[Clas12_rgb] 6 test runs ready for pass2 testing
Zhiwen Zhao
zwzhao at jlab.org
Mon Apr 17 23:00:49 EDT 2023
Silvia and all
v28.56 is done
v28.55 was cooked with 8.7.1 instead of 8.7.0
Zhiwen
On 4/17/2023 4:33 PM, Silvia Niccolai via Clas12_rgb wrote:
> Dear all,
> I don't want to jinx it, but it seems that pass2 is closer than ever :-)
> Zhiwen just cooked our 6 test runs using CJ 8.7.0 and the very latest ECAL
> calibrations and SF parametrization. I'd like to ask all analyzers to
> please test them. They can be found at:
> /volatile/clas12/rg-b/production/recon/pass0/v28.55/dst/train/
> In the meantime, Zhiwen is also cooking the same 6 runs using 8.5.0 and
> the same calibrations as the 8.7.0 cooking. They trains will be soon
> available at:
> /volatile/clas12/rg-b/production/recon/pass0/v28.56/dst/train/
> It would be great if you could also check these runs, once ready, and
> compare to the 8.7.0 cooking, in order to complete the validation of the
> reconstruction software.
> Thank you all very much for your efforts and support.
> Best regards,
> Silvia
>
>
> _______________________________________________
> Clas12_rgb mailing list
> Clas12_rgb at jlab.org
> https://mailman.jlab.org/mailman/listinfo/clas12_rgb
More information about the Clas12_rgb
mailing list