
</li>
<li><span class="todo">TODO</span>: Verify new quad settings,
remeasure or reinstall for physics operations<br>
</li>
</ul>
</div>
<div class="outline-2">
<h2 id="sec-6">5 Other Outstanding Items</h2>
<ul>
<li>Path length evaluation (Tief)<br>
<ul>
<li>Some dogleg observations early that machine may have
shrunk during 6MSD<br>
</li>
<li>Had to modify some GOFFs in arcs to get dogleg settings
into reasonable ranges in 3-pass+ setup<br>
</li>
<li>What is steady state over this run?<br>
</li>
</ul>
</li>
<li>Some flutter on downstream BPMs<br>
</li>
<li>Optics/LOCO measurements (Yves)<br>
</li>
</ul>
</div>
<div class="outline-2">
<h2 id="sec-7">6 Optics on call</h2>
<ul>
<li><span class="done">DONE</span> Update Web On Call with
optics list for ops support<br>
</li>
<li>Please contact Todd for shift changes/swaps/alternate
coverage<br>
</li>
<li><span class="todo">TODO</span>: Add optics on call trainees
to on call list<br>
</li>
<li><span class="todo">TODO</span>: Start implementing new
optics on call support tasks for beam studies<br>
</li>
<li><span class="todo">TODO</span>: Other optics on call
training/mentoring?<br>
</li>
</ul>
</div>
<div class="outline-2">
<h2 id="sec-8">7 Beam studies schedule</h2>
<ul>
<li>Suggested start: Tue 29 Nov (after Thanksgiving break, into
regular operations)<br>
</li>
<li><span class="todo">TODO</span>: Establish overnight
schedule, align with spot move, Wien flips, etc<br>
</li>
<li><span class="todo">TODO</span>: update <a
href="http://opsweb.acc.jlab.org/CSUEApps/atlis/atlis.php">ATLis
items</a>, including closing out deprecated ATLis activities<br>
</li>
<li>Involve optics on call to have strong role in study
restoration<br>
<ul>
<li>INPROGRESS Complete document to make Optics On Call role
recommendations (Todd/Alicia/MikeMc)<br>
<ul>
<li><span class="todo">TODO</span> Present at next BTeam<br>
</li>
</ul>
</li>
<li>INPROGRESS Develop a post-studies restoration checklist,
including projected high current<br>
</li>
</ul>
</li>
</ul>
</div>
<div class="outline-2">
<h2 id="sec-9">8 QWeak Run II Bootstrap Plan (from Jay)</h2>
<ul>
<li>Can't turn raster off without target, want to keep hall
radiologically clean<br>
<ul>
<li>Mark Dalton: Current restrictions have been brought down
based on window damaged observed from last year<br>
</li>
<li>10 uA unrastered CW is present current limit, 5 uA is
enough for harp traces for matching<br>
</li>
</ul>
</li>
<li>2-3 shifts of beamline recommissioning (a), Jay expects to
be present for a lot of it<br>
</li>
</ul>
</div>
<div class="outline-2">
<h2 id="sec-10">9 Hall B checkout will follow standard procedures
(Tief)</h2>
<ul>
<li>Viewer moved from 2C23->2C24<br>
</li>
<li>Spata: plan to do multiharp to BSY to check exit optics
tonight</li>
</ul>
</div>
<style type="text/css">
html {
font-family: Times, serif;
font-size: 12pt;
}
.title { text-align: center; }
.todo { color: red; }
.done { color: green; }
.timestamp { color: grey }
.timestamp-kwd { color: CadetBlue }
.tag { background-color:lightblue; font-weight:normal }
.target { background-color: lavender; }
pre {
border: 1pt solid #AEBDCC;
background-color: #F3F5F7;
padding: 5pt;
font-family: courier, monospace;
}
table { border-collapse: collapse; }
td, th {
vertical-align: top;
<!--border: 1pt solid #ADB9CC;-->
}
</style>
</body>
</html>