[Clas12_rich] RICH electronics on Forward Carraige Level 3
Eugene Pasyuk
pasyuk at jlab.org
Wed Jul 20 16:54:49 EDT 2016
All existing VXS crates on the forward carriage are essentially full. There could be space in existing crates on the pie tower, but this will require much longer fibers. They will have to go into the service loop to accommodate forward carriage motion.
-Eugene
----- Original Message -----
> From: "Valery Kubarovsky" <vpk at jlab.org>
> To: "Tyler Lemon" <tlemon at jlab.org>
> Cc: "clas12 rich" <clas12_rich at jlab.org>, "Eugene Pasyuk" <pasyuk at jlab.org>, "Patrizia Rossi" <rossi at jlab.org>
> Sent: Wednesday, July 20, 2016 4:48:46 PM
> Subject: Re: [Clas12_rich] RICH electronics on Forward Carraige Level 3
> Tyler,
> All components are for one sector only.
> The DAQ electronics most probably will go to another place.
> I hope that we don't need new crate for these 5 boards. Chris is investigating
> this question right now.
> Valery
>
> ----- Original Message -----
>> From: "Tyler Lemon" <tlemon at jlab.org>
>> To: "clas12 rich" <clas12_rich at jlab.org>, "Eugene Pasyuk" <pasyuk at jlab.org>
>> Cc: "rossi patrizia" <rossi at jlab.org>
>> Sent: Wednesday, July 20, 2016 4:17:06 PM
>> Subject: [Clas12_rich] RICH electronics on Forward Carraige Level 3
>
>> Dear Eugene and Valery,
>>
>> Eugene,
>> We will need about one rack total for the RICH electronics. Attached is an
>> updated the drawing from Marc of the racks C3-4 and C3-5 on the Forward
>> Carriage, one is a close up on the racks, the other a farther away view. In the
>> drawing, C3-4 shows the RICH cRIO chassis and FTOF HV supply, C4-5 shows the
>> RICH CAEN SY4527 and R649 distribution with the LTCC HV supply below. In Hall
>> B, there is currently only the LTTC HV supply in rack C3-5 with 20.5U of free
>> space above it. This free space should be enough for the RICH HV supply and a
>> VXS crate for the electronics readout.
>>
>> After discussion, DSG determined it would be best to put these electronic
>> components in the available space in the rack that is close to the cRIO chassis
>> since the detector will be relatively near those racks once installed and it
>> would also allow for shorter connections for the HV/LV interlocks to the cRIO.
>>
>> Valery,
>> Is the quantity of components you mentioned yesterday for two RICH modules? If
>> not, rack space will also be needed for the HV and electronics readout for the
>> second RICH that will be built. Looking in Hall B today, rack C3-7 would have
>> space. Attached are pictures from today of that rack.
>>
>> Best regards,
>> Tyler
>>
>> _______________________________________________
>> Clas12_rich mailing list
>> Clas12_rich at jlab.org
> > https://mailman.jlab.org/mailman/listinfo/clas12_rich