<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
  </head>
  <body>
    <title>BTeam-2012-03-27</title>
    BTeamers,<br>
    <br>
    Here are the notes from last Tuesday's BTeam meeting. Since we have
    beam studies<br>
    scheduled this week on Tuesday to align with Hall B activities, and
    several people<br>
    will be very busy with those studies at the usual meeting time,
    there is no BTeam<br>
    meeting tomorrow, Apr 3. BTeam will resume on Apr 10. Please send me
    any comments<br>
    or items you would like included in that agenda.<br>
    <br>
    -Todd<br>
    <h1 class="title">BTeam-2012-03-27</h1>
    <div class="outline-2">
      <h2 id="sec-1">1 Optics on Call Report/Schedule</h2>
      <ul>
        <li>20 Mar-27 Mar: Fanglei/Geoff (swaped Yuhong to 10-17 Apr)<br>
          <ul>
            <li><span class="done">DONE</span> ? C100: 2L24 back to 90,
              Weds 21 Mar hope to go to 95; 2L25 at 65 (?)<br>
            </li>
            <li>C100 recovery procedures are work in progress; Terry
              Carlino working on screens for ops<br>
              <ul>
                <li>
                  This includes HV status when turning HV on (and only
                  some of four HV really are up)
                </li>
                <li>
                  From end of Weds beam studies to Sat vac event, each
                  C100 took out ~8h in recovery time
                </li>
                <li>
                  Speediest recovery time ~10 min at present
                </li>
                <li>
                  Shift program priority from high gradient to optimum
                  speed of recovery (lower gradient=>lower trip rate)
                </li>
              </ul>
            </li>
            <li>Pass change was expected for Thu 22 Mar Day but 5-pass
              was problematic<br>
            </li>
            <li>Heat/activate on Mon 26 Mar (10h+), found arc9
              quadrupole trim card bad (<a
                href="https://cebaf.jlab.org/elog/entry/1717552">e1717552</a>)<br>
              <ul>
                <li>
                  Tief also found BPM response problems (<a
                    href="https://cebaf.jlab.org/elog/entry/1717544">e1717544</a>)
                  (Pete supercal'd)
                </li>
                <li>
                  TODO Scale factor in EPICS needs to be checked for
                  0R04 BPM (m15 can type, 18.81 scale factor; Tief,
                  Brian Bevens)
                </li>
                <li>
                  Tief backed out of MO FM input changes (<a
                    href="https://cebaf.jlab.org/elog/entry/1717582">e1717582</a>;
                  doubled phase noise wrt 1497 line, outside C100
                  target)
                </li>
              </ul>
            </li>
            <li>Outstanding pathlength scope issues from previous
              meetings<br>
              <ul>
                <li>
                  DONE NL pathlength scope doesn't visibly change when
                  changing SL pathlength (repaired)
                </li>
                <li>
                  TODO Pathlength system sensitivity issue, biases?
                  (Musson)
                </li>
                <li>
                  TODO Phase knob for NL pathlength scope is
                  non-functional; SL works. (Musson/Tief)
                </li>
                <li>
                  TODO Complete setup of NL pathlength for 5-pass, since
                  present setup is not finalized
                </li>
                <li>
                  NL pathlength had been off o(10 degrees!) for entire
                  run up to recent NL pathlength repair ! (cabling, RF
                  coupling)
                </li>
              </ul>
            </li>
            <li>Yves available for LOCO measurements next week (see
              opportunistic beam studies)<br>
            </li>
            <li><span class="todo">TODO</span> Traditional CMPQ (OptiM
              vs elegant) completely disagree:<br>
              resolve path forward for present run and 12 GeV
              (Yves/Todd/AHLA)
            </li>
          </ul>
        </li>
        <li>27 Mar-03 Apr: Ed/Todd<br>
          <ul>
            <li>5-pass setup PM Tue 27 Mar for hall B (started ~1100,
              with 3-beam setup)<br>
            </li>
          </ul>
        </li>
        <li>03 Apr-10 Apr: Todd/Jay (swapped with Yuhong/Mike 10-17 Apr)<br>
        </li>
      </ul>
    </div>
    <div class="outline-2">
      <h2 id="sec-2">2 Beam studies program strategy and priorities:
        less than 8 weeks calendar time left! (Arne Freyberger)</h2>
      <ul>
        <li>Energy change in last ~10 days of running; HC is nominally
          off but trying to come up with 3/4th pass program<br>
          <ul>
            <li>That type of program would potentially support
              interesting BBU studies (Todd in New Orleans May 15
              onward)<br>
            </li>
            <li>QWeak and Hall B have asked for run extensions; no
              yes/no from Mont yet (but likelihood trending downwards)<br>
            </li>
          </ul>
        </li>
      </ul>
    </div>
    <div class="outline-2">
      <h2 id="sec-3">3 More m56 compression and relieving 0L04 voltage
        (Alex Bogacz)</h2>
      <ul>
        <li>See attached slides<br>
        </li>
      </ul>
    </div>
    <div class="outline-2">
      <h2 id="sec-4">4 Current RayTrace Analysis using SVD (Ryan
        Bodenstein)</h2>
      <ul>
        <li>See attached slides<br>
        </li>
      </ul>
    </div>
    <div class="outline-2">
      <h2 id="sec-5">5 Beam Studies Planning for Tuesday Apr 3 (to align
        with Hall B down period)</h2>
    </div>
    <div class="outline-2">
      <h2 id="sec-6">6 Opportunistic beam studies:</h2>
      <ul>
        <li>
          <b>[<span style="visibility:hidden;">X</span>]</b> <a
            href="https://cebaf.jlab.org/atlis/task/12094">a12094</a>
          2.0 Model: calibration tests (LOCO) in Arc4 (Roblin)
        </li>
        <li>
          <b>[<span style="visibility:hidden;">X</span>]</b> <a
            href="https://cebaf.jlab.org/atlis/task/12095">a12095</a>
          2.0 Model: calibration tests (LOCO) in Arc6 (Roblin)
        </li>
        <li>
          <b>[<span style="visibility:hidden;">X</span>]</b> <a
            href="https://cebaf.jlab.org/atlis/task/12270">a12270</a>
          4.0 PEPPo: First CW beam (Grames)
        </li>
        <li>
          <b>[<span style="visibility:hidden;">X</span>]</b> <a
            href="https://cebaf.jlab.org/atlis/task/12231">a12231</a>
          2.0 Mott: Target variations (Suleiman)
        </li>
        <li>
          <b>[<span style="visibility:hidden;">X</span>]</b> <a
            href="https://cebaf.jlab.org/atlis/task/12235">a12235</a> —
          C100: SL24 HOM Baseline (Satogata/Shin)
        </li>
        <li>
          <b>[<span style="visibility:hidden;">X</span>]</b> <a
            href="https://cebaf.jlab.org/atlis/task/12267">a12267</a> —
          C100: SL25 C100 Test(3) </li>
      </ul>
      <p>======================================================================
      </p>
    </div>
    <div class="outline-2">
      <h2 id="sec-7">7 Measuring Bunch Length using 1A Sync Light
        Monitor (Tief)</h2>
      <ul>
        <li>New BTeam elog entry on this procedure: <a
            href="https://cebaf.jlab.org/elog/entry/1661304">e1661304</a><br>
        </li>
        <li><span class="todo">TODO</span> Prioritize and projectize for
          long down (12 GeV cameras, Arne)<br>
        </li>
      </ul>
    </div>
    <div class="outline-2">
      <h2 id="sec-8">8 Improvements to Krest vs manual cresting, impact
        in 12 GeV era (Noel/Jay)</h2>
    </div>
    <div class="outline-2">
      <h2 id="sec-9">9 Hall C compton orbit lock missing DOF
        (Mark/Jay/Yves/Alicia)</h2>
    </div>
    <div class="outline-2">
      <h2 id="sec-10">10 Online pathlength prototyping before long
        shutdown (Tief)</h2>
    </div>
    <div class="outline-2">
      <h2 id="sec-11">11 Injector bunch length and m56 optimization
        group (Geoff/Alex/Reza/Todd/Arne)</h2>
    </div>
    <div class="outline-2">
      <h2 id="sec-12">12 Upgrade ARC1 fOpt correctors? (Spata's
        dissertation correctors could be used, currently in 6T)</h2>
    </div>
    <div id="postamble">
      <p class="author"> Author: Todd Satogata
        <a href="mailto:satogata@Todd-Satogatas-MacBook-Pro.local"><satogata@Todd-Satogatas-MacBook-Pro.local></a>
      </p>
      <p class="date"> Date: 2012/04/02 09:56:42</p>
    </div>
    <meta http-equiv="Content-Type" content="text/html;
      charset=ISO-8859-1">
    <meta name="generator" content="Org-mode">
    <meta name="generated" content="2012/04/02 09:56:42">
    <meta name="author" content="Todd Satogata">
    <style type="text/css">
  html {
        font-family: Times, serif;
        font-size: 12pt;
  }
  .title { text-align: center; }
  .todo  { color: red; }
  .done { color: green; }
  .timestamp { color: grey }
  .timestamp-kwd { color: CadetBlue }
  .tag { background-color:lightblue; font-weight:normal }
  .target { background-color: lavender; }
  pre {
        border: 1pt solid #AEBDCC;
        background-color: #F3F5F7;
        padding: 5pt;
        font-family: courier, monospace;
  }
  table { border-collapse: collapse; }
  td, th {
        vertical-align: top;
        <!--border: 1pt solid #ADB9CC;-->
  }
</style>
  </body>
</html>