<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=utf-8">
  </head>
  <body bgcolor="#FFFFFF" text="#000000">
    Beam is minutes away from the BSY dump.  Probably a few issues to
    fight through to get to CW OPS.   But expect to be in a position to
    optimized bunching by mid morning.   Tasks include:<br>
    <ol>
      <li>Optimizing bunching via 0L04 phase (Tief, Kazimi?, Spata?)<br>
      </li>
      <li>bunch length measurement via Arc1 (Tief/Mahmoud)</li>
      <li>calibrate Arc1 SLM</li>
      <li>energy spread measurement via Arc1 SLM</li>
      <li>Setup for RTI commissioning<br>
      </li>
      <li>Prepare for the weather event<br>
      </li>
    </ol>
    <div id="content">
      <h1 class="title">Spring 2015 Startup Evolution</h1>
      <div id="outline-container-sec-1" class="outline-2">
        <h2 id="sec-1"><span class="section-number-2">1</span> Spring
          2015 StartUp   <span class="tag"><span class="OPS">OPS</span></span></h2>
        <div class="outline-text-2" id="text-1">
        </div>
        <div id="outline-container-sec-1-1" class="outline-3">
          <h3 id="sec-1-1"><span class="section-number-3">1.1</span>
            Spreadsheet</h3>
          <div class="outline-text-3" id="text-1-1">
            <ul class="org-ul">
              <li><a
href="https://docs.google.com/spreadsheets/d/1AMVnjOjYZAqxLSQI_bzgt4cbmZlRY0DIh6uUaYCadPk/pubhtml">Run
                  Spread Sheet</a>
              </li>
              <li>Please send me your gmail address if you wish to have
                edit
                privileges
              </li>
            </ul>
          </div>
        </div>
        <div id="outline-container-sec-1-2" class="outline-3">
          <h3 id="sec-1-2"><span class="section-number-3">1.2</span> <code>[0/7]</code>
            Deferred tasks - DEFERRED not FORGOTTEN!</h3>
          <div class="outline-text-3" id="text-1-2">
            <ul class="org-ul">
              <li><code>[ ]</code> Calibrate INJ sync light monitor
                (Freyberger)
                <ul class="org-ul">
                  <li><b>deferred until after Inj. SLM is aligned
                      (Tuesday DAY)</b>
                  </li>
                </ul>
              </li>
              <li><code>[ ]</code> Inj. Energy spread via Inj SLM
                (Freyberger)
                <ul class="org-ul">
                  <li><b>deferred until after Inj. SLM is aligned
                      (Tuesday DAY)</b>
                  </li>
                </ul>
              </li>
              <li><code>[ ]</code> Repeat Energy Spread measurement at
                Spectrometer dump
                <ul class="org-ul">
                  <li><b>deferred</b>
                  </li>
                </ul>
              </li>
              <li><code>[ ]</code> re-measure Injector Emittance/TWISS
                <ul class="org-ul">
                  <li><b>defer to after 0L04 phasing</b>
                  </li>
                </ul>
              </li>
              <li><code>[ ]</code> Measure Inj. Chicane M56 (Krafft)
                <ul class="org-ul">
                  <li><b>defer until ???</b>
                  </li>
                </ul>
              </li>
              <li><code>[ ]</code> Arc1 M56 = 0
                <ul class="org-ul">
                  <li><b>deferred to later</b>
                  </li>
                </ul>
              </li>
              <li><code>[ ]</code> 2E emittance/TWISS measurement
                <ul class="org-ul">
                  <li>Match calculated offline, to be loaded Tuesday Day
                    shift
                  </li>
                  <li><b>deferred to later</b>
                  </li>
                </ul>
              </li>
            </ul>
          </div>
        </div>
        <div id="outline-container-sec-1-3" class="outline-3">
          <h3 id="sec-1-3"><span class="section-number-3">1.3</span>
            2015-02-15 Sun</h3>
          <div class="outline-text-3" id="text-1-3">
          </div>
          <ol class="org-ol">
            <li><code>[3/3]</code> Swing<br>
              <div class="outline-text-4" id="text-1-3-1">
                <ul class="org-ul">
                  <li><code>[X]</code> SL phasing </li>
                  <li><code>[X]</code> Beam to 2R
                  </li>
                  <li><code>[X]</code> ORFP
                  </li>
                </ul>
              </div>
            </li>
          </ol>
        </div>
        <div id="outline-container-sec-1-4" class="outline-3">
          <h3 id="sec-1-4"><span class="section-number-3">1.4</span>
            2015-02-16 Mon</h3>
          <div class="outline-text-3" id="text-1-4">
          </div>
          <ol class="org-ol">
            <li><code>[3/6]</code> Owl<br>
              <div class="outline-text-4" id="text-1-4-1">
                <ul class="org-ul">
                  <li><code>[X]</code> Beam to 2R
                    <ul class="org-ul">
                      <li>Had difficulty making the gradient, ran Fudge
                        to its limits.
                        Had to re-Lem with an adjusted energy target. RF
                        Gradient
                        calibration issue?
                      </li>
                      <li>elog: <a
                          href="https://logbooks.jlab.org/entry/3320760">3320760</a>
                      </li>
                    </ul>
                  </li>
                  <li><code>[X]</code> ORFP
                  </li>
                  <li><code>[ ]</code> Arc1 M56 = 0
                    <ul class="org-ul">
                      <li><b>deferred to later</b>
                      </li>
                    </ul>
                  </li>
                  <li><code>[ ]</code> 2E emittance/TWISS measurement
                    <ul class="org-ul">
                      <li>Match calculated offline, to be loaded Tuesday
                        Day shift
                      </li>
                      <li><b>deferred to later</b>
                      </li>
                    </ul>
                  </li>
                  <li><code>[ ]</code> Extract 1-pass to BSY dump
                    <ul class="org-ul">
                      <li>attempted but had configuration issues. </li>
                      <li>Issue identified and extraction will be first
                        thing on Day shift.
                      </li>
                    </ul>
                  </li>
                  <li><code>[X]</code> Optimize Inj.
                    bunching/phasing(0L04)- First Look
                    <ul class="org-ul">
                      <li>elog: <a
                          href="https://logbooks.jlab.org/entry/3320766">3320766</a>
                        <a
                          href="https://logbooks.jlab.org/entry/3320768">3320768</a>
                        <a
                          href="https://logbooks.jlab.org/entry/3320769">3320769</a>
                        <a
                          href="https://logbooks.jlab.org/entry/3320770">3320770</a>
                      </li>
                    </ul>
                  </li>
                </ul>
              </div>
            </li>
            <li><code>[0/6]</code> Day<br>
              <div class="outline-text-4" id="text-1-4-2">
                <ul class="org-ul">
                  <li><code>[ ]</code> 1-pass to BSY dump
                  </li>
                  <li><code>[ ]</code> Go CW!
                  </li>
                  <li><code>[ ]</code> Optimize Inj.
                    bunching/phasing(0L04)
                    <ul class="org-ul">
                      <li>Kazimi
                      </li>
                      <li>Tief
                      </li>
                      <li>Ahmad Mahmoud
                      </li>
                    </ul>
                  </li>
                  <li><code>[ ]</code> Bunch length measurement via Inj
                    SLM
                    <ul class="org-ul">
                      <li><b>deferred until after Inj SLM aligned</b>
                      </li>
                    </ul>
                  </li>
                  <li><code>[ ]</code> Bunch length measurement via Arc1
                    SLM
                  </li>
                  <li><code>[ ]</code> Energy Spread via Inj and Arc1
                    SLM
                  </li>
                </ul>
              </div>
            </li>
            <li><code>[0/3]</code> Swing - BS<br>
              <div class="outline-text-4" id="text-1-4-3">
                <ul class="org-ul">
                  <li><code>[ ]</code> CW 1-pass to BSY Dump
                  </li>
                  <li><code>[ ]</code> RTI test at 2GeV, 125MHz rep.
                    rate.
                    <ul class="org-ul">
                      <li>50μ A avg. beam current
                      </li>
                      <li>125MHz rep.rate
                      </li>
                      <li>bunch charge equivalent to 200μ A at 499MHz
                        repetition rate
                      </li>
                    </ul>
                  </li>
                  <li><code>[ ]</code> or lower machine to 1GeV per pass
                    <ul class="org-ul">
                      <li>100μ A avg. beam current
                      </li>
                      <li>249.5MHz repetition rate
                      </li>
                      <li>bunch charge equivalent to 200μ A at 499MHz
                        repetition rate
                      </li>
                    </ul>
                  </li>
                </ul>
              </div>
            </li>
          </ol>
        </div>
        <div id="outline-container-sec-1-5" class="outline-3">
          <h3 id="sec-1-5"><span class="section-number-3">1.5</span>
            2015-02-17 Tue</h3>
          <div class="outline-text-3" id="text-1-5">
          </div>
          <ol class="org-ol">
            <li><code>[0/4]</code> Day<br>
              <div class="outline-text-4" id="text-1-5-1">
                <ul class="org-ul">
                  <li><code>[ ]</code> <b>Punch list, limited access AM
                      & PM?</b>
                    <ul class="org-ul">
                      <li><code>[ ]</code> FML Power Loop Config (4h)
                        (West Arc Mag off)
                      </li>
                      <li><code>[ ]</code> Hall-B Laser (8h)
                      </li>
                      <li><code>[ ]</code> Inj sync light camera (1h)
                      </li>
                      <li><code>[ ]</code> NL05 Resurrection (?h)
                      </li>
                      <li><code>[ ]</code> Arc6 Water Flow
                      </li>
                    </ul>
                  </li>
                  <li><code>[ ]</code> restore CEBAF to configuration
                    energy
                  </li>
                  <li><code>[ ]</code> load 1E and 2E match
                  </li>
                  <li><code>[ ]</code> beam back to 2R
                  </li>
                </ul>
              </div>
            </li>
          </ol>
        </div>
      </div>
    </div>
    <div id="postamble" class="status">
      <p class="author">Author: Arne Freyberger</p>
      <p class="date">Created: 2015-02-16 Mon 07:35</p>
      <p class="creator"><a href="http://www.gnu.org/software/emacs/">Emacs</a>
        24.3.1 (<a href="http://orgmode.org">Org</a> mode 8.0-pre)</p>
      <p class="xhtml-validation"><a
          href="http://validator.w3.org/check?uri=referer">Validate
          XHTML 1.0</a></p>
    </div>
    <br>
    <pre class="moz-signature" cols="72">-- 
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab             
12000 Jefferson Avenue      Cell: (757) 876-6289
Postal Suite 19             Email:  <a class="moz-txt-link-abbreviated" href="mailto:freyberg@jlab.org">freyberg@jlab.org</a> 
Newport News, VA 23606  </pre>
  </body>
</html>