<html>
  <head>
    <meta content="text/html; charset=windows-1252"
      http-equiv="Content-Type">
  </head>
  <body bgcolor="#FFFFFF" text="#000000">
    <div class="moz-cite-prefix"><br>
    </div>
    <pre wrap="">Dear All,


Here it is....a chronological beam study list for 5/4-18, as we discussed it this afternoon:

   - SR compensation coils, hardware check & calibration (4h)       (Tief)          5/4

   - Cross-talk test (4h)                                       (Jay)           5/4

   - Large Dynamic Aperture Diagnostic Stations work            (Joe Gubeli, Kevin Jordan)
         Part I -tunnel access (4h)                                             5/4 
         Part I<i>I</i> - instrumentation work (4h)                                 5/7 
         Part I<i>II</i> - instrumentation work (4h)                                        5/13 

   - autoquad commissioning with beam (4)                       (Michele)       5/5 
   - phaser commissioning with beam (4h)                        (C. Slominski)  5/5 
   - ITV system commissioning with beam (4h)                    (J. Krotze)     5/5 

   - Energy/cavity calibrations                                 (Jay)           
        Part I  (10h)                                                           5/6
        Part II (10h)                                                           5/14

   - Injector beam co-linearity test (6h)                       (Alicia et al)  5/8
   - Injector procedure check (4h)                              (Alicia)        5/8

   - Spr/Rec tuning procedure improvements (4h)                 (Yves)          5/8

   - RTI test (6h)                                              (Mahmoud)       5/11            

   - Dogleg focusing study (6h)                                 (Tief)          5/12

I hope I caught it all. Thanks.

                Alex
</pre>
    <br>
  </body>
</html>