<html>
  <head>
    <meta content="text/html; charset=UTF-8" http-equiv="Content-Type">
  </head>
  <body bgcolor="#FFFFFF" text="#000000">
    <div class="moz-cite-prefix">Dear FTers,<br>
      here are the minutes of toda'ys meeting with homeworks for the
      next meeting.<br>
      Feel free to add or point out what missed.<br>
      As discussed I created a doodle<br>
      <a class="moz-txt-link-freetext" href="https://urldefense.proofpoint.com/v2/url?u=https-3A__beta.doodle.com_poll_tsyaq9kz7ck34npb&d=DwMDaQ&c=lz9TcOasaINaaC3U7FbMev2lsutwpI4--09aP8Lu18s&r=cVGcBoL0aH8k8TAWsF2OUQLRME6Fr2Q-yDWM-WA_5zY&m=g74ZEGV0KPmeVfjiqeMhnGaKAd_xh6Y8fEtOfu_vWNc&s=sZGhawrT-gazCDOC8oDz_czfH1lhOHtwfVpVWgjWyCQ&e=">https://beta.doodle.com/poll/tsyaq9kz7ck34npb</a><br>
      for next Tuesday (as a template for next weeks). I started at
      10:00AM EDT (hope it shows up right in your time zone) ending at
      1:00PM.<br>
      Please express your preference<b> by Sunday night </b>so that on
      Monday I can call the meeting.<br>
      Thanks again for attending<br>
      Marco<br>
      <br>
      MINUTES and HOMEWORKS<br>
      - after discussing the plan circulated last week we all agree on
      the need of a organized run plan for all activities related to the
      FT (from the HW to the shifts, tfrom the calibrations to thehigh
      level analysis) <br>
      - all sub-groups (MesonEx, LDM, VeryStrange and Hybrid Baryons)
      are requested to contribute to set up a full  working detector and
      a complete framework to monitor, calibrate it before to focus on
      high level-specific analyses. <br>
      - at the next meeting we'll present a draft of a detailed FT
      commissioning plan completing what already in CalCom hands<br>
      - based on the message below, we'll prepare a detailed list of
      duties and tasks for the commissioning and production runs<br>
      - provide a repository with all the relevant documents and
      documentations to make easy to get used with the FT systems<br>
      - we'll use the engineering run as a good test for documentations
      implementing the feedback in the manual/procedures for the first
      run<br>
      - prepare a list of histos (same as CLAS6 MONB) to check FT vitals<br>
      <br>
      <br>
      <br>
      Marco Battaglieri wrote:<br>
    </div>
    <blockquote cite="mid:59D3D9A5.9010608@ge.infn.it" type="cite">
      
      Dear FT enthusiasts,<br>
      as you know the commissioning of CLAS12 will happen shortly
      (beginning of December) and after the 30 days allocated,  we'll 
      run for several months the RG-A run.<br>
      <br>
      Over the next month we should provide:<br>
      - a detailed commisioning plane<br>
      - a detailed schedule for the commisining compliant with the
      general CLAS12 commisioning plan<br>
      - a list of 'detector experts' and other collaborators (students?
      postdocs?) that will be trained during the commissioning to gain
      enough confidence with the detector<br>
      - a detailed shift list for commisioning and RG-A run time to be
      sure we have enough <br>
      - a list of analysis/calibrators working off-line during
      commisioning/run time<br>
      It would be also very useful to check the status of:<br>
      - tools necessary to operate, monitor, and calibrate the FT<br>
      and define a common set to be  tested and used.<br>
      <br>
      In parallel we should check the status of FT GEMC/REC sw to be
      sure that all tools are in place.<br>
      <br>
      We already discussed that, during regular data taking, there will
      be only one FT expert-on-call serving the 3 subsystems and this
      requires that experts of each sub systems will share information
      and details.<br>
      <br>
      Here is a (preliminary) list of sub-task experts/coordinators:<br>
      <br>
      FT-Cal<br>
      - hardware expert: she/he knows how the detector works, how to
      monitor and judge if it is healthy it and names of (off-site) 
      specialists that may take care of hw issues or help on the phone<br>
      - sim/rec expert: she/he knows how the Sim/Rec code works, take
      care of standard and exceptional (such as develop patches)  code
      maintenance <br>
      - calibration coordinator: she/he coordinate the calibration
      effort, check results of calibration team <br>
      <br>
      FT-Hodo <br>
      - hardware expert<br>
      - sim/rec expert<br>
      - calibration coordinator<br>
      <br>
      FT-Trck <br>
      - hardware expert<br>
      - sim/rec expert<br>
      - calibration coordinator<br>
      <br>
      - FT trigger expert: she/he has knowledge of the hw and sw behind
      the trigger, collect requirements based on physics and acts as a
      link with the trigger/daq group<br>
      - FT data cooking expert: she/he knows the machinery requested to
      cook a file on the farm, keep trace of the current cooking status,
      collect the monitoring histos (or equivalent) verifying and
      checking  that the FT information are always present in the data
      stream<br>
      <br>
      - MesonEx analysis coordinator: she/he coordinates analysis
      efforts providing all the necessary information about the history
      of collected data, correction/tools to be used, warnings, ... to
      any new data analyzer<br>
      - VeryStrange analysis coordinator<br>
      - LMD analysis coordinator<br>
      - HybridBaryon analysis coordinator<br>
      - Pentaquark analysis coordinator<br>
      <br>
      + list of students/postdocs or any seniors interested to
      FT-involved analyses<br>
      <br>
      We should appoint a responsible for each activity in order to have
      a well organized structure ready for data taking day-0.<br>
      Each expert will act as link to other detector/group/experiments
      subtasks  and should come with an estimate of resources needed to
      manage the task.<br>
      Please, identify among your groups, people that may lead the
      effort and resources to accomplish the listed tasks and send it to
      me by <b>Tue Oct 10 </b><br>
      <br>
      I propose to resume the Wednesday FT meeting to define, prepare
      and discuss  this plan in details.<br>
      Let's start next week (<b>Oct 11 at 9:00 EST</b>) with the old
      timetable (and discuss if we want to keep it!).<br>
      I'll send a reminder shortly before<br>
      Cheers<br>
      Marco<br>
      <br>
      <br>
      <br>
      <br>
    </blockquote>
    <br>
  </body>
</html>