[Clas12_rich] RICH detector slow controls location
Serguei Boiarinov
boiarino at jlab.org
Thu Jul 14 15:27:04 EDT 2016
Marc,
patch panels on level2 can be removed, nobody need them. However Eugene pointed out that
you better install your stuff on level3, since it will control equipment installed on
level4. On level3 left side is available.
Sergey
----- Original Message -----
From: "Serguei Boiarinov" <boiarino at jlab.org>
To: "Eugene Pasyuk" <pasyuk at jlab.org>
Cc: "Marc McMullen" <mcmullen at jlab.org>, "Bob Miller" <rmiller at jlab.org>, "clas12 rich" <clas12_rich at jlab.org>, "dsg-internal" <dsg-internal at jlab.org>, "Douglas Tilles" <tilles at jlab.org>, "Denny Insley" <dinsley at jlab.org>, "Patrizia Rossi" <rossi at jlab.org>, "Serguei Boiarinov" <boiarino at jlab.org>
Sent: Thursday, July 14, 2016 10:07:23 AM
Subject: Re: RICH detector slow controls location
Marc,
we can look together, I'm in office, let me know.
Sergey
----- Original Message -----
From: "Eugene Pasyuk" <pasyuk at jlab.org>
To: "Marc McMullen" <mcmullen at jlab.org>, "Serguei Boiarinov" <boiarino at jlab.org>
Cc: "Bob Miller" <rmiller at jlab.org>, "clas12 rich" <clas12_rich at jlab.org>, "dsg-internal" <dsg-internal at jlab.org>, "Douglas Tilles" <tilles at jlab.org>, "Denny Insley" <dinsley at jlab.org>, "Patrizia Rossi" <rossi at jlab.org>
Sent: Thursday, July 14, 2016 8:29:40 AM
Subject: Re: RICH detector slow controls location
Hi Marc,
I am on vacation till the end of the next week.
There is some space in the racks on the third level of the forward carriage. There are two racks on each side of the beam with Caen HV power supplies and distribution boxes. Top part of these racks is not occupied yet.
I think it would be a good place if Sergey agrees.
-Eugene
----- Original Message -----
> From: "Marc McMullen" <mcmullen at jlab.org>
> To: "Eugene Pasyuk" <pasyuk at jlab.org>, "Bob Miller" <rmiller at jlab.org>, "clas12 rich" <clas12_rich at jlab.org>,
> "dsg-internal" <dsg-internal at jlab.org>, "Doug Tilles" <tilles at jlab.org>, "Denny Insley" <dinsley at jlab.org>
> Cc: "Patrizia Rossi" <rossi at jlab.org>
> Sent: Thursday, July 14, 2016 7:16:57 AM
> Subject: RICH detector slow controls location
> Hi Eugene,
>
> I would like to meet in the hall to discuss the location of the slow
> controls equipment for the RICH detector on the forward carriage. The
> DSG would require about 18U (~32") total of rack. This should give
> enough space to install the equipment.
>
> I will be heading over to the hall this morning (8am) to have a look at
> the area, if there is a time this morning which is good for you please
> let me know.
>
> Regards,
>
>
>
> --
> Marc McMullen
> Detector Support Group
> 757-269-7738
More information about the Clas12_rich
mailing list