[Clas12_calcom] [EXTERNAL] Re: new timelines for RGC-summer22
Raffaella De Vita
devita at ge.infn.it
Tue Jan 2 17:44:36 EST 2024
Dear Silvia,
Here is an update on FTCal:
- for the empty target runs, the timeline is actually misleading because the assumption on the FT photons vertex to be at the center of the target cell is not accurate and the pi0 mass comes out shifted even is the energy calibration is good. For example, runs 16184-16194 are in the middle of a run range sharing the same constants where production runs before and after are within specs.
- runs 16271-16279 and 16296-16403 are after the high luminosity irradiations and the calorimeter response varies too much from run to run and probably within the runs to do much about it.
- runs 16280-16287 and 16751-16772 should be fixed now: I made a mistake when uploading the constants and the constants were still the old ones from last year.
In summary, I don’t think I need new runs to be cooked and the next timeline should hopefully be good.
Best regards,
Raffaella
> On 29 Dec 2023, at 07:49, silvia--- via Clas12_calcom <clas12_calcom at jlab.org> wrote:
>
> Dear detector experts,
> I hope you're having a nice Christmas break. Following the recent
> calibrations of several subsystems, we ran a new pass0 and produced new
> timelines, RGC's gift to you :-)
> The link is: https://clas12mon.jlab.org/rgc/Summer2022/pass0v0.17/tlsummary/
> The recon files can be found at:
> /volatile/clas12/rg-c/production/pass0/mon/v0.17/mon/recon/
> From a quick glance, things look pretty good for most of the subsystems.
> A few things I noticed:
> - ECAL: SF and timing is out of specs for all the 2.2 data; we need to
> decide once for all which runs to remove from our list due to the
> bleedthrough from Hall C
> - FTCAL: pi0 mass mean out of specs for runs: 16184 - 16194 (empty target
> runs), 16271-16287, 16306-16309 (just slightly out of specs), 16396 -
> 16406 (the first few runs are trigger tests, but could still be good for
> analysis, the last ones are ordinary prod runs), 16751 - 16772 (all the
> end of the run period, prod runs)
> - FTHODO: a few outliers for the MIPS time QA, aside from the runs that
> Nick already informed me about, that cannot be calibrated
> - HTCC: nphe/sec QA limits should be modified, and/or the timeline code
> should be updated with Izzy's recent modifications.
> - RF: runs 16089, 16096, 16089 are slightly off specs. The last two are
> important as they are the lumi scans runs.
> Please let me and Li (our chef) know of your cooking needs, in case you
> need to do further calibration work. I'd like to call for the pass1 review
> in a week or so, if possible.
> Thank you and best regards,
> Silvia
>
>
>
>
>
> _______________________________________________
> Clas12_calcom mailing list
> Clas12_calcom at jlab.org
> https://mailman.jlab.org/mailman/listinfo/clas12_calcom
>
More information about the Clas12_calcom
mailing list