<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=utf-8">
  </head>
  <body text="#000000" bgcolor="#FFFFFF">
    Colleagues,<br>
    In discussion with Cryo the following adjustments to the Fall
    schedule are proposed.   The highlights are:<br>
    <ol>
      <li>CC1 repair complete and South linac at 2K by Fri. Nov. 6th</li>
      <ol>
        <li>This assumes an easy fix.<br>
        </li>
      </ol>
      <li>CEBAF 12GeV Spin-up</li>
      <ol>
        <li>Start date remains Nov. 9th</li>
        <li>Beam operations will have a short break while the South
          linac RF system is optimized.</li>
        <li>CEBAF Plan still maintains almost a week of contingency
          (147h)<br>
        </li>
      </ol>
      <li>CEBAF Beam operations over Thanksgiving.  <br>
      </li>
      <ol>
        <li>CEBAF will be placed in Hot Stand By mode Wednesday evening
          to Friday morning</li>
        <li>Beam Operations resume Black Friday and continue through to
          Dec. 21st</li>
        <ol>
          <li>Original plan had beam off Wed morning and resuming the
            evening of Tues Dec 01 <br>
          </li>
        </ol>
      </ol>
      <li>LERF Restart will take place during the break in CEBAF
        Operations for South linac RF optimization</li>
      <ol>
        <li>LERF restart is from  Nov 14th to Nov 22<br>
        </li>
        <li>LERF Restart plan has been stripped of contingency</li>
        <li>Opportunistic LERF operations prior to Nov. 14th are being
          explored.</li>
      </ol>
    </ol>
    <p>The image below is a whiteboard interpretation of the new
      schedule.   The schedule can also be viewed at:<br>
    </p>
    <h4>CEBAF:</h4>
    <ul>
      <li><a class="moz-txt-link-freetext" href="http://opsweb.acc.jlab.org/TJ3/12GeV_CEBAF/Week%200.html">http://opsweb.acc.jlab.org/TJ3/12GeV_CEBAF/Week%200.html</a></li>
      <li>Click on Week 0..8 to see the detailed week-by-week CEBAF
        plans<br>
      </li>
    </ul>
    <h4>LERF:</h4>
    <ul>
      <li><a class="moz-txt-link-freetext" href="http://opsweb.acc.jlab.org/TJ3/12GeV_CEBAF/LERF_Restart.html">http://opsweb.acc.jlab.org/TJ3/12GeV_CEBAF/LERF_Restart.html</a></li>
    </ul>
    This is a fresh plan, comments and discussion are welcome.   Email
    updates will be made when significant changes and upon the arrival
    of new information.  Please forward to anyone who would benefit from
    this information. <br>
    <br>
    Arne<br>
    <br>
    <img alt="" src="cid:part1.03060001.08070909@jlab.org" height="747"
      width="1328">
    <p><br>
    </p>
    <div class="moz-forward-container">
      <table class="moz-email-headers-table" border="0" cellpadding="0"
        cellspacing="0">
        <tbody>
          <tr>
            <th nowrap="nowrap" valign="BASELINE" align="RIGHT"><br>
            </th>
            <td><br>
            </td>
          </tr>
          <tr>
            <th nowrap="nowrap" valign="BASELINE" align="RIGHT"><br>
            </th>
            <td><br>
            </td>
          </tr>
          <tr>
            <th nowrap="nowrap" valign="BASELINE" align="RIGHT"><br>
            </th>
            <td><br>
            </td>
          </tr>
          <tr>
            <th nowrap="nowrap" valign="BASELINE" align="RIGHT"><br>
            </th>
            <td><br>
            </td>
          </tr>
        </tbody>
      </table>
      <br>
      <br>
      <br>
    </div>
    <br>
  </body>
</html>