    Geoff,<br>
        The limits in the 12GeV era are 1MW of beam power, so lower pass
    experiments can request higher beam current.  Specifically PREX is
    lobbying to come back as a 1-pass experiment and will take as much
    beam current as the target and the hall electronics can handle.<br>
    Arne<br>
    <br>
    On 01/26/2012 11:39 AM, Geoffrey Krafft wrote:
    <blockquote cite="mid:4F2181C1.6000406@jlab.org" type="cite">
      <meta content="text/html; charset=ISO-8859-1"
        http-equiv="Content-Type">
      On 1/26/2012 9:27 AM, Matt Poelker wrote:
      <blockquote cite="mid:4F2162CC.8080800@jlab.org" type="cite">
        <meta content="text/html; charset=ISO-8859-1"
          http-equiv="Content-Type">
        During the long shutdown, John Hansknecht will try to implement
        an idea that will allow us to produce longer laser pulses, which
        as Mike T points out, could improve transmission, reduce
        prebuncher gradient, and eliminate tails, etc.,.  Unfortunately,
        a longer laser pulse will not be available during QWeak and the
        rest of the 6GeV run.<br>
        Matt<br>
        <br>
        <br>
        Todd Satogata wrote:
        <blockquote cite="mid4F202145.4060209@jlab.org" type="cite">
          <meta http-equiv="content-type" content="text/html;
            charset=ISO-8859-1">
          <title>BTeam-2012-01-24</title>
          Bteamers,<br>
          <br>
          Here are the notes from yesterday's weekly meeting. There was
          a lot of discussion about the<br>
          tune time on Thursday that attempted to install a new M56
          optics in the injection chicane<br>
          but eventually was removed. Some issues were found in the
          model that will be addressed,<br>
          a LEMI configuration problem was fixed, some optics anomalies
          (such as the<br>
          disappearing/reappearing blown dispersion mismatch out of arc
          2) need understanding.<br>
          We learned important things during that tune time, but we will
          be more efficient if we<br>
          have more time to plan and double-check for tuning; Yves's
          summary at the end of what<br>
          worked and what didn't will be helpful for the planning of the
          5-pass spin-up; a plan is<br>
          being developed that will be discussed and hopefully scheduled
          by this week's beam<br>
          studies scheduling meeting on Friday.<br>
          <br>
          Alex Bogacz has graciously agreed to chair the BTeam meeting
          while I'm on travel<br>
          to SLAC Jan 26-Feb 1 inclusive.<br>
          <br>
          -Todd<br>
          <h1 class="title">BTeam-2012-01-24</h1>
          <div class="outline-2">
            <h2 id="sec-1">1 Optics on Call Report/Schedule</h2>
            <ul>
              <li>Rotates at BTeam (10:00 Tuesdays)<br>
              </li>
              <li>Medium-term machine development<br>
                <ul>
                  <li><span class="done">DONE</span> Write 5-pass
                    spin-up ATLis (Jay, <a moz-do-not-send="true"
                      href="https://cebaf.jlab.org/atlis/task/11894">a11894</a>),
relies

                    on ARC9 box supply repair (ongoing)<br>
                  </li>
                </ul>
              </li>
              <li>17 Jan-24 Jan: Vasily/Yves (Outgoing)<br>
                <ul>
                  <li>SL has still been running few degrees off crest to
                    reduce Compton backgrounds (Jay)<br>
                  </li>
                  <li>Hall B sensitivity to energy drift of some concern
                    (Tief)<br>
                  </li>
                  <li>Mon 23 Jan Add M56 optics in injector (Yves/Jay, <a
                      moz-do-not-send="true"
                      href="https://cebaf.jlab.org/atlis/task/11924">a11924</a>)<br>
                    <ul>
                      <li>Not successful, see Yves's entry at <a
                          moz-do-not-send="true"
                          href="https://cebaf.jlab.org/elog/entry/1661381">e1661381</a><br>
                      </li>
                      <li>HGAP for inj chicane dipoles will be updated;
                        0L/0R optics plan in the works<br>
                      </li>
                      <li>12h of tuning time: what was gained? How are
                        we accountable for that time?<br>
                        <ul>
                          <li>Who owns the process of unscheduled
                            tuning? Optics or plan owner should be
                            focus; PD schedules time<br>
                          </li>
                          <li>Scheduling for studies <1h later makes
                            things rushed, perhaps hours of inefficiency<br>
                          </li>
                          <li>OptiM to elegant translation can use
                            better efficiency (at least yesterday)<br>
                          </li>
                          <li>High sensitivity of Compton halo to 1L02
                            quad was found at end in current
                            configuration<br>
                          </li>
                          <li>Now running 2.5 degrees off crest in SL,
                            better than the 6+ degrees over weekend<br>
                          </li>
                          <li>We're very likely on the edge of
                            something, including scraping, based on
                            large sensitivities<br>
                          </li>
                          <li>RayTrace would provide optics, may also
                            well provide an aperture check (Tief)<br>
                          </li>
                          <li>Spot was a lot tighter in 1A with the M56
                            improvement, so we will likely want to use
                            this in Feb<br>
                          </li>
                          <li>Is a longer laser pulse feasible for 180uA
                            for better injector transmission/Hall B?
                            (Tief)<br>
                          </li>
                          <li>Alex: Can redesign an M56 optics with a
                            stronger 1L02 quad setting for potentially
                            improved stability<br>
                          </li>
                          <li>Underlying cause of arc2 dispersion match
                            blown? Was seen in previous week as well
                            (Jay/Spata/Tief)<br>
                          </li>
                          <li><span class="done">DONE</span> Jay has
                            changed LEM config file for NL to set 1L02
                            quad to 521.6 (as of AM Jan 24 2012)<br>
                          </li>
                          <li><span class="todo">TODO</span> injector
                            rematch with HGAP in 0R dipoles
                            (Michele/Yves, report Feb 02 BTeam)<br>
                          </li>
                          <li><span class="todo">TODO</span> Address
                            blown arc2 dispersion match during Jan 25
                            beam studies recovery (Optics)<br>
                          </li>
                          <li><span class="todo">TODO</span> Planning
                            group for M56:
                            Yves/Jay/Tief/Alicia/Alex/Ed/Geoff/Yuhong<br>
                          </li>
                        </ul>
                      </li>
                    </ul>
                  </li>
                </ul>
              </li>
              <li>24 Jan-31 Jan: Ed/Alex (Oncoming)<br>
                <ul>
                  <li><span class="todo">TODO</span> Readdress injection
                    matching to NL, SL gang phase, Hall C Compton<br>
                  </li>
                  <li><span class="todo">TODO</span> Restore SL MOMOD
                    after SL on crest, confirm good Hall C Compton rates
                    (Tief/ops)<br>
                  </li>
                  <li><span class="todo">TODO</span> Diagnose
                    intermittent problems in NL MOMOD (Musson? Tief?
                    Plawski?)<br>
                  </li>
                </ul>
              </li>
              <li>31 Jan-07 Feb: Yuhong/Geoff<br>
                <ul>
                  <li>5-pass spin-up schedule? Mid-February for Hall A,
                    but early Feb for Hall B shift?<br>
                  </li>
                </ul>
              </li>
              <li>07 Feb-14 Feb: Balsa/Todd<br>
              </li>
              <li>14 Feb-21 Feb: Fanglei/Mike Spata<br>
              </li>
              <li>21 Feb-28 Feb: Todd/Jay<br>
              </li>
            </ul>
          </div>
          <div class="outline-2">
            <h2 id="sec-2">2 Measuring Bunch Length using 1A Sync Light
              Monitor (Tief)</h2>
            <ul>
              <li>New BTeam elog entry on this procedure: <a
                  moz-do-not-send="true"
                  href="https://cebaf.jlab.org/elog/entry/1661304">e1661304</a><br>
              </li>
              <li>Done capturing images from datacube; online bunch
                length application may be resurrected (Michele/Tief)<br>
              </li>
              <li>Arne believes this will be resurrected when we have
                pure digital cameras for 12 GeV<br>
              </li>
              <li><span class="todo">TODO</span> Prioritize and
                projectize for long down (Arne)<br>
              </li>
            </ul>
          </div>
          <div class="outline-2">
            <h2 id="sec-3">3 C100 Status</h2>
            <ul>
              <li>26/52/79 Hz signal on 1/4 cryo drive gradient/phase
                (Suleiman/Spata)<br>
              </li>
              <li>Beam studies rescheduled for Wed 25 Feb<br>
              </li>
            </ul>
          </div>
          <div class="outline-2">
            <h2 id="sec-4">4 Beam Studies Report 18 Jan 2012</h2>
            <ul>
              <li>Studies scheduled 08:00-20:00 (on time)<br>
                <ul>
                  <li> <a moz-do-not-send="true"
                      href="https://cebaf.jlab.org/atlis/task/11858">a11858</a>
                    0.0 C100: Search for 79 Hz (Parisitic,
                    Suleiman/Spata; strong 52 Hz on 1/4 cryo drive
                    gradient/phase) </li>
                  <li> No other studies accomplished due to box supply
                    failures, repair </li>
                </ul>
              </li>
            </ul>
          </div>
          <div class="outline-2">
            <h2 id="sec-5">5 Beam Studies Scheduled 25 Jan 2012</h2>
            <ul>
              <li><span class="todo">TODO</span> Submit ATLis items for
                desired beam studies for next week (25 Jan)<br>
              </li>
              <li>Same studies as last week based on lost time to box
                supply failures<br>
              </li>
              <li>Studies scheduled 08:30-20:30<br>
                <ul>
                  <li> <b>[<span style="visibility: hidden;">X</span>]</b>
                    —— 1.0 Optics: Fopts/allsaves </li>
                  <li> <b>[<span style="visibility: hidden;">X</span>]</b>
                    <a moz-do-not-send="true"
                      href="https://cebaf.jlab.org/atlis/task/11882">a11882</a>
                    8.0 C100: Stability testing (Hovater, Spata, etc,
                    full gradient on both C100s, 10uA) </li>
                  <li> <b>[<span style="visibility: hidden;">X</span>]</b>
                    <a moz-do-not-send="true"
                      href="https://cebaf.jlab.org/atlis/task/11865">a11865</a>
                    1.0 Modeling: RayTrace validation (Bodenstein, Tief)
                  </li>
                  <li> <b>[<span style="visibility: hidden;">X</span>]</b>
                    <a moz-do-not-send="true"
                      href="https://cebaf.jlab.org/atlis/task/11885">a11885</a>
                    0.0 PePPo: Modeling (Grames, Contingency) </li>
                  <li> <b>[<span style="visibility: hidden;">X</span>]</b>
                    <a moz-do-not-send="true"
                      href="https://cebaf.jlab.org/atlis/task/11849">a11849</a>
                    0.0 Mott: Mott DAQ Test (Suleiman, Contingency) </li>
                  <li> <b>[<span style="visibility: hidden;">X</span>]</b>
                    —— 2.0 Optics: Restoration </li>
                </ul>
              </li>
              <li><span class="todo">TODO</span> Optics should write
                notes, observations of fopt/etc to Bteam elog<br>
                <ul>
                  <li>Include pathlength check (pathlength was good Mon
                    day)<br>
                  </li>
                </ul>
              </li>
            </ul>
          </div>
          <div class="outline-2">
            <h2 id="sec-6">6 Next week</h2>
            <ul>
              <li>Alex Bogacz has graciously agreed to chair while Todd
                is on travel<br>
              </li>
              <li>Hall B to 5th pass ~ Feb 1?<br>
              </li>
            </ul>
          </div>
          <div class="outline-2">
            <h2 id="sec-7">7 From last week: Evaluate possibilities of
              Krest during beam restoration (Okay)</h2>
            <ul>
              <li>Takes more like 4h to run through both linacs to get
                decent results (Terry)<br>
              </li>
              <li>But Hall C doesn't get good data while Krest is
                running either (but Hall B can)<br>
              </li>
              <li>Perhaps part of 2h can be a manual touch-up of
                cresting (15 min total, 2 operators)<br>
                <ul>
                  <li><span class="todo">TODO</span> Todd has emailed
                    Noel to see if manual touch-up is acceptable weekly
                    retune</li>
                </ul>
              </li>
            </ul>
          </div>
          <style type="text/css">
  html {
        font-family: Times, serif;
        font-size: 12pt;
  }
  .title { text-align: center; }
  .todo  { color: red; }
  .done { color: green; }
  .timestamp { color: grey }
  .timestamp-kwd { color: CadetBlue }
  .tag { background-color:lightblue; font-weight:normal }
  .target { background-color: lavender; }
  pre {
        border: 1pt solid #AEBDCC;
        background-color: #F3F5F7;
        padding: 5pt;
        font-family: courier, monospace;
  }
  table { border-collapse: collapse; }
  td, th {
        vertical-align: top;
        <!--border: 1pt solid #ADB9CC;-->
  }
  </style>
          <pre wrap=""><hr size="4" width="90%">
_______________________________________________
Bteam mailing list
<a moz-do-not-send="true" class="moz-txt-link-abbreviated" href="mailto:Bteam@jlab.org">Bteam@jlab.org</a>
<a moz-do-not-send="true" class="moz-txt-link-freetext" href="https://mailman.jlab.org/mailman/listinfo/bteam">https://mailman.jlab.org/mailman/listinfo/bteam</a></pre>
        </blockquote>
        <br>
        <br>
        <pre class="moz-signature" cols="72">-- 
Matt Poelker
Jefferson Lab
MS Bldg 5A, Rm 500-17 
12000 Jefferson Ave., 
Newport News, VA 23606
<a moz-do-not-send="true" class="moz-txt-link-abbreviated" href="mailto:poelker@jlab.org">poelker@jlab.org</a>
757-269-7357 office
757-897-9408 cell
</pre>
        <pre wrap=""><fieldset class="mimeAttachmentHeader"></fieldset>
_______________________________________________
Bteam mailing list
<a moz-do-not-send="true" class="moz-txt-link-abbreviated" href="mailto:Bteam@jlab.org">Bteam@jlab.org</a>
<a moz-do-not-send="true" class="moz-txt-link-freetext" href="https://mailman.jlab.org/mailman/listinfo/bteam">https://mailman.jlab.org/mailman/listinfo/bteam</a></pre>
      </blockquote>
      Not that I want to stop progress, but I would point out that<br>
      we are not scheduled to do any 180 muA running to any hall<br>
      AFTER the shutdown, and even if we were, my calculations<br>
      show that at 500 MHz and 180 muA, the beam charge is<br>
      0.36 pC. If some form of "space charge" mechanism is being<br>
      invoked that might "get better" with less charge density, I would<br>
      need to see a calculation using, e.g., a formula from Rieser to<br>
      convince me that <br>
      <br>
      What IS certain is that the larger bunch length will introduce<br>
      greater curvature effects in the compression and aberations.<br>
      Not a clear improvement to me!<br>
      <br>
      Geoff<br>
      <br>
      <fieldset class="mimeAttachmentHeader"></fieldset>
      <br>
      <pre wrap="">_______________________________________________
Bteam mailing list
<a class="moz-txt-link-abbreviated" href="mailto:Bteam@jlab.org">Bteam@jlab.org</a>
<a class="moz-txt-link-freetext" href="https://mailman.jlab.org/mailman/listinfo/bteam">https://mailman.jlab.org/mailman/listinfo/bteam</a></pre>
    </blockquote>
    <br>
    <pre class="moz-signature" cols="72">-- 
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab           Office: (757) 269-6268  
12000 Jefferson Avenue  Cell:   (757) 876-6289  
Newport News, VA 23606  Email:  <a class="moz-txt-link-abbreviated" href="mailto:freyberg@jlab.org">freyberg@jlab.org</a>