<html>
<head>
<meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
</head>
<body>
<title>BTeam-2012-01-17</title>
Dear BTeamers,<br>
<br>
Here is the agenda for today's 11:00 meeting, mostly reviewing last
week's beam studies<br>
(very successful and on time!) and organizing for this week's beam
studies tomorrow.<br>
There is currently injector development work for high current
operations to hall C, which<br>
had some problems over the weekend after setup attempts on Friday
and Saturday. See<br>
you at the meeting -- cheers!<br>
<br>
-Todd<br>
<h1 class="title">BTeam-2012-01-17</h1>
<div class="outline-2">
<h2 id="sec-1">1 Optics on Call Report/Schedule</h2>
<ul>
<li>Rotates at BTeam (10:00 Tuesdays)<br>
</li>
<li>Medium-term machine development<br>
<ul>
<li><span class="todo">TODO</span> Add 5-pass spin-up ATLis
(as opportunistic in case of, e.g. ESR failure, Jay)<br>
</li>
</ul>
</li>
<li>10 Jan-17 Jan: Rui/Tief (Outgoing)<br>
<ul>
<li>Hall C high-current setup (180 uA) Fri 13 Jan<br>
</li>
<li>Issues with hall B match, hall C high current, injector
RF stability over weekend<br>
</li>
<li>Many issues addressed or in progress today in ~6h of
beam development<br>
<ul>
<li>Includes work by optics (Tief) and injector (Reza,
Alicia, Yan) teams <br>
</li>
</ul>
</li>
</ul>
</li>
<li>17 Jan-24 Jan: Vasily/Yves (Oncoming)<br>
<ul>
<li>Beam studies optics/recovery (Todd will assist)<br>
</li>
</ul>
</li>
<li>24 Jan-31 Jan: Balsa/Alex<br>
<ul>
<li>Balsa scheduled to be PD Jan 25-Feb 8<br>
</li>
<li><span class="todo">TODO</span> Readjust schedule to
accommodate Balsa's PD-ship; volunteers?<br>
</li>
</ul>
</li>
<li>31 Jan-07 Feb: Yuhong/Geoff<br>
</li>
<li>07 Feb-14 Feb: Ed/Todd<br>
</li>
<li>14 Feb-21 Feb: Fanglei/Mike Spata<br>
</li>
<li>21 Feb-28 Feb: Todd/Jay<br>
</li>
</ul>
</div>
<div class="outline-2">
<h2 id="sec-2">2 Beam Studies Report 10 Jan 2012</h2>
<ul>
<li>Studies scheduled 08:00-20:00 (on time) [7/7]<br>
<ul>
<li>
<b>[X]</b> —— 0.5 Optics: Fopts/allsaves (Optics)
</li>
<li>
<b>[X]</b> <a
href="https://cebaf.jlab.org/atlis/task/11850">a11850</a>
0.5 Software: Current lock checkout (Hofler)
</li>
<li>
<b>[X]</b> <a
href="https://cebaf.jlab.org/atlis/task/11851">a11851</a>
— Software: Current lock checkout (Hofler, with above)
</li>
<li>
<b>[X]</b> <a
href="https://cebaf.jlab.org/atlis/task/11532">a11532</a>
6.0 PePPo: DAQ tests of beam to BCM0L02 (Grames)
</li>
<li>
<b>[X]</b> <a
href="https://cebaf.jlab.org/atlis/task/11780">a11780</a>
— PePPo: Region 1 HCO with pulsed beam (Grames, with
above)
<a href="https://cebaf.jlab.org/elog/entry/1658558">e1658558</a>
<a href="https://cebaf.jlab.org/elog/entry/1658568">e1658568</a>
</li>
<li>
<b>[X]</b> <a
href="https://cebaf.jlab.org/atlis/task/11849">a11849</a>
2.0 Mott: Tests of new FADC Mott DAQ (Suleiman)
<a href="https://cebaf.jlab.org/elog/entry/1658628">e1658628</a>
</li>
<li>
<b>[X]</b> —— 3.0 Optics: failures, beam restoration
</li>
</ul>
</li>
<li>Need to schedule time for gun cycling (20 min) if both halls
down<br>
</li>
<li>Great success with first beam for PePPo<br>
</li>
</ul>
</div>
<div class="outline-2">
<h2 id="sec-3">3 Beam Studies Scheduled 18 Jan 2012</h2>
<ul>
<li><span class="todo">TODO</span> Submit ATLis items for
desired beam studies for next week<br>
</li>
<li>Studies scheduled 08:30-20:30<br>
<ul>
<li>
<b>[<span style="visibility:hidden;">X</span>]</b> <a
href="https://cebaf.jlab.org/atlis/task/11858">a11858</a>
0.0 C100: Search for 79 Hz (Parisitic)
</li>
<li>
<b>[<span style="visibility:hidden;">X</span>]</b> —— 1.0
Optics: Fopts/allsaves
</li>
<li>
<b>[<span style="visibility:hidden;">X</span>]</b> <a
href="https://cebaf.jlab.org/atlis/task/11882">a11882</a>
8.0 C100: Stability testing (Hovater, Spata, etc)
</li>
<li>
<b>[<span style="visibility:hidden;">X</span>]</b> <a
href="https://cebaf.jlab.org/atlis/task/11865">a11865</a>
1.0 Modeling: RayTrace validation (Bodenstein, Satogata)
</li>
<li>
<b>[<span style="visibility:hidden;">X</span>]</b> <a
href="https://cebaf.jlab.org/atlis/task/11885">a11885</a>
0.0 PePPo: Modeling (Grames, Contingency)
</li>
<li>
<b>[<span style="visibility:hidden;">X</span>]</b> <a
href="https://cebaf.jlab.org/atlis/task/11849">a11849</a>
0.0 Mott: Mott DAQ Test (Suleiman, Contingency)
</li>
<li>
<b>[<span style="visibility:hidden;">X</span>]</b> —— 2.0
Optics: Restoration
</li>
</ul>
</li>
<li>Optics should write notes, observations of fopt/etc to Bteam
elog<br>
</li>
</ul>
</div>
<meta http-equiv="Content-Type" content="text/html;
charset=ISO-8859-1">
<meta name="generator" content="Org-mode">
<meta name="generated" content="2012/01/17 10:36:22">
<meta name="author" content="Todd Satogata">
<style type="text/css">
html {
font-family: Times, serif;
font-size: 12pt;
}
.title { text-align: center; }
.todo { color: red; }
.done { color: green; }
.timestamp { color: grey }
.timestamp-kwd { color: CadetBlue }
.tag { background-color:lightblue; font-weight:normal }
.target { background-color: lavender; }
pre {
border: 1pt solid #AEBDCC;
background-color: #F3F5F7;
padding: 5pt;
font-family: courier, monospace;
}
table { border-collapse: collapse; }
td, th {
vertical-align: top;
<!--border: 1pt solid #ADB9CC;-->
}
</style>
</body>
</html>