[Clas12_rich] RICH assembly structure anchoring approval

Saptarshi Mandal mandal at jlab.org
Mon May 23 13:45:54 EDT 2016


Tyler,

I'm waiting on information from the RICH group about their cooling 
system. I need that to evaluate relief valves for the system.

About, the RICH assembly structure, the engineers from RICH should 
calculate the bolts sizes, lift points, etc. I'm not sure which drawings 
you're referring to, since we only received stp files from the RICH 
group which I had forwarded to you on May 5.

Saptarshi

On 5/23/2016 8:52 AM, Tyler Lemon wrote:
> Dear Saptarshi,
>
> On May 5, we emailed you about the engineering drawing for the RICH assembly structure. Has there been any progress on the approval of the bolt size indicated in the drawing and the lift points of the structure?
>
> Also, George has created a preliminary diagram for the cooling circuit and has previously sent it. Due to the pressure required to cool the electronics with the compressed air, the system requires ASME valves and tanks that would need approval. Has there been any progress on this ASME approval?
>
> Please let me know the status of both the assembly structure approval and the ASME approval. Thanks in advance.
>
> Best regards,
> Tyler Lemon
> Detector Support Group

-------------- next part --------------
A non-text attachment was scrubbed...
Name: mandal.vcf
Type: text/x-vcard
Size: 239 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/clas12_rich/attachments/20160523/9972a80d/attachment.vcf>


More information about the Clas12_rich mailing list