<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=us-ascii">
<style type="text/css" style="display:none;"> P {margin-top:0;margin-bottom:0;} </style>
</head>
<body dir="ltr">
<div class="elementToProof"><span style="font-family: Aptos, Aptos_EmbeddedFont, Aptos_MSFontService, Calibri, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">"</span><span style="font-family: "Segoe UI", "Segoe UI Web (West European)", "Segoe UI", -apple-system, BlinkMacSystemFont, Roboto, "Helvetica Neue", sans-serif; font-size: 14.6667px; color: rgb(0, 0, 0); background-color: rgb(255, 255, 255);">Shawn
 mentioned at the 8am meeting that RF might clean contacts on C100s if test plans are injector-only.
</span><span style="font-family: Aptos, Aptos_EmbeddedFont, Aptos_MSFontService, Calibri, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">"</span></div>
<div class="elementToProof"><span style="font-family: Aptos, Aptos_EmbeddedFont, Aptos_MSFontService, Calibri, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);"><br>
</span></div>
<div class="elementToProof"><span style="font-family: Aptos, Aptos_EmbeddedFont, Aptos_MSFontService, Calibri, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">Just want to clarify this statement by mentioning if there are test plans that do not
 require beam through the SL, I would have RF take advantage of some PMs in that region. Thanks</span></div>
<div class="elementToProof"><span style="font-family: Aptos, Aptos_EmbeddedFont, Aptos_MSFontService, Calibri, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);"><br>
</span></div>
<div class="elementToProof"><span style="font-family: Aptos, Aptos_EmbeddedFont, Aptos_MSFontService, Calibri, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">Shawn</span></div>
<div id="appendonsend"></div>
<hr style="display:inline-block;width:98%" tabindex="-1">
<div id="divRplyFwdMsg" dir="ltr"><font face="Calibri, sans-serif" style="font-size:11pt" color="#000000"><b>From:</b> BTeam <bteam-bounces@jlab.org> on behalf of Jay Benesch via BTeam <bteam@jlab.org><br>
<b>Sent:</b> Monday, February 5, 2024 08:44<br>
<b>To:</b> bteam@jlab.org <bteam@jlab.org><br>
<b>Cc:</b> Simona Malace <simona@jlab.org>; Dakota Christian <dchri@jlab.org><br>
<b>Subject:</b> [BTeam] Test plans for Wednesday</font>
<div> </div>
</div>
<div class="BodyFragment"><font size="2"><span style="font-size:11pt;">
<div class="PlainText">Colleagues, <br>
<br>
Please send me your requests for beam tests Wednesday.  Discussion Tuesday if we can't settle by email.
<br>
<br>
Eduard has agreed that I may have 30-40 minutes for rfcal of ten SL cavities to finish up that linac. 
<a href="https://tasklists.jlab.org/bslist/tasks/22480">https://tasklists.jlab.org/bslist/tasks/22480</a> last comment<br>
<br>
<a href="https://tasklists.jlab.org/bslist/tasks/110689">https://tasklists.jlab.org/bslist/tasks/110689</a> debug scl .  As I recall this is still not fully functional  Riad?
<br>
<br>
Alicia?  <a href="https://tasklists.jlab.org/bslist/tasks/110757">https://tasklists.jlab.org/bslist/tasks/110757</a><br>
<br>
Max? <a href="https://tasklists.jlab.org/bslist/tasks/110163">https://tasklists.jlab.org/bslist/tasks/110163</a>
<br>
<br>
Riad? <a href="https://tasklists.jlab.org/bslist/tasks/110672">https://tasklists.jlab.org/bslist/tasks/110672</a>  helicity board test - problems on first attempt
<br>
<br>
Any time anyone else doesn't want: I'd like to redo NL rfcal with lower momentum excursions so BPM non-linearity has less effect.
<br>
<br>
Brian? <a href="https://tasklists.jlab.org/bslist/tasks/108523">https://tasklists.jlab.org/bslist/tasks/108523</a> Temporarily lower the HV om ILM8E02, ILM4E02, and ILM1L02 to "potentially" induce other trips 
<br>
<br>
--------------<br>
Shawn mentioned at the 8am meeting that RF might clean contacts on C100s if test plans are injector-only.  
<br>
<br>
Mike McCaughan may want to do pulse processing in parallel with injector studies.
<br>
<br>
I don't know if Dakota's 2L22/2L25 measurements are complete.  <br>
<br>
---------------------<br>
Please de-clutter the BSList, completing those which have been done and putting on hold until after the SAD everything which requires that the injector solenoids be repaired.   Or that requires 180+ keV. 
<br>
<br>
Thank you. <br>
<br>
Jay <br>
<br>
<br>
_______________________________________________<br>
BTeam mailing list<br>
BTeam@jlab.org<br>
<a href="https://mailman.jlab.org/mailman/listinfo/bteam">https://mailman.jlab.org/mailman/listinfo/bteam</a><br>
</div>
</span></font></div>
</body>
</html>