    <div class="outline-2">BTeamers,<br>
      <br>
      Here are the BTeam notes from last week's Nov 15 meeting. There
      have been some<br>
      challenges over the weekend during hall beam setup with energy
      locks, box supply<br>
      settings, and optics match that we should discuss tomorrow. I'll
      catch up with folks<br>
      through the course of today and send out an agenda later this
      afternoon. See you<br>
      tomorrow at 11:00 in MCC! Cheers!<br>
      <br>
      -Todd<br>
    </div>
    <div class="outline-2">
      <h2 id="sec-2">1 Tief: C100 and 1L04 gradient calibrations and
        phase set issues</h2>
      <ul>
        <li>Beam time Sat 12 Nov, <a
            href="http://cebaf.jlab.org/elog/entry/1648054">e1648054</a><br>
        </li>
        <li>GSETs calibrated relative to changes in 2L20 energy lock
          cavities<br>
        </li>
        <li>Average gradients look good, though with some outliers
          (2L24-1, 2L25-4)<br>
        </li>
        <li>Some issues with phase setting deadbands and loss of phase
          info when C100s reset<br>
        </li>
        <li>Apparent issues with ramping gradients linearly rather than
          quadratically with gradient<br>
        </li>
        <li>Did not verify cresting of 1L04 checked cavities, but
          performance was within expectations<br>
        </li>
        <li>Does Krest work on these cavities? Probably not yet.<br>
        </li>
      </ul>
    </div>
    <div class="outline-2">
      <h2 id="sec-3">2 Run scheduling and schedule update</h2>
      <ul>
        <li>The <a
href="https://cebaf.jlab.org/ops/MCC_whiteboard/MCC_scheduling_whiteboard.html">scheduling
            whiteboard</a> driven by the PD is the official near-term
          operations calendar<br>
          <ul>
            <li>We are perilously close to collaborative checks and
              start of physics later this week<br>
            </li>
            <li>Physics delivery of beam to halls is due to start over
              Nov 19 weekend<br>
            </li>
            <li>5-pass ORFP has proceeded reasonably smoothly at 281.6
              MeV/linac, injector Energy 31.68 MeV<br>
            </li>
            <li>Weds 13:30 weekly ops meetings start Nov 16; BTeam
              meeting shifting to studies/planning/support<br>
            </li>
          </ul>
        </li>
      </ul>
    </div>
    <div class="outline-2">
      <h2 id="sec-4">3 BBU Study Update</h2>
      <ul>
        <li>C100 BBU studies were started last week
          (Todd/Ilkyoung/Shahid/Byung/Haipeng/…)<br>
        </li>
        <li>Very low energy setup (16.8 MeV injector) was very smooth
          through injector<br>
          <ul>
            <li>But it was ultimately abandoned when second pass was not
              converging in ORFP<br>
            </li>
            <li><span class="todo">TODO</span>: Postmortem low-energy
              optics tuning to understand optics difficulties<br>
            </li>
          </ul>
        </li>
        <li>Setup moved to nominal lattice, 281.6 MeV/linac, max current
          ~80 uA<br>
        </li>
        <li>HOM spectral data surveyed for current dependence for 40/80
          uA, C100-1/2, 90/105 deg/cell<br>
          <ul>
            <li>Nearly all usable data taken over stable swing/owl shift
              pairs Fri-Sun 11-13 Nov<br>
            </li>
          </ul>
        </li>
        <li>Optics, Raytrace, fopt data taken for both optics
          configurations<br>
        </li>
        <li>Already a challenging study with expected thresholds in tens
          of mA<br>
        </li>
        <li><span class="todo">TODO</span>: Analysis, including
          evaluation of other HOM peak power dependencies<br>
        </li>
        <li><span class="todo">TODO</span>: More data to be taken
          parasitically with 180+ uA to Hall C dump, 120 deg/cell<br>
        </li>
      </ul>
    </div>
    <div class="outline-2">
      <h2 id="sec-5">4 Vasily Morozov/Yves Roblin: Latest injector
        coupling for parity quality measurements</h2>
      <ul>
        <li>Beam time Mon 14 Nov, <a
            href="http://cebaf.jlab.org/elog/entry/1648457">e1648457</a>
          with new skew quad values <a
            href="http://cebaf.jlab.org/elog/entry/1648445">e1648445</a><br>
        </li>
        <li>Results inconclusive due to rather large skew quad settings
          needed to fix coupling<br>
        </li>
        <li>Later analysis using Qweak DAQ <a
            href="http://cebaf.jlab.org/elog/entry/1648544">e1648544</a>
          show that attempted correction was ineffective<br>
        </li>
        <li>Only convergence in the past required small tweaks to
          solution by hand from Jay/Yves<br>
        </li>
        <li><span class="todo">TODO</span>: Systematically check skew
          quad polarities with beam etc (perhaps with low energy inj
          setup?)<br>
          <ul>
            <li>Perhaps perform additional studies during day Wed 15 Nov<br>
            </li>
          </ul>
        </li>
        <li><span class="todo">TODO</span>: Verify new quad settings,
          remeasure or reinstall for physics operations<br>
        </li>
      </ul>
    </div>
    <div class="outline-2">
      <h2 id="sec-6">5 Other Outstanding Items</h2>
      <ul>
        <li>Path length evaluation (Tief)<br>
          <ul>
            <li>Some dogleg observations early that machine may have
              shrunk during 6MSD<br>
            </li>
            <li>Had to modify some GOFFs in arcs to get dogleg settings
              into reasonable ranges in 3-pass+ setup<br>
            </li>
            <li>What is steady state over this run?<br>
            </li>
          </ul>
        </li>
        <li>Some flutter on downstream BPMs<br>
        </li>
        <li>Optics/LOCO measurements (Yves)<br>
        </li>
      </ul>
    </div>
    <div class="outline-2">
      <h2 id="sec-7">6 Optics on call</h2>
      <ul>
        <li><span class="done">DONE</span> Update Web On Call with
          optics list for ops support<br>
        </li>
        <li>Please contact Todd for shift changes/swaps/alternate
          coverage<br>
        </li>
        <li><span class="todo">TODO</span>: Add optics on call trainees
          to on call list<br>
        </li>
        <li><span class="todo">TODO</span>: Start implementing new
          optics on call support tasks for beam studies<br>
        </li>
        <li><span class="todo">TODO</span>: Other optics on call
          training/mentoring?<br>
        </li>
      </ul>
    </div>
    <div class="outline-2">
      <h2 id="sec-8">7 Beam studies schedule</h2>
      <ul>
        <li>Suggested start: Tue 29 Nov (after Thanksgiving break, into
          regular operations)<br>
        </li>
        <li><span class="todo">TODO</span>: Establish overnight
          schedule, align with spot move, Wien flips, etc<br>
        </li>
        <li><span class="todo">TODO</span>: update <a
            href="http://opsweb.acc.jlab.org/CSUEApps/atlis/atlis.php">ATLis
            items</a>, including closing out deprecated ATLis activities<br>
        </li>
        <li>Involve optics on call to have strong role in study
          restoration<br>
          <ul>
            <li>INPROGRESS Complete document to make Optics On Call role
              recommendations (Todd/Alicia/MikeMc)<br>
              <ul>
                <li><span class="todo">TODO</span> Present at next BTeam<br>
                </li>
              </ul>
            </li>
            <li>INPROGRESS Develop a post-studies restoration checklist,
              including projected high current<br>
            </li>
          </ul>
        </li>
      </ul>
    </div>
    <div class="outline-2">
      <h2 id="sec-9">8 QWeak Run II Bootstrap Plan (from Jay)</h2>
      <ul>
        <li>Can't turn raster off without target, want to keep hall
          radiologically clean<br>
          <ul>
            <li>Mark Dalton: Current restrictions have been brought down
              based on window damaged observed from last year<br>
            </li>
            <li>10 uA unrastered CW is present current limit, 5 uA is
              enough for harp traces for matching<br>
            </li>
          </ul>
        </li>
        <li>2-3 shifts of beamline recommissioning (a), Jay expects to
          be present for a lot of it<br>
        </li>
      </ul>
    </div>
    <div class="outline-2">
      <h2 id="sec-10">9 Hall B checkout will follow standard procedures
        (Tief)</h2>
      <ul>
        <li>Viewer moved from 2C23->2C24<br>
        </li>
        <li>Spata: plan to do multiharp to BSY to check exit optics
          tonight</li>
      </ul>
    </div>
    <style type="text/css">
  html {
        font-family: Times, serif;
        font-size: 12pt;
  }
  .title { text-align: center; }
  .todo  { color: red; }
  .done { color: green; }
  .timestamp { color: grey }
  .timestamp-kwd { color: CadetBlue }
  .tag { background-color:lightblue; font-weight:normal }
  .target { background-color: lavender; }
  pre {
        border: 1pt solid #AEBDCC;
        background-color: #F3F5F7;
        padding: 5pt;
        font-family: courier, monospace;
  }
  table { border-collapse: collapse; }
  td, th {
        vertical-align: top;
        <!--border: 1pt solid #ADB9CC;-->
  }
</style>
  </body>
</html>