<html>
<head>
<meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
</head>
<body>
<title>BTeam-2012-02-21</title>
BTeamers,<br>
<br>
Here is the agenda for today's meeting -- see you in MCC at 11!
Cheers!<br>
<br>
-Todd<br>
<h1 class="title">BTeam 2012-02-21</h1>
<div class="outline-2">
<h2 id="sec-1">1 Optics on Call Report/Schedule</h2>
<ul>
<li>14 Feb-21 Feb: Fanglei/Mike Spata<br>
<ul>
<li><span class="todo">TODO</span> 5-pass spin-up started
Mon Feb 13 (later close to achieved owl Thu Feb 16, <a
href="http://cebaf.jlab.org/elog/entry/1665362">e1665362</a>)<br>
<ul>
<li>
Hot spot in 6R (<a
href="http://cebaf.jlab.org/elog/entry/1665034">e1665034</a>)
from Mon Feb 13 setup; some problems with
pathlength/arc dipole adjustments
</li>
</ul>
</li>
<li>Injector 3-beam, polarity setups in process Day Tue Feb
14<br>
</li>
<li>RSEP8 spare is in place for spin-up<br>
</li>
<li>~24 Feb Hall A g2p start? 20 Feb? Who knows? (Yves)<br>
</li>
<li><span class="todo">TODO</span> SL MOMOD not restored to
operation, still possible LO problems (<a
href="http://cebaf.jlab.org/elog/entry/1664255">e1664255</a>);
NL MOMOD repaired<br>
<ul>
<li>
Tief: SL system still not working properly, likely to
be failure in AM setup for breadboarded SL MOMOD
</li>
<li>
Perhaps SL MOMOD breadboard can have AM re-nulled to
limit Hall C sensitivity to SL MOMOD (energy
modulation)
</li>
</ul>
</li>
<li><span class="todo">TODO</span> Address hall B orbit lock
issues (<a href="http://cebaf.jlab.org/elog/entry/1664282">e1664282</a>)<br>
<ul>
<li>
Michele: Looks more like a nA BPM problem,
Alicia/Keith Cole working on this; deadband too big,
being changed
</li>
<li>
Hall B beam returns Thu PM Feb 16 into Fri Feb 17
</li>
<li>
Beam scraping monitor being decommissioned
</li>
</ul>
</li>
</ul>
</li>
<li>21 Feb-28 Feb: Todd/Jay<br>
</li>
<li>28 Feb-06 Mar: Rui/Tief<br>
</li>
<li>06 Mar-13 Mar: Vasily/Yves<br>
</li>
<li>13 Mar-20 Mar: Balsa/Alex<br>
</li>
<li>20 Mar-27 Mar: Yuhong/Geoff<br>
</li>
<li>27 Mar-03 Apr: Ed/Todd<br>
</li>
<li>03 Apr-10 Apr: Fanglei/Mike<br>
</li>
</ul>
</div>
<div class="outline-2">
<h2 id="sec-2">2 Injector Chicane m56 (Alex/Geoff)</h2>
<ul>
<li>Alex has a new slide available <a
href="http://www.toddsatogata.net/BTeam/2012-02-18-InjectorM56Longitudinal-AlexBogacz.ppt">here</a>
; Geoff wrote a note on injector M56 available <a
href="http://www.toddsatogata.net/BTeam/2012-02-20-OptimizationOfM56-GeoffKrafft.ppt">here</a>.<br>
</li>
<li>Alex's slide shows an initial longitudinal chirp that fits
the 12 degree 0L04 phasing experience<br>
</li>
<li><span class="todo">TODO</span> Repair Yao cavity for bunch
length measurements coming out of injector<br>
</li>
<li><span class="todo">TODO</span> Assemble team to address and
study this for the long term (including injector upgrade
plans?)<br>
</li>
</ul>
</div>
<div class="outline-2">
<h2 id="sec-3">3 Pathlength and MOMOD (Tief)</h2>
</div>
<div class="outline-2">
<h2 id="sec-4">4 Strategizing for Remainder of Run (Arne/Todd)</h2>
<ul>
<li>~12 weeks, ~144h of beam studies remaining in 6 GeV era<br>
</li>
<li>C100 campaign mostly parasitic at this point<br>
</li>
<li>Arne is collecting input to estimate, prioritize remaining
studies<br>
</li>
</ul>
</div>
<div class="outline-2">
<h2 id="sec-5">5 Beam Studies Report 13-15 Feb 2012 (Mon-Weds)</h2>
<ul>
<li>Many opportunistic beam studies were performed during the
Hall C Burn-Thru Detector investigation<br>
</li>
<li>Many PEPPo items (<a
href="http://cebaf.jlab.org/elog/entry/1664892">e1664892</a>,<a
href="http://cebaf.jlab.org/elog/entry/1664893">e1664893</a>,<a
href="http://cebaf.jlab.org/elog/entry/1664893">e1664893</a>,<a
href="http://cebaf.jlab.org/elog/entry/1664894">e1664894</a>,<a
href="http://cebaf.jlab.org/elog/entry/1664895">e1664895</a>,<a
href="http://cebaf.jlab.org/elog/entry/1664896">e1664896</a>,<a
href="http://cebaf.jlab.org/elog/entry/1664898">e1664898</a>,<a
href="http://cebaf.jlab.org/elog/entry/1664899">e1664899</a>)<br>
</li>
<li>Many Mott items (<a
href="http://cebaf.jlab.org/elog/entry/1665088">e1665088</a>,<a
href="http://cebaf.jlab.org/elog/entry/1665091">e1665091</a>,<a
href="http://cebaf.jlab.org/elog/entry/1665101">e1665101</a>,<a
href="http://cebaf.jlab.org/elog/entry/1665112">e1665112</a>,<a
href="http://cebaf.jlab.org/elog/entry/1665492">e1665492</a>)<br>
</li>
<li>Several Modeling items (arc4 <a
href="http://cebaf.jlab.org/elog/entry/1665390">e1665390</a>
with BPM problems, arc6 <a
href="http://cebaf.jlab.org/elog/entry/1665398">e1665398</a>
needs to be redone with resample on)<br>
</li>
<li>Zigzag harp at IHA0L07 (<a
href="http://cebaf.jlab.org/elog/entry/1665356">e1665356</a>)<br>
</li>
<li>Yao system evaluation (<a
href="http://cebaf.jlab.org/elog/entry/1665501">e1665501</a>,
Yao at start of NL needs retuning <a
href="https://cebaf.jlab.org/atlis/task/12049">a12049</a>,
will impact m56 studies)<br>
</li>
</ul>
</div>
<div class="outline-2">
<h2 id="sec-6">6 Beam Studies Planning 08:30 22 Feb 2012
(Wednesday)</h2>
<ul>
<li>
<b>[<span style="visibility:hidden;">X</span>]</b> —— 0.5
Optics: fOpts/allsaves
</li>
<li>
<b>[<span style="visibility:hidden;">X</span>]</b> <a
href="https://cebaf.jlab.org/atlis/task/11152">a11152</a>
2.0 Model: MO wavelength change (Tief, to dumplettes)
</li>
<li>
<b>[<span style="visibility:hidden;">X</span>]</b> <a
href="https://cebaf.jlab.org/atlis/task/9741">a9741</a> 1.0
Model: Arc 3/4 RayTrace vs CS (Tief/Ryan, to dumplettes)
</li>
<li>
<b>[<span style="visibility:hidden;">X</span>]</b> <a
href="https://cebaf.jlab.org/atlis/task/11695">a11695</a>
2.0 C100: Training (Curt et al, beam to Inj, 12:00-14:00)
</li>
<li>
<b>[<span style="visibility:hidden;">X</span>]</b> —— 2.0
PEPPo: Development parisitic to C100 training
</li>
<li>
<b>[<span style="visibility:hidden;">X</span>]</b> <a
href="https://cebaf.jlab.org/atlis/task/11997">a11997</a>
0.5 Model: RayTrace to/through Hall C (Tief/Ryan, to C)
</li>
<li>
<b>[<span style="visibility:hidden;">X</span>]</b> <a
href="https://cebaf.jlab.org/atlis/task/11933">a11933</a>
0.5 Model: Long Pulse Width Test (Tief, to C, high current)
</li>
<li>
<b>[<span style="visibility:hidden;">X</span>]</b> —— 1.5
Optics: Restoration
</li>
</ul>
<p>======================================================================
</p>
</div>
<div class="outline-2">
<h2 id="sec-7">7 Measuring Bunch Length using 1A Sync Light
Monitor (Tief)</h2>
<ul>
<li>New BTeam elog entry on this procedure: <a
href="https://cebaf.jlab.org/elog/entry/1661304">e1661304</a><br>
</li>
<li><span class="todo">TODO</span> Prioritize and projectize for
long down (12 GeV cameras, Arne)<br>
</li>
</ul>
</div>
<div class="outline-2">
<h2 id="sec-8">8 Improvements to Krest vs manual cresting, impact
in 12 GeV era (Noel/Jay)</h2>
</div>
<div class="outline-2">
<h2 id="sec-9">9 Hall C compton orbit lock missing DOF
(Mark/Jay/Yves/Alicia)</h2>
</div>
<div class="outline-2">
<h2 id="sec-10">10 Online pathlength prototyping before long
shutdown (Tief)</h2>
</div>
<div class="outline-2">
<h2 id="sec-11">11 Injector bunch length, m56 optimization group
(Geoff/Alex/Reza/Todd)</h2>
</div>
<meta http-equiv="Content-Type" content="text/html;
charset=ISO-8859-1">
<meta name="generator" content="Org-mode">
<meta name="generated" content="2012/02/21 08:40:24">
<meta name="author" content="Todd Satogata">
<style type="text/css">
html {
font-family: Times, serif;
font-size: 12pt;
}
.title { text-align: center; }
.todo { color: red; }
.done { color: green; }
.timestamp { color: grey }
.timestamp-kwd { color: CadetBlue }
.tag { background-color:lightblue; font-weight:normal }
.target { background-color: lavender; }
pre {
border: 1pt solid #AEBDCC;
background-color: #F3F5F7;
padding: 5pt;
font-family: courier, monospace;
}
table { border-collapse: collapse; }
td, th {
vertical-align: top;
<!--border: 1pt solid #ADB9CC;-->
}
</style>
</body>
</html>