[Clas12_calcom] [EXTERNAL] Re: timelines for RGB F19-S20 ready for detector experts
Zhiwen Zhao
zwzhao at jlab.org
Thu Aug 3 14:03:27 EDT 2023
Chris
I used the latest main branch.
Can you help tell if the EC code Cole wants is in other branch and merge
it into main? or any other suggestion?
Zhiwen
On 8/3/2023 12:59 PM, L Smith wrote:
> Zhiwen,
>
> The v29.22_new link still shows the old EC menu and timelines (before
> June 8). The latest should show the new menu for EC (below). For
> example the latest RGK, RGA-F18 and RGC timelines show the new menu and
> timelines.
>
> Cole
>
> BEFORE JUNE 8
>
>
>
> AFTER JUNE 8
>
>
>
>> On Aug 3, 2023, at 12:27 PM, Zhiwen Zhao <zwzhao at jlab.org
>> <mailto:zwzhao at jlab.org>> wrote:
>>
>> All
>>
>> I updated the timeline v29.22_new here with latest clas12-timeline main
>> https://clas12mon.jlab.org/rgb/pass0/v29.22_new/tlsummary/
>> <https://clas12mon.jlab.org/rgb/pass0/v29.22_new/tlsummary/>
>>
>> Note it's only for RGB F19 only, not S20 which is under work.
>>
>> Zhiwen
>>
>> On 8/2/2023 12:47 PM, Christopher Dilks wrote:
>>> Hi Zhiwen,
>>> Go ahead and try the main branch. If it fails, I'll fix it.
>>> In the future, we may consider running off tagged releases (which
>>> should be stable) instead of just the latest version on main (which
>>> may sometimes be unstable, until we have proper testing).
>>> Thanks,
>>> Chris
>>> On 8/2/23 12:36, Zhiwen Zhao wrote:
>>>> Chris
>>>>
>>>> I always used latest main branch of clas12-timeline repo and never
>>>> used any tag version.
>>>> I suppose other chefs do the same.
>>>>
>>>> Should I reproduce timeline with the latest main branch now or I
>>>> should wait for your suggestion?
>>>>
>>>> Zhiwen
>>>>
>>>> On 8/2/2023 11:31 AM, Christopher Dilks wrote:
>>>>> Dear Marco and Silvia,
>>>>>
>>>>> Marco's changes were merged in on Monday. I haven't tagged a new
>>>>> release yet since we have also merged in a few other general
>>>>> cleanup changes and improvements, but I haven't had a chance to
>>>>> fully test everything yet (currently automating testing, actually).
>>>>>
>>>>> Let me know if there are any issues, and if so, I'll tag a stable
>>>>> version with only Marco's change.
>>>>>
>>>>> Thanks,
>>>>>
>>>>> Chris
>>>>>
>>>>> On 8/2/23 11:19, Marco Mirazita via Clas12_calcom wrote:
>>>>>> Dear Silvia,
>>>>>> these timelines does not have the fix on the RICH monitoring
>>>>>> histograms that I committed on github just yesterday.
>>>>>> Is it possible to rerun with the latest version of the software?
>>>>>> Thank you,
>>>>>> Marco
>>>>>>
>>>>>>
>>>>>> Il 2023-08-02 17:11 silvia--- via Clas12_calcom ha scritto:
>>>>>>> Dear all,
>>>>>>> after completing FTOF and RF calibration, RGB F19-S20 is ready
>>>>>>> for the
>>>>>>> calibration of the other subsystems. Please check the timelines at
>>>>>>> https://clas12mon.jlab.org/rgb/pass0/v29.22/tlsummary/
>>>>>>> <https://clas12mon.jlab.org/rgb/pass0/v29.22/tlsummary/> , and
>>>>>>> let me and
>>>>>>> Zhiwen know which runs you need to have cooked for your subsystem.
>>>>>>> Ideally, it would be great if you provided, when possible, a run
>>>>>>> range, so
>>>>>>> we can optimize the cooking for everyone.
>>>>>>> Thanks a lot for your support!
>>>>>>> Best regards,
>>>>>>> Silvia
>>>>>>>
>>>>>>>
>>>>>>> _______________________________________________
>>>>>>> Clas12_calcom mailing list
>>>>>>> Clas12_calcom at jlab.org <mailto:Clas12_calcom at jlab.org>
>>>>>>> https://mailman.jlab.org/mailman/listinfo/clas12_calcom
>>>>>> _______________________________________________
>>>>>> Clas12_calcom mailing list
>>>>>> Clas12_calcom at jlab.org <mailto:Clas12_calcom at jlab.org>
>>>>>> https://mailman.jlab.org/mailman/listinfo/clas12_calcom
>
More information about the Clas12_calcom
mailing list