[Clas12_calcom] timelines for RGC Fall22 available to choose runs to calibrate
silvia at jlab.org
silvia at jlab.org
Tue Apr 30 06:11:57 EDT 2024
Dear CalCom,
following the updated RF calibration, a pass0 and new timelines have been
produced for RGC Fall22. They can be found at the link:
https://clas12mon.jlab.org/rgc/Fall2022/pass0v1.05/tlsummary/
It seems to me that FTOF is doing great, all the QA distributions are in
specs (aside for the alignment runs ~16865, but that is ok). Daniel, can
you please confirm this? If it is the case, I think we can proceed to the
selection of the runs to be cooked for the other subsystems.
Thanks a lot and best regards,
Silvia
More information about the Clas12_calcom
mailing list