<p>Dear All,</p>
<p>as it was informally circulated in the collaboration, there will
be no run time assigned to RG-K in 2021, contrary to what foreseen
before the accelerator shut-down due to the COVID-19 medcon6. We
will be considered in the next scheduling for FY22 and on.</p>
<p>Annalisa<br>
</p>
<div class="moz-forward-container"><br>
<br>
-------- Messaggio Inoltrato --------
<table class="moz-email-headers-table" cellspacing="0"
cellpadding="0" border="0">
<tbody>
<tr>
<th valign="BASELINE" nowrap="nowrap" align="RIGHT">Oggetto:
</th>
<td>FY21 acc schedule</td>
</tr>
<tr>
<th valign="BASELINE" nowrap="nowrap" align="RIGHT">Mittente:
</th>
<td>Marco Battaglieri <a class="moz-txt-link-rfc2396E" href="mailto:battagli@jlab.org"><battagli@jlab.org></a></td>
</tr>
<tr>
<th valign="BASELINE" nowrap="nowrap" align="RIGHT">A: </th>
<td>Annalisa D'Angelo <a class="moz-txt-link-rfc2396E" href="mailto:annalisa.dangelo@roma2.infn.it"><annalisa.dangelo@roma2.infn.it></a></td>
</tr>
</tbody>
</table>
<br>
<br>
Dear Annalisa,<br>
unfortunately the COVID pandemic strongly affected the next year
CEBAF scheduling postponing the beginning of the operations and
reducing the expected running time. On top of that, in FY21 we are
expecting to run the machine at lower energy (max 9.9 GeV) for
only 19 (+1 contingency) weeks. These conditions made impossible
to schedule RGK in FY21 as previously planned. The RG you
represents will be considered for the next scheduling cycle (FY22
and on). The official schedule for FY21 will be shortly available
to public.<br>
I’m sorry about that but we had to face an unprecedented situation
that affected the whole lab operations. Please let me know if any
further clarification are needed.<br>
Cheers<br>
Marco</div>