All, <br>
</div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
Yves will be out today and has asked me to lead the meeting today. Here is a quick status and possible discussion points. Hopefully it will be a quick meeting.
<br>
</div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
<br>
</div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
Injector:<br>
</div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
<ol>
<li>Injector set-up ongoing. We will be sending beam to the ILD later, and reducing the sensitivity of the BLMs 0R09 and 0R08 to bump up the current to the ILD.</li><li>Discussion ongoing about charging viewer. We may try a PID lock of some kind to lock the front end positions.
<br>
</li><li>Once we get higher current, PQB will still need to check beam to the ILD. <br>
</li><li>Match was done in 6 MeV region and 0L region. <a href="https://logbooks.jlab.org/entry/3738453" id="LPlnk981980">
https://logbooks.jlab.org/entry/373845</a></li></ol>
<div>Machine:</div>
<div>
<ol>
<li>RF that still needs work: 1L26, 1L07, 1L13.</li><li>Cryo found today that RT valves for the C100s are all looking like seals have disintegrated. Jonathan Creel will speak to this in tomorrows 8AM meeting.
<br>
</li><li>HCO nearing completion</li></ol>
<div>We are still pushing to beam able to send beam to 1R Thursday. Open questions for this meeting:</div>
<div>
<ol>
<li>Hall A will not be ready for beam until after the 14th, so we are unable to do cross calibration Arc1/ Arc2/ Hall A Dipole strings.</li><ol style="list-style: outside none lower-alpha;">
<li> Do we still do Arc 1 and Arc 2 and wait for Hall A 1st for spin dance to get Hall A Energy measurement.
<br>
</li><li> Do we spin up 5 pass beam -> Hall A 5th pass RF stress test -> drop back to 1st pass to hall A for spin dance and Dipole calibration?
<br>
</li></ol>
<li>Yves said he thinks that dipole field maps have already been updated. Is this true?
<br>
</li><li>What else am I missing?</li></ol>
<div>Thanks, <br>
</div>
<div>-Brian<br>
</div>