As I mentioned last week, I am unavailable today to tun the BNNT test. I haven't heard anyone else step up to run the viewer test (Tief or Gubeli?). So, Jay it may fall off the list for today, Thank you.</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0); background-color: rgb(255, 255, 255);">
<br>
</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0); background-color: rgb(255, 255, 255);">
-Brian </div>
<div id="appendonsend"></div>
<hr style="display:inline-block;width:98%" tabindex="-1">
<div id="divRplyFwdMsg" dir="ltr"><font face="Calibri, sans-serif" style="font-size:11pt" color="#000000"><b>From:</b> BTeam <bteam-bounces@jlab.org> on behalf of Michael Tiefenback <tiefen@jlab.org><br>
<b>Sent:</b> Friday, September 11, 2020 8:18 AM<br>
<b>To:</b> Jay Benesch <benesch@jlab.org>; Reza Kazimi <kazimi@jlab.org><br>
<b>Cc:</b> bteam@jlab.org <bteam@jlab.org><br>
<b>Subject:</b> Re: [BTeam] Reschedule: Tuesday beam studies 9/15</font>
<div> </div>
</div>
<style type="text/css" style="display:none">
<!--
p
        {margin-top:0;
        margin-bottom:0}
-->
</style>
<div dir="ltr">
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
Our viewer supports have not been designed to support any heat load.  I raise the question: Does CW on the BNNT flag result in heating which might have unpleasant consequences?  It seems to me that placing a BNNT flag into a more readily tended piece of beam
 line than Arc 7A would be better than potentially dirtying up ITV7A09.  An issue for discussion rather than a forecast of disaster.</div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
<br>
</div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
I left the Bteam in the reply list in case others want to contribute to the discussion.<br>
</div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
<br>
</div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
Michael Tiefenback<br>
</div>
<div>
<div id="x_appendonsend"></div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
<br>
</div>
<hr tabindex="-1" style="display:inline-block; width:98%">
<div id="x_divRplyFwdMsg" dir="ltr"><font face="Calibri, sans-serif" color="#000000" style="font-size:11pt"><b>From:</b> BTeam <bteam-bounces@jlab.org> on behalf of Jay Benesch <benesch@jlab.org><br>
<b>Sent:</b> Thursday, September 10, 2020 16:36<br>
<b>To:</b> Reza Kazimi <kazimi@jlab.org><br>
<b>Cc:</b> bteam@jlab.org <bteam@jlab.org><br>
<b>Subject:</b> [BTeam] Reschedule: Tuesday beam studies 9/15</font>
<div> </div>
</div>
<div class="x_BodyFragment"><font size="2"><span style="font-size:11pt">
<div class="x_PlainText">Colleagues, <br>
<br>
Given that the safety briefing is Tuesday, I will propose to the RCs tomorrow that the beam studies be done Monday.  
<br>
<br>
It has been suggested that the BNNT viewer be re-classified in CED as CW and subjected to 30 uA CW just before Hall C switches to first pass.  This would be in lieu of tune beam Monday.  Comments?
<br>
<br>
Jay <br>
<br>
________________________________________<br>
From: Jay Benesch <benesch@jlab.org><br>
Sent: Wednesday, September 9, 2020 2:20 PM<br>
To: Reza Kazimi<br>
Cc: bteam@jlab.org<br>
Subject: Tuesday beam studies 9/15<br>
<br>
Reza and colleagues,<br>
<br>
I told the morning and 1330 meetings that we would be taking a full<br>
eight hours next Tuesday, likely starting at 0900.  Test plan order<br>
needs to be decided.  Hall C would like an hour access, not compatible<br>
with Smart Alarm test plan or BNNT test plan.  Dennis's RayTrace test<br>
plan is compatible.<br>
<br>
<a href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21000">http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21000</a> RayTrace 1.5 hr<br>
<br>
<a href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21151">http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21151</a>  Smart Alarm 4 hr<br>
<br>
<a href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21234">http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21234</a>  BNNT 2 hr<br>
<br>
Suggested order:<br>
<br>
RayTrace so RadCon can support Hall C entry during normal hours.<br>
<br>
restore CW through empty target to Hall C<br>
<br>
Smart Alarm<br>
<br>
BNNT Can this be parasitic during tune beam portion of Smart Alarm?<br>
      If this falls off the table due to over-run of the two above, we<br>
simply continue with existing viewer flags.<br>
<br>
Begin restoration to all halls at 1630, after swing crew turn-over.<br>
Attempt to complete by 1700, eight hours after start.<br>
<br>
Jay<br>
<br>
_______________________________________________<br>
BTeam mailing list<br>
BTeam@jlab.org<br>
<a href="https://mailman.jlab.org/mailman/listinfo/bteam">https://mailman.jlab.org/mailman/listinfo/bteam</a><br>
</div>
</span></font></div>
</div>
</div>
</body>
</html>