The proposed beam studies plan for Wednesday Feb 8th is below.
Note that at Step 5 in the M56 test the beam will be contained in
the injector for about 2hours. At this point Drury and C100 team
can perform their tests on the C100 (rad monitoring without beam).
<br>
<br>
At the end of the M56 test, the PEPPo magnet test will take place.
This is a quick test to see if the PEPPo magnets have enough fringe
field to move the injector beam.<br>
<br>
There is also an unlisted item of changing the RF configuration
during restoration. The change will consist turning both C100
modules on at some yet to be specified gradient.<br>
<br>
Arne<br>
<br>
<h2 id="sec-2"><span class="section-number-2">2</span> This Week \\
2012-02-08: </h2>
<div class="outline-text-2" id="text-2">
</div>
<h3 id="sec-2_1"><span class="section-number-3">2.1</span> Beam
Studies Program \\ This Week: 2012-02-08 Wed </h3>
<table rules="groups" frame="hsides" border="2" cellpadding="6"
cellspacing="0">
<caption><br>
</caption>
<colgroup><col class="left"><col class="right"><col class="left"><col
class="left"><col class="left">
</colgroup>
<thead>
<tr>
<th scope="col" class="left">Scheduled Tasks</th>
<th scope="col" class="right">Expected</th>
<th scope="col" class="left">Actual</th>
<th scope="col" class="left">Campaign</th>
<th scope="col" class="left">Beam</th>
</tr>
<tr>
<th scope="col" class="left"><br>
</th>
<th scope="col" class="right">Duration</th>
<th scope="col" class="left"><br>
</th>
<th scope="col" class="left"><br>
</th>
<th scope="col" class="left">Termination</th>
</tr>
<tr>
<th scope="col" class="left"><br>
</th>
<th scope="col" class="right">(h)</th>
<th scope="col" class="left"><br>
</th>
<th scope="col" class="left"><br>
</th>
<th scope="col" class="left"><br>
</th>
</tr>
</thead>
<tbody>
<tr>
<td class="left">Initial fOpts/Allsaves</td>
<td class="right">0.5</td>
<td class="left"><br>
</td>
<td class="left">Program</td>
<td class="left">B & C</td>
</tr>
<tr>
<td class="left"><a
href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/11932">C100:
Rad. Test</a></td>
<td class="right">2</td>
<td class="left"><br>
</td>
<td class="left">C100</td>
<td class="left">INJ</td>
</tr>
<tr>
<td class="left"><a
href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/11955">Inj
M<sub>56</sub> setup</a></td>
<td class="right">8</td>
<td class="left"><br>
</td>
<td class="left">Program</td>
<td class="left">Halls→ Inj→ Halls</td>
</tr>
<tr>
<td class="left"><a
href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/11979">PEPPo
Mag Test</a></td>
<td class="right">1</td>
<td class="left"><br>
</td>
<td class="left">PEPPo</td>
<td class="left">Inj</td>
</tr>
<tr>
<td class="left">Restoration</td>
<td class="right">2</td>
<td class="left"><br>
</td>
<td class="left">Program<br>
</td>
<td class="left">B&C</td>
</tr>
</tbody>
<tbody>
<tr>
<td class="left">Parasitic Hours</td>
<td class="right">-2</td>
<td class="left"><br>
</td>
<td class="left"><br>
</td>
<td class="left"><br>
</td>
</tr>
</tbody>
<tbody>
<tr>
<td class="left">Total</td>
<td class="right">11.5</td>
<td class="left"><br>
</td>
<td class="left"><br>
</td>
<td class="left"><br>
</td>
</tr>
</tbody>
</table>
<br>
<pre class="moz-signature" cols="72">--
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab Office: (757) 269-6268
12000 Jefferson Avenue Cell: (757) 876-6289
Newport News, VA 23606 Email: <a class="moz-txt-link-abbreviated" href="mailto:freyberg@jlab.org">freyberg@jlab.org</a>
</pre>