Beam Studies aficionados: <br>
<br>
With ~12more weeks left in the run, or 144 hours of beam studies.
It is worth while to see if you are going to reach your goals and
if so how much time you will need. This will help in setting
priority but also will provide some estimate for Physics side if
there is to be any beam studies time left on the table.<br>
<br>
While I am sure everyone has their own goals, in my mind the goals
are roughly:<br>
<ul>
<li>C100: both operating at as high a gradient as possible,
hopefully above 98MeV</li>
<li>PEPPo: beamline fully commissioned, DAQ commissioned ready for
experiment</li>
<li>Modelling: At least one (hopefully two?) iteration on
measuring the body gradient in one arc and putting that into the
model, re-match, download and see if the matching quads are
closer to design</li>
<li>Mott: Get as close to a establishing a 1% measurement as
possible</li>
</ul>
<p><br>
Since the C100 is close to being a parasitic only campaign at this
point, I suspect the bulk of the remaining beam studies will be
modelling and PEPPo.<br>
</p>
<p>If I could have your estimates by end of day Monday that would be
very helpful. I have yet to work out the plan for this
Wednesday, I hope to have that completed by Monday as well.</p>
<p>Thanks and enjoy the Weekend!<br>
Arne<br>