    BTeamers,<br>
    <br>
    Here are the notes from last Tuesday's meeting. We have beam studies
    today<br>
    as detailed in Arne's email, so today's meeting may well be short
    depending<br>
    on MCC activities. See you in the MCC meeting room at 11!<br>
    <br>
    -Todd<br>
    <h1 class="title">BTeam-2012-02-21</h1>
    <div class="outline-2">
      <h2 id="sec-1">1 Optics on Call Report/Schedule</h2>
      <ul>
        <li>14 Feb-21 Feb: Fanglei/Mike Spata<br>
          <ul>
            <li><span class="todo">TODO</span> 5-pass spin-up started
              Mon Feb 13 (later close to achieved owl Thu Feb 16, <a
                href="http://cebaf.jlab.org/elog/entry/1665362">e1665362</a>)<br>
              <ul>
                <li>
                  Hot spot in 6R (<a
                    href="http://cebaf.jlab.org/elog/entry/1665034">e1665034</a>)
                  from Mon Feb 13 setup; some problems with
                  pathlength/arc dipole adjustments
                </li>
                <li>
                  Really about 4-pass done so far, 5th pass still needs
                  setup but question about energy (1e-3 level)
                </li>
                <li>
                  Hot spot was really inline dump (150 uA for many
                  hours) and not adjacent dipole, now limited to 0.5h
                  (/shift?)
                </li>
                <li>
                  ARC4 offset by 3.5 mm, pathlength needs to be
                  revisited (see Weds Feb 22 studies plan to adjust MO)
                </li>
              </ul>
            </li>
            <li>Injector 3-beam, polarity setups in process Day Tue Feb
              14<br>
            </li>
            <li>RSEP8 spare is in place for spin-up<br>
            </li>
            <li>~24 Feb Hall A g2p start? 20 Feb? Who knows? (Yves)<br>
            </li>
            <li><span class="todo">TODO</span> SL MOMOD not restored to
              operation, still possible LO problems (<a
                href="http://cebaf.jlab.org/elog/entry/1664255">e1664255</a>);
              NL MOMOD repaired<br>
              <ul>
                <li>
                  Tief: SL system still not working properly, likely to
                  be failure in AM setup for breadboarded SL MOMOD
                </li>
                <li>
                  Perhaps SL MOMOD breadboard can have AM re-nulled to
                  limit Hall C sensitivity to SL MOMOD (energy
                  modulation)
                </li>
                <li>
                  20 min interruption for John to remove, another to
                  replace; coordinate with C100 recovery training?
                </li>
              </ul>
            </li>
            <li><span class="todo">TODO</span> Address hall B orbit lock
              issues (<a href="http://cebaf.jlab.org/elog/entry/1664282">e1664282</a>)<br>
              <ul>
                <li>
                  Michele: Looks more like a nA BPM problem,
                  Alicia/Keith Cole working on this; deadband too big,
                  being changed
                </li>
                <li>
                  Hall B beam returns Thu PM Feb 16 into Fri Feb 17
                </li>
                <li>
                  Beam scraping monitor being decommissioned
                </li>
                <li>
                  Still offline, ATLis in place for testing after
                  electron run (Keith)
                </li>
              </ul>
            </li>
            <li><span class="todo">TODO</span> Traditional CMPQ (OptiM
              vs elegant) completely disagree: resolve path forward for
              present run and 12 GeV (Yves/Todd/AHLA)<br>
            </li>
          </ul>
        </li>
        <li>21 Feb-28 Feb: Todd/Jay<br>
          <ul>
            <li><span class="todo">TODO</span> Hall A returning ~Feb 27
              but still uncertainty at level of o(3d)<br>
            </li>
            <li><span class="todo">TODO</span> Modify MST for Hall A,
              prepare for hall commissioning (Yves/Jay)<br>
            </li>
            <li><span class="todo">TODO</span> Hall C compton lock
              clarification (Jay/Alicia/AHLA)<br>
            </li>
            <li><span class="done">DONE</span> Injector m56 lattice to
              AHLA (Yves, done 2012-02-21 PM)<br>
            </li>
            <li><span class="todo">TODO</span> Dennis Turner working on
              RF health check over ~1shift time period; check vs 0R03
              trips? (Jay)<br>
            </li>
            <li><span class="todo">TODO</span> Capture forward power
              degrading? (Yan/Clyde)<br>
            </li>
          </ul>
        </li>
        <li>28 Feb-06 Mar: Rui/Tief<br>
        </li>
        <li>06 Mar-13 Mar: Vasily/Yves<br>
        </li>
        <li>13 Mar-20 Mar: Balsa/Alex<br>
        </li>
        <li>20 Mar-27 Mar: Yuhong/Geoff<br>
        </li>
        <li>27 Mar-03 Apr: Ed/Todd<br>
        </li>
        <li>03 Apr-10 Apr: Fanglei/Mike<br>
        </li>
      </ul>
    </div>
    <div class="outline-2">
      <h2 id="sec-2">2 Injector Chicane m56 (Alex/Geoff)</h2>
      <ul>
        <li>Alex has a new slide available <a
href="http://www.toddsatogata.net/BTeam/2012-02-18-InjectorM56Longitudinal-AlexBogacz.ppt">here</a>
          ; Geoff wrote a note on injector M56 available <a
href="http://www.toddsatogata.net/BTeam/2012-02-20-OptimizationOfM56-GeoffKrafft.pdf">here</a>.<br>
        </li>
        <li>Alex's slide shows an initial longitudinal chirp that fits
          the 12 degree 0L04 phasing experience<br>
        </li>
        <li>Reza states that 1/4 cryo has been running off crest 14
          degrees (ish) for this entire run<br>
          <ul>
            <li>
              This seems at least not inconsistent with Alex's
              calculations
            </li>
          </ul>
        </li>
        <li><span class="todo">TODO</span> Retune Yao cavity for bunch
          length measurements coming out of injector<br>
          <ul>
            <li>
              Opportunistic retune (Steve/Arne), though Mon Feb 20
              current-dependent 0R03 trips might indicate some bunch
              length/halo issues (Tief)
            </li>
            <li>
              No phases were intentionally changed during various recent
              spin setups, though some tail being folded in (Reza)
            </li>
          </ul>
        </li>
        <li><span class="todo">TODO</span> Assemble team to address and
          study this for the long term (including injector upgrade
          plans?)<br>
        </li>
      </ul>
    </div>
    <div class="outline-2">
      <h2 id="sec-3">3 Pathlength and MOMOD (Tief)</h2>
    </div>
    <div class="outline-2">
      <h2 id="sec-4">4 Strategizing for Remainder of Run (Arne/Todd)</h2>
      <ul>
        <li>~12 weeks, ~144h of beam studies remaining in 6 GeV era<br>
        </li>
        <li>C100 campaign mostly parasitic at this point<br>
        </li>
        <li>Arne is collecting input to estimate, prioritize remaining
          studies<br>
          <ul>
            <li>
              Have input from modeling, will get input from PEPPo soon
            </li>
            <li>
              Physics wants to know how much time they'll get if we
              don't expect to use all projected beam study time
            </li>
            <li>
              Spata happy with present status/projections of campaigns
              for 12 GeV commissioning (particularly C100)
            </li>
          </ul>
        </li>
      </ul>
    </div>
    <div class="outline-2">
      <h2 id="sec-5">5 Beam Studies Report 13-15 Feb 2012 (Mon-Weds)</h2>
      <ul>
        <li>Many opportunistic beam studies were performed during the
          Hall C Burn-Thru Detector investigation<br>
        </li>
        <li>Many PEPPo items (<a
            href="http://cebaf.jlab.org/elog/entry/1664892">e1664892</a>,<a
            href="http://cebaf.jlab.org/elog/entry/1664893">e1664893</a>,<a
            href="http://cebaf.jlab.org/elog/entry/1664893">e1664893</a>,<a
            href="http://cebaf.jlab.org/elog/entry/1664894">e1664894</a>,<a
            href="http://cebaf.jlab.org/elog/entry/1664895">e1664895</a>,<a
            href="http://cebaf.jlab.org/elog/entry/1664896">e1664896</a>,<a
            href="http://cebaf.jlab.org/elog/entry/1664898">e1664898</a>,<a
            href="http://cebaf.jlab.org/elog/entry/1664899">e1664899</a>)<br>
        </li>
        <li>Many Mott items (<a
            href="http://cebaf.jlab.org/elog/entry/1665088">e1665088</a>,<a
            href="http://cebaf.jlab.org/elog/entry/1665091">e1665091</a>,<a
            href="http://cebaf.jlab.org/elog/entry/1665101">e1665101</a>,<a
            href="http://cebaf.jlab.org/elog/entry/1665112">e1665112</a>,<a
            href="http://cebaf.jlab.org/elog/entry/1665492">e1665492</a>)<br>
        </li>
        <li>Several Modeling items (arc4 <a
            href="http://cebaf.jlab.org/elog/entry/1665390">e1665390</a>
          with BPM problems, arc6 <a
            href="http://cebaf.jlab.org/elog/entry/1665398">e1665398</a>
          needs to be redone with resample on)<br>
        </li>
        <li>Zigzag harp at IHA0L07 (<a
            href="http://cebaf.jlab.org/elog/entry/1665356">e1665356</a>)<br>
        </li>
        <li>Yao system evaluation (<a
            href="http://cebaf.jlab.org/elog/entry/1665501">e1665501</a>,
          Yao at start of NL needs retuning <a
            href="https://cebaf.jlab.org/atlis/task/12049">a12049</a>,
          will impact m56 studies)<br>
        </li>
      </ul>
    </div>
    <div class="outline-2">
      <h2 id="sec-6">6 Beam Studies Planning 08:30 22 Feb 2012
        (Wednesday)</h2>
      <ul>
        <li>
          <b>[<span style="visibility:hidden;">X</span>]</b> —— 0.5
          Optics: fOpts/allsaves
        </li>
        <li>
          <b>[<span style="visibility:hidden;">X</span>]</b> <a
            href="https://cebaf.jlab.org/atlis/task/11152">a11152</a>
          2.0 Program: MO wavelength change/change doglegs/multipass
          ORFP (Tief, to dumplettes)
        </li>
        <li>
          <b>[<span style="visibility:hidden;">X</span>]</b> <a
            href="https://cebaf.jlab.org/atlis/task/9741">a9741</a> —
          Model: Arc 3/4 RayTrace vs CS (Tief/Ryan, to dumplettes;
          bump?)
        </li>
        <li>
          <b>[<span style="visibility:hidden;">X</span>]</b> —— 1.0
          Program: SL MO remove/repair/replace (John Musson/Tief, ATLis
          in place)
        </li>
        <li>
          <b>[<span style="visibility:hidden;">X</span>]</b> <a
            href="https://cebaf.jlab.org/atlis/task/11695">a11695</a>
          2.0 C100: Training (Curt et al, beam to Inj, 12:00-14:00)
        </li>
        <li>
          <b>[<span style="visibility:hidden;">X</span>]</b> —— 2.0
          PEPPo: Development parisitic to C100 training
        </li>
        <li>
          <b>[<span style="visibility:hidden;">X</span>]</b> <a
            href="https://cebaf.jlab.org/atlis/task/11997">a11997</a>
          0.5 Model: RayTrace to/through Hall C (Tief/Ryan, to C)
        </li>
        <li>
          <b>[<span style="visibility:hidden;">X</span>]</b> <a
            href="https://cebaf.jlab.org/atlis/task/11933">a11933</a>
          0.5 Model: Long Pulse Width Test (Tief, to C, high current)
        </li>
        <li>
          <b>[<span style="visibility:hidden;">X</span>]</b> —— 1.5
          Optics: Restoration (Continue with multipass ORFP, at least
          3-pass)
        </li>
      </ul>
      <p>======================================================================
      </p>
    </div>
    <div class="outline-2">
      <h2 id="sec-7">7 Measuring Bunch Length using 1A Sync Light
        Monitor (Tief)</h2>
      <ul>
        <li>New BTeam elog entry on this procedure: <a
            href="https://cebaf.jlab.org/elog/entry/1661304">e1661304</a><br>
        </li>
        <li><span class="todo">TODO</span> Prioritize and projectize for
          long down (12 GeV cameras, Arne)<br>
        </li>
      </ul>
    </div>
    <div class="outline-2">
      <h2 id="sec-8">8 Improvements to Krest vs manual cresting, impact
        in 12 GeV era (Noel/Jay)</h2>
    </div>
    <div class="outline-2">
      <h2 id="sec-9">9 Hall C compton orbit lock missing DOF
        (Mark/Jay/Yves/Alicia)</h2>
    </div>
    <div class="outline-2">
      <h2 id="sec-10">10 Online pathlength prototyping before long
        shutdown (Tief)</h2>
    </div>
    <div class="outline-2">
      <h2 id="sec-11">11 Injector bunch length, m56 optimization group
        (Geoff/Alex/Reza/Todd)</h2>
    </div>
    <div class="outline-2">
      <h2 id="sec-12">12 Upgrade ARC1 fOpt correctors? (Spata's
        dissertation correctors could be used, currently in 6T)</h2>
    </div>
    <div id="postamble"><br>
    </div>
    <meta http-equiv="Content-Type" content="text/html;
      charset=ISO-8859-1">
    <meta name="generator" content="Org-mode">
    <meta name="generated" content="2012/02/28 08:43:26">
    <meta name="author" content="Todd Satogata">
    <style type="text/css">
  html {
        font-family: Times, serif;
        font-size: 12pt;
  }
  .title { text-align: center; }
  .todo  { color: red; }
  .done { color: green; }
  .timestamp { color: grey }
  .timestamp-kwd { color: CadetBlue }
  .tag { background-color:lightblue; font-weight:normal }
  .target { background-color: lavender; }
  pre {
        border: 1pt solid #AEBDCC;
        background-color: #F3F5F7;
        padding: 5pt;
        font-family: courier, monospace;
  }
  table { border-collapse: collapse; }
  td, th {
        vertical-align: top;
        <!--border: 1pt solid #ADB9CC;-->
  }
</style>
  </body>
</html>