<html>
  <head>
    <meta content="text/html; charset=ISO-8859-1"
      http-equiv="Content-Type">
  </head>
  <body bgcolor="#FFFFFF" text="#000000">
    schedule update....  I'll post in control room please mark it up if
    you wish to see any changes.<br>
    <pre>1 Supplemental LASO                                                :OPS:
===================

  ----------------------------------------------------------------------------------------------------------------------------------------------------
   Day Name   Date           Owl           Owl-Sup        Day       Day-Sup         Swing       Swing-Sup     Comment                                 
                                           4am-noon                 noon-8pm                    8pm-4am                                               
                                           (Duck Hunter)            (Country Club)              (Night Club)                                          
  ----------------------------------------------------------------------------------------------------------------------------------------------------
   Friday     May-02         Morozov                      Terzic                    Wang                      Beam tuned to                           
                                                                                                Spata         4/5R, CHL-1 trip                        
  ----------------------------------------------------------------------------------------------------------------------------------------------------
   Saturday   May-03         Morozov                      Benesch                   Grames                    Beam to 5C dumplet,finish 550MeV/linac  
                                           Freyberger                                           Tiefenback    start scaling to 910MeV/linac           
  ----------------------------------------------------------------------------------------------------------------------------------------------------
   Sunday     May-04         Suleiman                     Roblin                    Freyberger                910MeV/linac ORFP                       
                                                                    Kazimi                                                                            
  ----------------------------------------------------------------------------------------------------------------------------------------------------
   Monday     Cinco de Mayo  Benson                       Ahmad                     Tiefenback                document 10GeV to 5C                    
                                           Benesch                                                            Day shift: PSS certs/authorization      
                                                                                                              Swing shift: plow beam into tagger dump 
  ----------------------------------------------------------------------------------------------------------------------------------------------------
   Tuesday    May-06         Krafft                       Benesch                   Douglas                   Restore 550MeV/linac, start             
                                                                                                Satogata      Optics program                          
  ----------------------------------------------------------------------------------------------------------------------------------------------------
   Wednesday  May-07         Grames                       Stutzman                  Bogacz                                                            
                             (switch with  Freyberger               Roblin                      Satogata                                              
                             Tiefenback)                                                                                                              
  ----------------------------------------------------------------------------------------------------------------------------------------------------
   Thursday   May-08         Krafft                       Kazimi                    Satogata                                                          
                                                                    Roblin                                                                            
  ----------------------------------------------------------------------------------------------------------------------------------------------------
   Friday     May-09         Tiefenback                                                                       Beam off 8am??                          
                             (switch                                                                                                                  
                             with Grames)                                                                                                             
  ----------------------------------------------------------------------------------------------------------------------------------------------------

</pre>
    <pre>
</pre>
    <div class="moz-cite-prefix">On 05/02/2014 04:08 PM, Arne Freyberger
      wrote:<br>
    </div>
    <blockquote cite="mid:5363FB48.3080903@jlab.org" type="cite">
      <meta http-equiv="content-type" content="text/html;
        charset=ISO-8859-1">
      Colleagues,<br>
          In order to maintain momentum at this critical time in the
      commissioning, the concept of a supplemental LASO is being
      re-instated with the tentative schedule below.   A twist in the
      Supplement-LASO is that the SLASO shifts are offset by 4h from the
      nominal shifts.  This is done to provide seem-less continuity
      during this intense period.  The schedule has not been completely
      filled out and if you wish to volunteer for a SLASO shift, please
      let me know.     As some of you who have been assigned a SLASO
      shift are hearing about it the first time, I expect there will be
      some horse trading.   In addition to the schedule below,  there is
      a chart of the progress since the ZA affair.  Progress is on
      schedule, but due to the recent down times (CHL1 trips, dumplet
      issues)  there is no room left for inefficient operation.<br>
      <br>
      Arne and Mike<br>
      <pre>1 Supplemental LASO                                                :OPS:
===================

  --------------------------------------------------------------------------------------------------------------------------------------------------
   Day Name   Date           Owl         Owl-Sup        Day       Day-Sup         Swing       Swing-Sup     Comment                                 
                                         4am-noon                 noon-8pm                    8pm-4am                                               
                                         (Duck Hunter)            (Country Club)              (Night Club)                                          
  --------------------------------------------------------------------------------------------------------------------------------------------------
   Friday     May-02         Morozov                    Terzic                    Wang                      Beam tuned to                           
                                                                                              Spata         4/5R, CHL-1 trip                        
  --------------------------------------------------------------------------------------------------------------------------------------------------
   Saturday   May-03         Morozov                    Benesch                   Grames                    Beam to 5C dumplet,finish 550MeV/linac  
                                         Freyberger                                           Tiefenback    start scaling to 910MeV/linac           
  --------------------------------------------------------------------------------------------------------------------------------------------------
   Sunday     May-04         Suleiman                   Roblin                    Freyberger                910MeV/linac ORFP                       
                                                                                                                                                  
  --------------------------------------------------------------------------------------------------------------------------------------------------
   Monday     Cinco de Mayo  Benson                     Ahmad                     Tiefenback                document 10GeV to 5C                    
                                         Satogata                                                           Day shift: PSS certs/authorization      
                                                                                                            Swing shift: plow beam into tagger dump 
  --------------------------------------------------------------------------------------------------------------------------------------------------
   Tuesday    May-06         Krafft                     Benesch                   Douglas                   Restore 550MeV/linac, start             
                                         Freyberger                                                         Optics program                          
  --------------------------------------------------------------------------------------------------------------------------------------------------
   Wednesday  May-07         Grames                     Stutzman                  Bogacz                                                            
                                                                                                                                                  
  --------------------------------------------------------------------------------------------------------------------------------------------------
   Thursday   May-08         Krafft                     Kazimi                    Satogata                                                          
                                                                                                                                                  
  --------------------------------------------------------------------------------------------------------------------------------------------------
   Friday     May-09         Tiefenback                 Wang                      Zhang                                                             
                                                                                                                                                  
  --------------------------------------------------------------------------------------------------------------------------------------------------
</pre>
      <img src="cid:part1.01000308.07020005@jlab.org" alt="">
      <pre class="moz-signature" cols="72">-- 
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab             
12000 Jefferson Avenue      Cell: (757) 876-6289
Postal Suite 19             Email:  <a moz-do-not-send="true" class="moz-txt-link-abbreviated" href="mailto:freyberg@jlab.org">freyberg@jlab.org</a> 
Newport News, VA 23606  </pre>
      <br>
      <fieldset class="mimeAttachmentHeader"></fieldset>
      <br>
      <pre wrap="">_______________________________________________
BTeam mailing list
<a class="moz-txt-link-abbreviated" href="mailto:BTeam@jlab.org">BTeam@jlab.org</a>
<a class="moz-txt-link-freetext" href="https://mailman.jlab.org/mailman/listinfo/bteam">https://mailman.jlab.org/mailman/listinfo/bteam</a></pre>
    </blockquote>
    <br>
    <pre class="moz-signature" cols="72">-- 
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab             
12000 Jefferson Avenue      Cell: (757) 876-6289
Postal Suite 19             Email:  <a class="moz-txt-link-abbreviated" href="mailto:freyberg@jlab.org">freyberg@jlab.org</a> 
Newport News, VA 23606  </pre>
  </body>
</html>