<html><head><style type='text/css'>p { margin: 0; }</style></head><body><div style='font-family: times new roman,new york,times,serif; font-size: 12pt; color: #000000'>Good morning,<div><br></div><div>The accelerator will remain open during day shifts through Saturday for recovery from the ZA magnet.</div><div><br></div><div>A strawman schedule for beam recovery on swing/owl <span style="font-size: 12pt;">starting on Tuesday is outlined below. Under this</span></div><div><span style="font-size: 12pt;">scenario LASO coverage will resume for tomorrow's swing shift with no day coverage until Sunday.</span></div><div><br></div><div>Mike<br><br><hr id="zwchr"><div style="color:#000;font-weight:normal;font-style:normal;text-decoration:none;font-family:Helvetica,Arial,sans-serif;font-size:12pt;"><b>From: </b>"Arne Freyberger" <freyberg@jlab.org><br><b>To: </b>"Michael Spata" <spata@jlab.org>, "Noel Okay" <okay@jlab.org>, "Paul Vasilauskis" <vasilaus@jlab.org>, "Ken Baggett" <baggett@jlab.org>, "lauze" <lauze@jlab.org>, "Bob May" <may@jlab.org>, "Kelly Mahoney" <mahoney@jlab.org>, "Steve Suhring" <suhring@jlab.org>, rmichaud@jlab.org, "Matt Bickley" <bickley@jlab.org>, "Fulvia Pilat" <pilat@jlab.org>, "Geoffrey Krafft" <krafft@jlab.org>, "Michael Tiefenback" <tiefen@jlab.org>, "Jay Benesch" <benesch@jlab.org><br><b>Sent: </b>Sunday, April 20, 2014 1:53:41 PM<br><b>Subject: </b>Schedule options<br><br>
  

    
  
  
    Last Monday we discussed the end-game and how to proceed.  Tuesday
    the ZA arc event occurred (Risk 2.2.1 Unknown hardware...).  Friday
    a subset of the CPT/B-team met to discuss the schedule options.  
    Tonight, I plan to send a status update email to CAB/lab
    leadership.     The email will be more or less a summary of my
    journal entry below, with  the addition that having explored two
    paths forward, continue with the 550MeV/linac setup or revert back
    to the 1000MeV/linac setup from the beginning of April (option
    1.2).   <b>I will recommend that we stay the course and finish the
      5.5pass setup at the 550MeV/linac setting (option 1.1).    </b>I
    think this gives the highest probability of success as it allows the
    hardware to be fully explored at the lower energy before pushing to
    910'ish MeV/linac.    In particular this approach provides time for
    the  shunt issued to be worked a bit longer (this is a  new risk
    since last Monday).    Both options  take about the same amount of
    time, although the schedule is not that detailed.<br>
    <br>
    If you see anything that should be adjusted, let me know.   I plan
    to transmit the email around 9pm tonight.<br>
    Arne<br>
    <div id="content">
      <h1 class="title">Schedule Options and ACC-II end-game decision
        flow</h1>
      <div id="outline-container-sec-1" class="outline-2">
        <h2 id="sec-1"><span class="section-number-2">1</span> Beam
          plans for remaining two weeks   <span class="tag"><span class="OPS">OPS</span></span></h2>
        <div class="outline-text-2" id="text-1">
          <p>
            <span class="timestamp-wrapper"><span class="timestamp"><2014-04-18
                Fri 13:33></span></span>
          </p>
        </div>
        <div id="outline-container-sec-1-1" class="outline-3">
          <h3 id="sec-1-1"><span class="section-number-3">1.1</span>
            550MeV/linac first option</h3>
          <div class="outline-text-3" id="text-1-1">
          </div>
          <div id="outline-container-sec-1-1-1" class="outline-4">
            <h4 id="sec-1-1-1"><span class="section-number-4">1.1.1</span>
              2014-04-21 Mon</h4>
            <div class="outline-text-4" id="text-1-1-1">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Open
                </dd>
                <dt> Day </dt>
                <dd>Open, repair, CHL1 trip/pump down test
                </dd>
                <dt> Swing </dt>
                <dd>TBD, PSS certs Hall-D segment
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-1-2" class="outline-4">
            <h4 id="sec-1-1-2"><span class="section-number-4">1.1.2</span>
              2014-04-22 Tue</h4>
            <div class="outline-text-4" id="text-1-1-2">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>TBD
                </dd>
                <dt> Day </dt>
                <dd>Open, repair
                </dd>
                <dt> Swing </dt>
                <dd>NL02-NL06 tests, Beam to 5R, PSS certs Hall-D
                  segment,
                  restore 550MeV/linac </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-1-3" class="outline-4">
            <h4 id="sec-1-1-3"><span class="section-number-4">1.1.3</span>
              2014-04-23 Wed</h4>
            <div class="outline-text-4" id="text-1-1-3">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Beam to 5R, restore 550MeV/linac, investigate
                  dispersion/BPM
                  issue, RF calibration
                </dd>
                <dt> Day </dt>
                <dd>Open repair
                </dd>
                <dt> Swing </dt>
                <dd>Beam to 2R, 550MeV/linac, RF Calibration
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-1-4" class="outline-4">
            <h4 id="sec-1-1-4"><span class="section-number-4">1.1.4</span>
              2014-04-24 Thu</h4>
            <div class="outline-text-4" id="text-1-1-4">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Beam to 2R, 550MeV/linac, RF Calibration
                </dd>
                <dt> Day </dt>
                <dd>Open repair
                </dd>
                <dt> Swing </dt>
                <dd>Beam to 2R, 550MeV/linac, RF Calibration
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-1-5" class="outline-4">
            <h4 id="sec-1-1-5"><span class="section-number-4">1.1.5</span>
              2014-04-25 Fri</h4>
            <div class="outline-text-4" id="text-1-1-5">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Beam to 2R, 550MeV/linac, RF Calibration
                </dd>
                <dt> Day </dt>
                <dd>Open repair
                </dd>
                <dt> Swing </dt>
                <dd>Beam to 2R, 550MeV/linac, RF Calibration
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-1-6" class="outline-4">
            <h4 id="sec-1-1-6"><span class="section-number-4">1.1.6</span>
              2014-04-26 Sat</h4>
            <div class="outline-text-4" id="text-1-1-6">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Beam to 5R, 550MeV/linac, ORFP </dd>
                <dt> Day </dt>
                <dd>Open repair
                </dd>
                <dt> Swing </dt>
                <dd>YR repairs complete, beam beyond 5R allowed
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-1-7" class="outline-4">
            <h4 id="sec-1-1-7"><span class="section-number-4">1.1.7</span>
              2014-04-27 Sun</h4>
            <div class="outline-text-4" id="text-1-1-7">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Push beam beyond 5R, 550 MeV/linac
                </dd>
                <dt> Day </dt>
                <dd>Beam to 6R
                </dd>
                <dt> Swing </dt>
                <dd>Beam to 7R
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-1-8" class="outline-4">
            <h4 id="sec-1-1-8"><span class="section-number-4">1.1.8</span>
              2014-04-28 Mon</h4>
            <div class="outline-text-4" id="text-1-1-8">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Push to 8R, 550 MeV/linac
                </dd>
                <dt> Day </dt>
                <dd>Push to 8R, pathlength
                </dd>
                <dt> Swing </dt>
                <dd>Beam to 8R
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-1-9" class="outline-4">
            <h4 id="sec-1-1-9"><span class="section-number-4">1.1.9</span>
              2014-04-29 Tue</h4>
            <div class="outline-text-4" id="text-1-1-9">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Push to 10R, 550 MeV/linac
                </dd>
                <dt> Day </dt>
                <dd>Push to 10R, authorization to go to D-dump?
                </dd>
                <dt> Swing </dt>
                <dd>Beam to 10R
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-1-10" class="outline-4">
            <h4 id="sec-1-1-10"><span class="section-number-4">1.1.10</span>
              2014-04-30 Wed</h4>
            <div class="outline-text-4" id="text-1-1-10">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Push to 5C dumplet, 550 MeV/linac
                </dd>
                <dt> Day </dt>
                <dd>Beam to 5C
                </dd>
                <dt> Swing </dt>
                <dd>Beam to 5C, evaluate pathlength and adjust
                  wavelength
                  and/or orbits to minimize
                  dogleg settings. </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-1-11" class="outline-4">
            <h4 id="sec-1-1-11"><span class="section-number-4">1.1.11</span>
              2014-05-01 Thu</h4>
            <div class="outline-text-4" id="text-1-1-11">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Push to D-dump @ 550MeV/linac
                </dd>
                <dt> Day </dt>
                <dd>Push to D-dump
                </dd>
                <dt> Swing </dt>
                <dd>Beam to D-dump at 550 MeV/linac
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-1-12" class="outline-4">
            <h4 id="sec-1-1-12"><span class="section-number-4">1.1.12</span>
              2014-05-02 Fri</h4>
            <div class="outline-text-4" id="text-1-1-12">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Change energy via scaling 550 MeV/linac to
                  910MeV/linac </dd>
                <dt> Day </dt>
                <dd>910 MeV/linac scaling, ORFP
                </dd>
                <dt> Swing </dt>
                <dd>910 MeV/linac scaling, ORFP
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-1-13" class="outline-4">
            <h4 id="sec-1-1-13"><span class="section-number-4">1.1.13</span>
              2014-05-03 Sat</h4>
            <div class="outline-text-4" id="text-1-1-13">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Demonstrate project goals
                </dd>
                <dt> Day </dt>
                <dd>Demonstrate project goals
                </dd>
                <dt> Swing </dt>
                <dd>Demonstrate project goals
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-1-14" class="outline-4">
            <h4 id="sec-1-1-14"><span class="section-number-4">1.1.14</span>
              2014-05-04 Sun</h4>
            <div class="outline-text-4" id="text-1-1-14">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Optics characterization
                </dd>
                <dt> Day </dt>
                <dd>Optics characterization
                </dd>
                <dt> Swing </dt>
                <dd>Optics characterization
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-1-15" class="outline-4">
            <h4 id="sec-1-1-15"><span class="section-number-4">1.1.15</span>
              2014-05-05 Mon – 2014-05-09 Fri</h4>
            <div class="outline-text-4" id="text-1-1-15">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Optics characterization
                </dd>
                <dt> Day </dt>
                <dd>Optics characterization
                </dd>
                <dt> Swing </dt>
                <dd>Optics characterization
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-1-16" class="outline-4">
            <h4 id="sec-1-1-16"><span class="section-number-4">1.1.16</span>
              2014-05-06 Tues – 2014-05-09 Fri</h4>
            <div class="outline-text-4" id="text-1-1-16">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Schedule Contingency
                </dd>
                <dt> Day </dt>
                <dd>Schedule Contingency
                </dd>
                <dt> Swing </dt>
                <dd>Schedule Contingency
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-1-17" class="outline-4">
            <h4 id="sec-1-1-17"><span class="section-number-4">1.1.17</span>
              2014-05-09 Fri</h4>
            <div class="outline-text-4" id="text-1-1-17">
              <ul class="org-ul">
                <li><b>Beam ends</b>
                </li>
              </ul>
            </div>
          </div>
        </div>
        <div id="outline-container-sec-1-2" class="outline-3">
          <h3 id="sec-1-2"><span class="section-number-3">1.2</span>
            1000MeV/linac early option</h3>
          <div class="outline-text-3" id="text-1-2">
          </div>
          <div id="outline-container-sec-1-2-1" class="outline-4">
            <h4 id="sec-1-2-1"><span class="section-number-4">1.2.1</span>
              2014-04-21 Mon</h4>
            <div class="outline-text-4" id="text-1-2-1">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Open
                </dd>
                <dt> Day </dt>
                <dd>Open, repair, CHL1 trip/pump down test
                </dd>
                <dt> Swing </dt>
                <dd>PSS certs Hall-D segment, TBD
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-2-2" class="outline-4">
            <h4 id="sec-1-2-2"><span class="section-number-4">1.2.2</span>
              2014-04-22 Tue</h4>
            <div class="outline-text-4" id="text-1-2-2">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>TBD
                </dd>
                <dt> Day </dt>
                <dd>Open, repair
                </dd>
                <dt> Swing </dt>
                <dd>NL02-NL06 tests, Beam to 5R, PSS certs Hall-D
                  segment,
                  restore 550MeV/linac? </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-2-3" class="outline-4">
            <h4 id="sec-1-2-3"><span class="section-number-4">1.2.3</span>
              2014-04-23 Wed</h4>
            <div class="outline-text-4" id="text-1-2-3">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Beam to 5R, restore 550MeV/linac, investigate
                  dispersion/BPM
                  issue, RF calibration
                </dd>
                <dt> Day </dt>
                <dd>Open repair
                </dd>
                <dt> Swing </dt>
                <dd>Beam to 2R, 550MeV/linac, RF Calibration
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-2-4" class="outline-4">
            <h4 id="sec-1-2-4"><span class="section-number-4">1.2.4</span>
              2014-04-24 Thu</h4>
            <div class="outline-text-4" id="text-1-2-4">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Beam to 2R, 550MeV/linac, RF Calibration
                </dd>
                <dt> Day </dt>
                <dd>Open repair
                </dd>
                <dt> Swing </dt>
                <dd>Beam to 2R, 550MeV/linac, RF Calibration
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-2-5" class="outline-4">
            <h4 id="sec-1-2-5"><span class="section-number-4">1.2.5</span>
              2014-04-25 Fri</h4>
            <div class="outline-text-4" id="text-1-2-5">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Beam to 2R, 550MeV/linac, RF Calibration
                </dd>
                <dt> Day </dt>
                <dd>Open repair
                </dd>
                <dt> Swing </dt>
                <dd>RF setup at 1000MeV/linac
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-2-6" class="outline-4">
            <h4 id="sec-1-2-6"><span class="section-number-4">1.2.6</span>
              2014-04-26 Sat</h4>
            <div class="outline-text-4" id="text-1-2-6">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Beam to 5R, 1000MeV/linac, ORFP </dd>
                <dt> Day </dt>
                <dd>Open repair
                </dd>
                <dt> Swing </dt>
                <dd>YR repairs complete, beam beyond 5R allowed
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-2-7" class="outline-4">
            <h4 id="sec-1-2-7"><span class="section-number-4">1.2.7</span>
              2014-04-27 Sun</h4>
            <div class="outline-text-4" id="text-1-2-7">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Push beam beyond 5R, 1000 MeV/linac
                </dd>
                <dt> Day </dt>
                <dd>Beam to 6R
                </dd>
                <dt> Swing </dt>
                <dd>Beam to 7R
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-2-8" class="outline-4">
            <h4 id="sec-1-2-8"><span class="section-number-4">1.2.8</span>
              2014-04-28 Mon</h4>
            <div class="outline-text-4" id="text-1-2-8">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Push to 8R, 1000 MeV/linac
                </dd>
                <dt> Day </dt>
                <dd>Push to 8R, pathlength?
                </dd>
                <dt> Swing </dt>
                <dd>Push to 8R
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-2-9" class="outline-4">
            <h4 id="sec-1-2-9"><span class="section-number-4">1.2.9</span>
              2014-04-29 Tue</h4>
            <div class="outline-text-4" id="text-1-2-9">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Beam to 8R
                </dd>
                <dt> Day </dt>
                <dd>Push to 10R, authorization to go to D-dump?
                </dd>
                <dt> Swing </dt>
                <dd>Push to 10R
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-2-10" class="outline-4">
            <h4 id="sec-1-2-10"><span class="section-number-4">1.2.10</span>
              2014-04-30 Wed</h4>
            <div class="outline-text-4" id="text-1-2-10">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Push to 10R, pathlength
                </dd>
                <dt> Day </dt>
                <dd>Beam to 10R </dd>
                <dt> Swing </dt>
                <dd>Push to 5C dumplet, 1000 MeV/linac
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-2-11" class="outline-4">
            <h4 id="sec-1-2-11"><span class="section-number-4">1.2.11</span>
              2014-05-01 Thu</h4>
            <div class="outline-text-4" id="text-1-2-11">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Push to 5C
                </dd>
                <dt> Day </dt>
                <dd>Beam to 5C
                </dd>
                <dt> Swing </dt>
                <dd>Push to Hall-D tagger dump </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-2-12" class="outline-4">
            <h4 id="sec-1-2-12"><span class="section-number-4">1.2.12</span>
              2014-05-02 Fri</h4>
            <div class="outline-text-4" id="text-1-2-12">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Push to Hall-D tagger dump
                </dd>
                <dt> Day </dt>
                <dd>Beam to Hall-D tagger dump
                </dd>
                <dt> Swing </dt>
                <dd>Demonstrate project Goals </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-2-13" class="outline-4">
            <h4 id="sec-1-2-13"><span class="section-number-4">1.2.13</span>
              2014-05-03 Sat</h4>
            <div class="outline-text-4" id="text-1-2-13">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Demonstrate project goals
                </dd>
                <dt> Day </dt>
                <dd>Demonstrate project goals
                </dd>
                <dt> Swing </dt>
                <dd>Optics characterization
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-2-14" class="outline-4">
            <h4 id="sec-1-2-14"><span class="section-number-4">1.2.14</span>
              2014-05-04 Sun</h4>
            <div class="outline-text-4" id="text-1-2-14">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Optics characterization
                </dd>
                <dt> Day </dt>
                <dd>Optics characterization
                </dd>
                <dt> Swing </dt>
                <dd>Optics characterization
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-2-15" class="outline-4">
            <h4 id="sec-1-2-15"><span class="section-number-4">1.2.15</span>
              2014-05-05 Mon</h4>
            <div class="outline-text-4" id="text-1-2-15">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Optics characterization
                </dd>
                <dt> Day </dt>
                <dd>Optics characterization
                </dd>
                <dt> Swing </dt>
                <dd>Schedule contingency
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-2-16" class="outline-4">
            <h4 id="sec-1-2-16"><span class="section-number-4">1.2.16</span>
              2014-05-06 Tues – 2014-05-09 Fri</h4>
            <div class="outline-text-4" id="text-1-2-16">
              <dl class="org-dl">
                <dt> Owl </dt>
                <dd>Schedule Contingency
                </dd>
                <dt> Day </dt>
                <dd>Schedule Contingency
                </dd>
                <dt> Swing </dt>
                <dd>Schedule Contingency
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-1-2-17" class="outline-4">
            <h4 id="sec-1-2-17"><span class="section-number-4">1.2.17</span>
              2014-05-09 Fri</h4>
            <div class="outline-text-4" id="text-1-2-17">
              <p>
                <b>Beam ends</b>
              </p>
            </div>
          </div>
        </div>
      </div>
      <div id="outline-container-sec-2" class="outline-2">
        <h2 id="sec-2"><span class="section-number-2">2</span> AccII
          Decision Tree   <span class="tag"><span class="OPS">OPS</span></span></h2>
        <div class="outline-text-2" id="text-2">
          <p>
            <span class="timestamp-wrapper"><span class="timestamp"><2014-04-11
                Fri 11:30></span></span>
            What if things do not go well in the next three weeks? How
            to make
            decision on beam operations after <span class="timestamp-wrapper"><span class="timestamp">[2014-05-02
                Fri]</span></span>.
          </p>
        </div>
        <div id="outline-container-sec-2-1" class="outline-3">
          <h3 id="sec-2-1"><span class="section-number-3">2.1</span>
            Project Milestones</h3>
          <div class="outline-text-3" id="text-2-1">
            <dl class="org-dl">
              <dt> MS-02A-03 </dt>
              <dd>Beam delivered to 5C dumplet with energy greater
                than 10GeV. Project date: 2013-12-31 Tue
              </dd>
              <dt> MS-03P-25 </dt>
              <dd>Beam delivered to the Tagger Vault with energy
                greater than 10GeV. Project Date: on or before
                2014-04-14 Mon
              </dd>
            </dl>
          </div>
        </div>
        <div id="outline-container-sec-2-2" class="outline-3">
          <h3 id="sec-2-2"><span class="section-number-3">2.2</span>
            Risk Registry</h3>
          <div class="outline-text-3" id="text-2-2">
          </div>
          <div id="outline-container-sec-2-2-1" class="outline-4">
            <h4 id="sec-2-2-1"><span class="section-number-4">2.2.1</span>
              Unknown hardware issue in remaining beam lines</h4>
            <div class="outline-text-4" id="text-2-2-1">
              <dl class="org-dl">
                <dt> Likelihood </dt>
                <dd><b>Low</b>, HCO process provides confidence that the
                  hardware will function as designed
                </dd>
                <dt> Impact </dt>
                <dd><b>Medium</b>, a subtle hardware issue that escapes
                  detection by the
                  HCO process can result in a long downtime on the
                  order of days.
                </dd>
                <dt> Mitigation </dt>
                <dd><b>None</b>, continue to emphasize the usefulness of
                  HCO.
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-2-2-2" class="outline-4">
            <h4 id="sec-2-2-2"><span class="section-number-4">2.2.2</span>
              Pathlength</h4>
            <div class="outline-text-4" id="text-2-2-2">
              <dl class="org-dl">
                <dt> Likelihood </dt>
                <dd><b>High</b>, we've already encountered a surprising
                  2cm
                  pathlength effect with at present an unknown
                  origin. The dog-leg capacity at 10GeV, 5.5pass
                  to D is constrained due to lack of upgrade
                  (planned for Summer2014/Winter2015).
                </dd>
                <dt> Impact </dt>
                <dd><b>High</b>, it can take days to sort out the
                  pathlength
                  and optimize the optics. May take several
                  iterations of dog-leg settings, orbit adjustments and
                  MO frequency changes. Similar to the issues worked
                  through during March 3-pass spin-up.
                </dd>
                <dt> Mitigation </dt>
                <dd>Initial spin-up of the machine at low energy
                  (where the dog-legs have sufficient range) will
                  be used to determine the best approach for
                  achieving proper pathlength at 900MeV/linac
                  settings for the 10GeV goal.
                </dd>
                <dt> Impact Post-Mitigation </dt>
                <dd><b>Medium</b> </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-2-2-3" class="outline-4">
            <h4 id="sec-2-2-3"><span class="section-number-4">2.2.3</span>
              Synchrotron radiation induced orbit issues in the upper
              Arcs.</h4>
            <div class="outline-text-4" id="text-2-2-3">
              <dl class="org-dl">
                <dt> Likelihood </dt>
                <dd><b>High</b>, the synchrotron radiation compensation
                  coils are not ready for operations. </dd>
                <dt> Impact </dt>
                <dd><b>Medium</b>, these coils
                  are in the machine to compensate for the loss of
                  energy as the beam traverses the Arc. Without
                  these coils the correctors will need to compensate
                  for a constant field in the Arc Dipoles in passes
                  6,7,8,9,10. </dd>
                <dt> Mitigation </dt>
                <dd>Keep the energy as low as possible to achieve the
                  goal. The project goals are 10GeV 5.5 pass,
                  which is 909MeV/linac. Energy loss is
                  proportional to E^4, so for top energy (10/12)^4=
                  0.48. So energy loss should be about half of
                  the worse case envision (at full energy). </dd>
                <dt> Impact Post-Mitigation </dt>
                <dd><b>Low</b>
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-2-2-4" class="outline-4">
            <h4 id="sec-2-2-4"><span class="section-number-4">2.2.4</span>
              Shunt current at maximum near 10GeV setting</h4>
            <div class="outline-text-4" id="text-2-2-4">
              <dl class="org-dl">
                <dt> Likelihood </dt>
                <dd><b>High</b>, the design calls for a peak shunt
                  current
                  at about a 10GeV CEBAF setting. The design shunt
                  currents below and above that energy setting are
                  less. </dd>
                <dt> Impact </dt>
                <dd><b>High</b>, without the shunts delivering the
                  requested
                  design currents, off nominal corner steering will
                  have to take place. Some of the shunts presently
                  overheat when operated at the peak design value. </dd>
                <dt> Mitigation </dt>
                <dd>Engineering and Operability are exploring
                  solutions to this problem. Some options include
                  temporary air-conditioning, forced air flow,
                  lower LCW temperature. One could achieve the
                  project goals by delivery 11GeV beam to Hall-D,
                  instead of 10GeV. This would lower the shunt
                  currents but would adversely impact the
                  synchrotron radiation effects, pathlength
                  capabilities and RF performance. </dd>
                <dt> Impact Post-Mitigation </dt>
                <dd><b>Unknown</b> at this time.
                </dd>
              </dl>
            </div>
          </div>
        </div>
        <div id="outline-container-sec-2-3" class="outline-3">
          <h3 id="sec-2-3"><span class="section-number-3">2.3</span>
            Decision Tree and actions</h3>
          <div class="outline-text-3" id="text-2-3">
          </div>
          <div id="outline-container-sec-2-3-1" class="outline-4">
            <h4 id="sec-2-3-1"><span class="section-number-4">2.3.1</span>
              On 2014-04-21 Mon</h4>
            <div class="outline-text-4" id="text-2-3-1">
            </div>
            <div id="outline-container-sec-2-3-1-1" class="outline-5">
              <h5 id="sec-2-3-1-1"><span class="section-number-5">2.3.1.1</span>
                Has tune beam been transported to the 5C dumplet at
                550MeV/linac?</h5>
              <div class="outline-text-5" id="text-2-3-1-1">
                <dl class="org-dl">
                  <dt> Yes </dt>
                  <dd>Things maybe slightly late but achieving beam to
                    tagger
                    vault by May-2 still possible
                    <dl class="org-dl">
                      <dt> GOTO </dt>
                      <dd><a>2.3.4</a>
                      </dd>
                    </dl>
                  </dd>
                  <dt> No </dt>
                  <dd>Work with CPT to evaluate why progress has been
                    slower
                    than expected.
                    <dl class="org-dl">
                      <dt> GOTO </dt>
                      <dd><a>2.3.5</a>
                      </dd>
                    </dl>
                  </dd>
                </dl>
              </div>
            </div>
          </div>
          <div id="outline-container-sec-2-3-2" class="outline-4">
            <h4 id="sec-2-3-2"><span class="section-number-4">2.3.2</span>
              On 2014-04-25 Fri</h4>
            <div class="outline-text-4" id="text-2-3-2">
            </div>
            <div id="outline-container-sec-2-3-2-1" class="outline-5">
              <h5 id="sec-2-3-2-1"><span class="section-number-5">2.3.2.1</span>
                Has tune beam at or above 550MeV/linac been transported
                to the Hall-D Tagger Vault?</h5>
              <div class="outline-text-5" id="text-2-3-2-1">
                <dl class="org-dl">
                  <dt> Yes </dt>
                  <dd>Things maybe slightly late but achieving 10GeV
                    beam to
                    the 5C dumplet by 2014-05-02 Fri is still possible.
                    Start the energy scaling as soon as possible.
                    Terminate as soon as
                    goal is reached to avoid lengthy period with the
                    C100s at
                    gradient.
                    <dl class="org-dl">
                      <dt> GOTO </dt>
                      <dd><a>2.3.3</a>
                      </dd>
                    </dl>
                  </dd>
                  <dt> No </dt>
                  <dd>Work with CPT to evaluate why progress has been
                    slower
                    than expected.
                    <dl class="org-dl">
                      <dt> GOTO </dt>
                      <dd><a>2.3.5</a>
                      </dd>
                    </dl>
                  </dd>
                </dl>
              </div>
            </div>
          </div>
          <div id="outline-container-sec-2-3-3" class="outline-4">
            <h4 id="sec-2-3-3"><span class="section-number-4">2.3.3</span>
              On 2014-05-02 Fri</h4>
            <div class="outline-text-4" id="text-2-3-3">
            </div>
            <div id="outline-container-sec-2-3-3-1" class="outline-5">
              <h5 id="sec-2-3-3-1"><span class="section-number-5">2.3.3.1</span>
                Beam with E>10GeV at the 5C dumplet <b>and</b> beam
                to the Hall-D Tagger Vault?</h5>
              <div class="outline-text-5" id="text-2-3-3-1">
                <dl class="org-dl">
                  <dt> Yes </dt>
                  <dd>Great you're done!!!!
                    <dl class="org-dl">
                      <dt> GOTO </dt>
                      <dd>PARTY!!!
                      </dd>
                    </dl>
                  </dd>
                  <dt> No </dt>
                  <dd>Work with CPT to evaluate why progress has been
                    slower
                    than expected.
                    <dl class="org-dl">
                      <dt> GOTO </dt>
                      <dd><a>2.3.5</a>
                      </dd>
                    </dl>
                  </dd>
                </dl>
              </div>
            </div>
          </div>
          <div id="outline-container-sec-2-3-4" class="outline-4">
            <h4 id="sec-2-3-4"><span class="section-number-4">2.3.4</span>
              Hardware/Authorization ready for beam to Tagger Vault?</h4>
            <div class="outline-text-4" id="text-2-3-4">
              <dl class="org-dl">
                <dt> Yes </dt>
                <dd>Commission beam to tagger vault with the
                  550MeV/linac
                  configuration.
                </dd>
                <dt> No </dt>
                <dd>Scale machine to 910MeV/linac, and transport 10GeV
                  beam
                  to the 5C dumplet. After this has been achieved,
                  transport beam to Tagger vault at a convenient energy.
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-2-3-5" class="outline-4">
            <h4 id="sec-2-3-5"><span class="section-number-4">2.3.5</span>
              Why are things going much slower than expected?</h4>
            <div class="outline-text-4" id="text-2-3-5">
              <dl class="org-dl">
                <dt> Issue Unknown </dt>
                <dd>An unknown issue is stopping beam
                  commissioning progress. Since the source is unknown it
                  is
                  impossible to estimate the time needed for resolution.
                  This is
                  bad. Work with CPT to develop a plan to determine the
                  root
                  cause of the issue.
                  <ul class="org-ul">
                    <li>Send email to CAB/Lab/Project Leadership that
                      there are
                      issues and achieving the dumplet goal by May
                      2nd is unlikely and achieving the beam to
                      the Tagger
                      Vault milestone by May 15th is in jeopardy.
                    </li>
                    <li>Follow this up with daily status reports to
                      CAB/Lab/Project Leadership.
                    </li>
                    <li>Continue to work the problem until it has
                      been resolved or it is cleared that the
                      expected date for beam to 5C dumplet is
                      after 2014-05-15.
                    </li>
                    <li>If expected date for beam to 5C dumplet is
                      after 2014-05-15, <b>GOTO</b> : <a>2.3.6.2</a>
                    </li>
                    <li>Once resolved <b>GOTO</b> : <a>2.3.6</a>
                    </li>
                  </ul>
                </dd>
              </dl>
              <dl class="org-dl">
                <dt> Issue Known and resolved </dt>
                <dd>A resolved issue has caused
                  significant delay. Progress, after resolution, in
                  recent days has been as expected. Tunnel tour during
                  the open house is at risk.
                  <dl class="org-dl">
                    <dt> email </dt>
                    <dd>Send email to Lab Leadership on the status of
                      beam
                      operations. Detail the need to go beyond the
                      planned
                      end date of 2014-05-02 Fri and the possible impact
                      on
                      the open house
                    </dd>
                    <dt> GOTO </dt>
                    <dd><a>2.3.6</a>
                    </dd>
                  </dl>
                </dd>
              </dl>
              <dl class="org-dl">
                <dt> Issue known but unresolved </dt>
                <dd>In this case a known issue has
                  held up beam commissioning progress. Work with the CPT
                  to determine an estimate for
                  establishing beam to the Tagger Vault that
                  incorporates the time needed to fix the known issue as
                  well
                  as the remaining beam tasks.
                  <dl class="org-dl">
                    <dt> GOTO </dt>
                    <dd><a>2.3.6</a>
                    </dd>
                  </dl>
                </dd>
              </dl>
            </div>
          </div>
          <div id="outline-container-sec-2-3-6" class="outline-4">
            <h4 id="sec-2-3-6"><span class="section-number-4">2.3.6</span>
              Update Schedule</h4>
            <div class="outline-text-4" id="text-2-3-6">
            </div>
            <div id="outline-container-sec-2-3-6-1" class="outline-5">
              <h5 id="sec-2-3-6-1"><span class="section-number-5">2.3.6.1</span>
                Progress the Schedule</h5>
              <div class="outline-text-5" id="text-2-3-6-1">
                <ul class="org-ul">
                  <li>Using progress accumulated to date and additional
                    information
                    to update the schedule, include all tasks including
                    beam to the
                    tagger Vault. </li>
                </ul>
              </div>
            </div>
            <div id="outline-container-sec-2-3-6-2" class="outline-5">
              <h5 id="sec-2-3-6-2"><span class="section-number-5">2.3.6.2</span>
                Quit?</h5>
              <div class="outline-text-5" id="text-2-3-6-2">
                <ul class="org-ul">
                  <li>If the expected date for beam with E > 10GeV to
                    5C dumplet is
                    after 2014-05-15 Thu:
                    <ul class="org-ul">
                      <li>send an email to Lab/12GeV/CAB leadership
                        explaining the
                        situation. </li>
                      <li>Continue beam operations up to 2014-05-02 Fri
                      </li>
                      <li>Incorporate the 5C dumplet and Tagger Vault
                        milestone into
                        the 2014Fall beam commissioning plans.
                      </li>
                    </ul>
                  </li>
                </ul>
              </div>
            </div>
            <div id="outline-container-sec-2-3-6-3" class="outline-5">
              <h5 id="sec-2-3-6-3"><span class="section-number-5">2.3.6.3</span>
                Keep at it!</h5>
              <div class="outline-text-5" id="text-2-3-6-3">
                <ul class="org-ul">
                  <li>If the expected end date for beam with E > 10
                    GeV to the 5C dumplet precedes
                    2014-05-15 Thu
                    <ul class="org-ul">
                      <li>send an email to Lab/12GeV/CAB leadership
                        explaining the
                        situation.
                      </li>
                      <li>Tunnel tour during the open house is in
                        jeopardy. </li>
                      <li>Continue beam operations up to 2014-05-15 Thu,
                        get as far
                        as possible in beam transport up to the drop
                        dead date. </li>
                      <li>If needed, incorporate the 5C dumplet and
                        Tagger Vault milestone into
                        the 2014Fall beam commissioning plans.
                      </li>
                      <li>Continue to track progress beam commissioning
                        effort
                      </li>
                      <li>Send daily updates to Lab/12GeV/CAB Leadership
                      </li>
                    </ul>
                  </li>
                </ul>
              </div>
            </div>
          </div>
        </div>
      </div>
    </div>
    <br>
    <pre class="moz-signature">-- 
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab             
12000 Jefferson Avenue      Cell: (757) 876-6289
Postal Suite 19             Email:  <a class="moz-txt-link-abbreviated" href="mailto:freyberg@jlab.org" target="_blank">freyberg@jlab.org</a> 
Newport News, VA 23606  </pre>
  

</div><br></div></div></body></html>